• Title/Summary/Keyword: masonry construction

Search Result 168, Processing Time 0.024 seconds

Performance of reinforced concrete moment resisting frames in Sarpol-e Zahab earthquake (November 12, 2017, Mw=7.3), Iran

  • Mohammad Amir Najafgholipour;Mehrdad Khajepour
    • Earthquakes and Structures
    • /
    • v.25 no.1
    • /
    • pp.1-13
    • /
    • 2023
  • Reinforced concrete (RC) moment frames are used as lateral seismic load resisting systems in mid- and high-rise buildings in different regions of the world. Based on the seismic design provisions and construction details presented in design codes, RC frames with different levels of ductility (ordinary, intermediate, and special) can be designed and constructed. In Iran, there are RC buildings with various uses which have been constructed based on different editions of design codes. The seismic performance of RC structures (particularly moment frames) in real seismic events is of great importance. In this paper, the observations made on damaged RC moment frames after the destructive Sarpol-e Zahab earthquake with a moment magnitude of 7.3 are reported. Different levels of damage from the development of cracks in the structural and non-structural elements to the total collapse of buildings were observed. Furthermore, undesirable failure modes which are not expected in ductile seismic-resistant buildings were frequently observed in the damaged buildings. The RC moment frames built based on the previous editions of the design codes showed partial or total collapse in this seismic event. The extensive destruction of RC moment frames compared with the other structural systems (such as braced steel frames and confined masonry buildings) was attributed not only to the deficiencies in the construction practice of these buildings but also to the design procedure. In addition, the failure and collapse of masonry infills in RC moment frames were frequent modes of failure in this seismic event. In this paper, the main reasons related to design practice which led to extensive damage in the RC moment frames and their collapse are addressed.

Necessity of Improvements on Code of Practice at the Demolition Work considering Building Structure Type : Based on Demolition work of Permission and Registration (건축물의 구조유형을 고려한 해체공사 제도 개선 방안 필요성 - 해체공사의 허가 및 신고를 기준으로 -)

  • Shim, Yukyung;Jeong, Jaewook;Lee, Jaehyun;Jeong, Jaemin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.6
    • /
    • pp.66-74
    • /
    • 2020
  • To prevent incident of demolition work the Building Management Act was implemented to manage demolition work. According to this law, buildings with the scale upper than 500㎡ of floor area are classified as permission to conduct the demolition work, however it may be hard to perform safety management at demolition work. In addition, the risk level of demolition work is varied with related to the structure type. So, the purpose of this study is to suggest the improvements of criteria on demolition work considering building structure types including small-scale structures such as masonry, wooden, and other structure. The research process was conducted by three steps. (I) Application of Building Management Act; (II) Analysis of demolition work by structure types; and (III) Subdivision of permission targets by building structure types. The result of this study, permission ratio was only 10% for total demolition work and 2.43% for masonry. Because the masonry, wooden, and other structure types are concentrated on a floor area of small-scale, the separate criteria of demolition work is need to prevent the accident and fatal incident. Through the results, the decision maker can be utilized (1) For the special building structure types, the criteria of enhanced safety management are applied by referring to the overseas law ; and (2) The demolition work can be considered by the criteria of separate permission in terms of structure types.

Analysis of work times and postures occurring relating to stone channel work in forest engineering (돌수로공의 작업시간 및 작업자세 분석에 관한 연구)

  • Yeom, In-Hwan;Choi, Yeon-Ho;Kim, Myeong-Jun;Kweon, Hyeong-Keun;Lee, Joon-Woo;Kim, Je-Su;Park, Bum-Jin
    • Korean Journal of Agricultural Science
    • /
    • v.38 no.1
    • /
    • pp.101-108
    • /
    • 2011
  • In forest work, working conditions are very hard to improve. The proper distribution of work time and good posture is believed to bring about direct improvements such as accident prevention. On this, this study has analyzed forest workers' posture and their working hours in order to improve their working conditions in stone channel work. Authors has chosen several core elements of stone channel work to focus on, which include stone masonry, excavation of bed, moving stone, directing work, choosing stone, and breaking stone. The ratio of real working time over total working time was shown as 84.6%. As for the time ratio of each elemental work over the real working time, the stone masonry was 60.4%, the directing work was 15.1%, moving stone was 12.1%, choosing stone was 7.1%, breaking stone was 3.3%, and excavation of bed was 2.0%. According to the analytical results provided by OWAS, the ratio of category III (Work posture has a distinctly harmful effect on the musculoskeletal system) has shown that moving stone turned out 65.2%, choosing stone was 61.5%, stone masonry was 46.1%, breaking stone was 14.3%, excavation of bed was 12.5% and directing work was 6.8%. Furthermore, the ratio of category IV (Work posture with an extremely harmful effect on the musculoskeletal system) has shown that excavation of bed turned out 37.5%, breaking stone was 28.6%, stone masonry was 27.3%, choosing stone was 7.7%, moving stone was 6.1% and directing working was 4.5%. These results are expected to be utilized for the improvement with respect to both working methods in the stone channel work and the workers' working posture.

