1 |
Ahn, H.S., Jeong, J.W., and Kim, W.S. (2019). "A Study on the Detailed Guidelines for Building Demolition Work." Construction Safety Association of Korea and Korea Infrastructure Safety Corporation, pp. 1-220.
|
2 |
Approved Code of Practice for Demolition : BS 6187 (2012). (Aug. 24, 2020).
|
3 |
BUILDING MANAGEMENT ACT (2020). (Jul. 30, 2020).
|
4 |
Cha, G.C., and Kim, S.G. (2012). "Analysis of Case and Cause of Collapse Incidents in Demolition Work." Korean Structural Engineers Association, 19(3), pp. 25-26.
|
5 |
Cha, H.J., and Choi, J.S. (2007). "Evaluation of Safety Items in Building Demolition Works Utilizing AHP Method." Journal of the Korean Architectural and Municipal Engineering Society, JKIBC, 7(3), pp. 99-105.
|
6 |
Choi, J.S., and Heo, S.T. (2009). "Development of Safety Management Manual for Deconstruction Works." Journal of the Korea Institute of Construction Engineering and Management. 11(6), pp. 45-53.
DOI
|
7 |
Choi, J.S., Heo, S.T., Go, W.J., and Lee, H.M. (2010). "Development of Integrated Safety Management Guidelines and Applicability Validation - Focused on the Building Deconstruction Works." Korean Journal of Construction Engineering and Management. KICEM, 11(6), pp. 45-53.
DOI
|
8 |
Code of Practice for Demolition work. (2015). (Aug. 22, 2020).
|
9 |
Code of Practice for Demolition : SS 557 (2010). (Aug. 22, 2020).
|
10 |
Code of Practice for Demolition of Building (2004). (Aug. 22, 2020).
|
11 |
Gangdong-gu Office. , "Dunchon Jugong Apartment Reconstruction Project."
|
12 |
Kim, W.P. (2017). "Rewriting Statistical Analysis, Basic Statistical Analysis" Wisein Company, 2017.06., pp. 265-292.
|
13 |
Kim, W.S., Ji, M.H., Choi, S.M., and Ahn, C.W. (2020). "Development Direction and Introduction of Permit System of Building Demolition Work." Journal of the Architectural Institute of Korea. 40(1), pp. 425-425.
|
14 |
KOSHA (2016). "Trapped by Wall Collapsing while Working with a Hammer to Demolition part of the Inner Wall." 2016.8.
|
15 |
KOSHA (2017). "Standard Safety Work Procedure for Demolition Work."
|
16 |
Lee, H.M., and Go, S.S. (2008). "A Study on the System Development for Optimum Method Selection in Demolition Works." Journal of the Architectural Institute of Korea Structure and Construction, 24(5), pp. 193-200.
|
17 |
Ministry of Land, Infrastructure and Transport (2020). "The number of demolition buildings for Housing in 2010 to 2018."
|
18 |
Park, J.S., Song, T.H., and Choi, D.H. (2013). "Applicable Building Range for the Introduction of the Building Separation and Dismantling System." Journal of the Korean Recycled Construction Resources Institute, 1(3), pp. 189-196.
DOI
|
19 |
Shin, H.W., Song, C.Y., Kong, Y.T., Im, I.H., and Choie, D.H. (2019). "Support for decision-making of small-scale old building safety management." Journal of the Korean Geographlcal Society, pp. 53-54.
|
20 |
Ryu, H. (2019). "Safety Management Manual for Building Demolition Work", Seoul Metropolitan Government, (Aug. 24, 2020).
|