• Title/Summary/Keyword: management priority

Search Result 1,932, Processing Time 0.027 seconds

A Study on the Strategic Priority for Defense Quality Management Factors by using Analytic Hierarchy Process (AHP기법을 활용한 국방품질경영요소의 전략적 우선순위 도출에 관한 연구)

  • Kim, Soon-Yeong
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.35 no.3
    • /
    • pp.217-224
    • /
    • 2012
  • This study is to review strategic priority for Defense Quality Management Factors of the Defense Agency for Technology and Quality. It is necessary to decide which quality factors are more important and which quality factors are relatively less important. In this study, Analytic Hierarchy Process (AHP) method was used in assigning the factors' weights. The survey of fifty one members participated in Defense R&D Programs showed that the Consistency Ratio was under 0.1 in evaluation items and factors.

A Dynamic Priority Control Method to Support an Adaptive Differentiated Service in Home Networks (홈 네트워크에서 적응적 차등화 서비스를 위한 동적 우선순위 조절 기법)

  • 정광모;임승옥;민상원
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.29 no.7B
    • /
    • pp.641-649
    • /
    • 2004
  • We propose a dynamic traffic management model which uses adaptive priority reassignment algorithm to deliver service differentiation in home networks, and implement adaptive priority reassignment algorithm using FPGA. The proposed architecture is designed to handle home network traffic without the need for signaling protocol. We categorize home network traffic into three kinds of traffic class: control data traffic class, the Internet data and non-real-time data traffic class, and multimedia data traffic class (include non-real-time and real-time multimedia data traffic). To support differential service about these kinds of traffic class, we designed and implemented a traffic management framework that dynamically change each traffic class priority depending on bandwidth utilization of each traffic class.

A design and implementation of a priority and context-aware event ID for U-City integrated urban management platform in U-City (U-City 도시통합관제플랫폼의 상황 이벤트 ID, 우선순위 기능 설계 및 구현)

  • Song, Kyu-Seog;Ryou, Jae-Cheol
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.35 no.6B
    • /
    • pp.901-907
    • /
    • 2010
  • This paper proposes a standard method for linking data between the U-City Integrated Urban Management Platform and u-service systems through systemization of event identification and standardization of event priority. By applying the proposed method, the incoming events to the Management Platform are listed and processed according to their priority of urgency. The application of the systemized event ID and standardized event priority enables prompt counter-measures against urban emergencies and disasters, which improves the efficiency of business processes by reducing the time and cost to complete required actions.

Priority Assessment for Groundwater Contamination Management Using Analytic Hierarchy Process (AHP) and GIS Approach (계층분석법(AHP)과 GIS를 이용한 고양시 일대의 지하수오염 관리우선순위 평가)

  • Lee, Moung-Jin;Hyun, Yunjung;Kim, Youngju;Hwang, Sang-Il
    • Journal of Soil and Groundwater Environment
    • /
    • v.18 no.5
    • /
    • pp.26-38
    • /
    • 2013
  • In this study, priority for groundwater contamination management was assessed based on regional vulnerability in Goyang-si area, Gyonggi-do, Korea using analytic hierarchy process (AHP) and geographic information system (GIS). We proposed a concept for regional vulnerability to groundwater contamination with using socio-environmental vulnerability factors, which can be classified into three properties including regional hydrogeological property, contamination property, and groundwater use property. This concept is applied to Goyang-si area. For AHP analysis, an expertise-targeted survey was conducted. Based on the survey, a total of 10 factors (criteria) and corresponding weights for regional vulnerability assessment were determined. The result shows that regional contamination property is the most weighted factor among the three property groups (hydrogeological property: contamination property: groundwater use property = 0.3: 0.4: 0.3). Then, database layers for those factors were constructed, and regional vulnerability to groundwater contamination was assessed by weighted superposition using GIS. Results show that estimated regional vulnerability score is ranged from 22.7 to 94.5. Central and western areas of Goyang-si which have groundwater tables at shallow depths and are mainly occupied by industrial and residential areas are estimated to be relatively highly vulnerable to groundwater contamination. Based on assessed regional vulnerability, we classified areas into 4 categories. Category 1 areas, which are ranked at the top 25% of vulnerability score, take about 2.8% area in Goyang-si and give a high priority for groundwater contamination management. The results can provide useful information when the groundwater management authority decide which areas should be inspected with a high priority for efficient contamination management.