Evaluation of Spraying Characteristics for Masonry Buildings Seismic Retrofit Fiber-Reinforced Mortar (조적조 내진보강용 섬유보강 모르타르의 분사특성 평가)

  • Hwang, Byoung-Il;Park, Jong-Pil;Yoo, Byung-Hyun;Lee, Dong-gyu
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.11
    • /
    • pp.37-43
    • /
    • 2020
  • The seismic reinforcement ratio of SOC facilities, such as domestic roads and railroads, is 96%. Out of approximately 7 million buildings as of 2016, only 0.51 million buildings with seismic performance were secured. Although the proportion of masonry structures is 38.8% of the total buildings, there is almost no seismic resistance, only 2.0%. To solve the problem in Korea, government-level seismic measures are being promoted, but the situation is insufficient. Overseas, the UBC research team in Vancouver, Canada, has developed and used EDCC to reinforce the seismic performance of masonry buildings. EDCC is a construction material that can secure concrete ductility capability by mixing fibers and secure deformation resistance of concrete through bridging action. It is necessary to examine various materials because EDCC is not used as a spray type of secure seismic reinforcement. In this study, as part of the research and development of spraying materials to improve the durability of masonry buildings, this study examined the spraying characteristics of fiber-reinforced mortar according to fiber use and the viscosity change according to the use of thickener. As a result, the working performance of the fiber-reinforced mortar for seismic reinforcement was improved when using 1% fiber and 1% thickener.

Structural Characteristics Evaluation Considering Construction Circumstances of Cheomseongdae (첨성대의 축조현황을 고려한 구조적 특성평가)

  • Kim, Ho-Soo;Kim, Jung-Hwan
    • Journal of Korean Association for Spatial Structures
    • /
    • v.15 no.3
    • /
    • pp.69-76
    • /
    • 2015
  • Cheomseongdae is the masonry stone structure with the cultural and historical values. But, this structure has the various damages such as cracks, gaps, slope variations and ground subsidence. So, the interests for the safety security in the structural parts have been increased. Therefore, this study performs the structural modelling which considers the several damage cases, and then evaluates the structural behavior characteristics through the discrete element analysis. Especially, this study checks the swelling and displacement gap of the whole structure and the separation between the neighboring members.

The Estimation of Firing Temperature of Clay Brick used in Modern Architecture (근대 조적건축물에 이용된 점토벽돌의 소성온도 추정)

  • Kwon, Eun-Hee;Ahn, Jae-Cheol;Kang, Byeung-Hee;Kim, Ki-Soo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05a
    • /
    • pp.103-105
    • /
    • 2011
  • The purpose of this study is to suggest basic data which is firing technique at manufacturing time for preservation and rehabilitation of masonry modern architecture by assumed firing-temperature. It could be possible to estimate firing-temperature at manufacturing time through the result of the experiments, XRD and changed absorbing ratio from re-firing.

  • PDF

FE Model Calibration of Myeong-dong Cathedral Using Vibration Measurement Data (진동 계측 데이터를 이용한 명동 성당 유한요소 모델 개선)

  • Hwang, In Hwan;Jeon, Jin Yong;Kim, Ji Young
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.23 no.11
    • /
    • pp.987-995
    • /
    • 2013
  • One of the most important processes to accurately predict structural responses is to evaluate accurate structural dynamic characteristics using finite element(FE) models. The numerical structural dynamic characteristics usually show considerable discrepancies with the measured ones because structural details are commonly simplified in the FE models. To identify such discrepancies, FE models of them have been calibrated using the measured dynamic characteristics in previous researches. In this study, the dynamic characteristics were measured for a historic cathedral and the FE model of it was calibrated using the measured results as a reference. Finally, a procedure of the FE model construction for the unreinforced masonry cathedral were tentatively proposed.

A Study in the Water Leakage Prevention around the Windows with the Stone Materials in the Apartment House (공동주택 외부 석재마감에 따른 창호주위 누수방지에 관한 연구)

  • Yun, Hong-Jung;Cho, Tae-Jea
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2006.11a
    • /
    • pp.117-121
    • /
    • 2006
  • This study intends to suggest the effective methods for water leakage prevention around the windows in stone works to up-grade the outdoor public space that has been taken much portion of apartment housing trends. The subjects of the study was selected among the domestic subcontractors of stone works. There are four methods for water leakage prevention around the windows; Firstly, the painting water-proof method after the masonry. Secondly, the urethane water-proof method after galvanizing panels on the gap. Thirdly, the separation method between stone and substructure and the last one is water-proof method that they put some water-proof screen between stone and substructure with the EPDM sheets. According to the analysis of the water-proof effects, constructability and planning, we could approach to conclusion that the most influent items to the water-leakage are the filling material's deformation, the state of oxygenation and deterioration of work skill. Among the water-proof methods in construction the EPDM sheet is most excellent water-proof method to meet the technical conditions. However, we have to apply it to stone works as a water-proof method for the decrease of the leakage defects after standardizing the materials, test and construction skill because there are many work skills according the subcontractors.

  • PDF

The analysis of defects types and patterns in high-rise residential buildings (초고층 주상복합 건물의 하자 발생 유형 및 분석 연구)

  • Seo, Jang-Woo;Kang, Kyung-In
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.2
    • /
    • pp.93-101
    • /
    • 2009
  • Recently, public interest in housing defects, such as construction errors, occupiers' complaints, faults in production, and so on, is increasing. In addition, the construction requirements of high-rise residential buildings have increased, due to the higher prices of urban areas, especially in metropolitan areas. While previous research has focused on the defects occurring in apartment housing complexes, research has not been carried out on the defects occurring in high-rise residential buildings. In this paper, the defects patterns and characteristics of high-rise residential buildings are examined and analyzed and a defect management plan is then suggested. In order to do this, we collected the defects data of high-rise residential buildings recorded by 2,299 of 2,327 occupants. The defect occurrence rate (DOR) in the residential area is 98.8%. The frequency rate of defect occurrence over the total defect occurrence since building completion is 63.28% during the first year, 24.63% (second year), 6.88% (third year), 2.27% (fourth year), and 2.53% (fifth year). The result of correlation analysis between work types showed that there is a relationship between the built-in furniture and electronics (F&E) and painting works, and the F&E and masonry works, such as marble finishing. We expect that this research will assist in the efforts to decrease the number of defects in high-rise buildings.

A Modern Interpretation of the Resources Required for the Construction of Paldal-mun in the Joseon Dynasty through the Analysis of HwaSungSungYouk-EuGye (화성성역의궤 분석을 통한 조선시대 팔달문 건설 소요자원의 현대적 해석)

  • Kim, Kyoon-Tai
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.6
    • /
    • pp.641-652
    • /
    • 2021
  • Although detailed information on the construction of Hwasung was recorded in the Hwasungsungyouk-eugye, analysis and evaluation from the perspective of modern construction management were limited. Therefore, in this study, construction management related information such as time, cost, and manpower was analyzed for Paldal-mun. The main work involved in the construction of Paldal-mun was foundation work and masonry work, and the total construction period was 6 months, with the overall construction progressing very quickly. The total cost of the construction of Paldal-mun was about 52,423 Nyong, which can be divided into about 15,9332 Nyang for materials and 36,4901 Nyang for labor cost. Converting these to present value, the material cost is about 1.1 billion won and the labor cost is about 2.5 billion won, and the sum of these is about 3.6 billion won. In the future, we plan to conduct additional research in this area such as deriving detailed input manpower related to the work period for each type of work.