Identifying Priority Area for Nonpoint Source Pollution Management and Setting up Load Reduction Goals using the Load Duration Curve (부하지속곡선을 이용한 비점오염원 우선관리 지역 선정 및 관리목표 설정 연구)

  • Jang, Sun Sook;Ji, Hyun Seo;Kim, Hak Kwan
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.60 no.5
    • /
    • pp.17-27
    • /
    • 2018
  • The objective of this study is to identify the priority area where the nonpoint source pollution (NPS) management is required and to set up the load reduction goals for the identified priority area. In this study, the load duration curve (LDC) was first developed using the flow and water quality data observed at 286 monitoring stations. Based on the developed LDC, the priority area for the NPS pollution management was determined using a three-step method. The 24 watersheds were finally identified as the priority areas for the NPS pollution management. The water quality parameters of concern in the priority areas were the total phosphorus or chemical oxygen demand. The load reduction goals, which were calculated as the percent reduction from current loading levels needed to meet target water quality, ranged from 67.9% to 97.2% during high flows and from 40.3% to 69.5% during moist conditions, respectively. The results from this study will help to identify critical watersheds for NPS program planning purposes. In addition, the process used in this study can be effectively applied to identify the pollutant of concern as well as the load reduction target.

Heuristics for Job Shop Scheduling Problems with Progressive Weighted Tardiness Penalties and Inter-machine Overlapping Sequence-dependent Setup Times

  • Mongkalig, Chatpon;Tabucanon, Mario T.;Hop, Nguyen Van
    • Industrial Engineering and Management Systems
    • /
    • v.4 no.1
    • /
    • pp.1-22
    • /
    • 2005
  • This paper presents new scheduling heuristics, namely Mean Progressive Weighted Tardiness Estimator (MPWT) Heuristic Method and modified priority rules with sequence-dependent setup times consideration. These are designed to solve job shop scheduling problems with new performance measures - progressive weighted tardiness penalties. More realistic constraints, which are inter-machine overlapping sequence-dependent setup times, are considered. In real production environments, inter-machine overlapping sequence-dependent setups are significant. Therefore, modified scheduling generation algorithms of active and nondelay schedules for job shop problems with inter-machine overlapping sequence-dependent setup times are proposed in this paper. In addition, new customer-based measures of performance, which are total earliness and progressive weighted tardiness, and total progressive weighted tardiness, are proposed. The objective of the first experiment is to compare the proposed priority rules with the consideration of sequence-dependent setup times and the standard priority rules without setup times consideration. The results indicate that the proposed priority rules with setup times consideration are superior to the standard priority rules without the consideration of setup times. From the second experiment and the third experiment to compare the proposed MPWT heuristic approach with the efficient priority rules with setup times consideration, the MPWT heuristic method is significantly superior to the Batched Apparent Tardiness Cost with Sequence-dependent Setups (BATCS) rule, and other priority rules based on total earliness and progressive weighted tardiness, and total earliness and tardiness.

Quality Management and Competitive Strategy (품질경영과 경쟁전략)

  • 오세진
    • Journal of Korean Society for Quality Management
    • /
    • v.25 no.2
    • /
    • pp.60-82
    • /
    • 1997
  • The purpose of this study is to empirically examine the quality competence as a source of competitive advantages. The relationship between quality priority and competitive priority, and the relationship between quality competence and competitive capability are investigated using data collected from 114 manufacturing business units of 75 manufacturing companies. Several measures are used to characterize competitive strategy and value chain, and quality factors including conformance, reliability, durability, performance, and customization. The result indicates that the quality competence paired with competitive strategy positively influences the level of competitiveness, but management performances are not strongly correlated with quality competence.

  • PDF

Optimal Management Scheme for Phosphorus Discharged from Public Sewage Treatment Plant Located in Upstream Basin of Paldang Lake (팔당호 상류수계에 위치한 공공 하수종말처리시설의 총인 배출 최적관리)

  • Woo, Younggug;Park, Eunyoung;Jeon, Yangkun;Jeong, Myungsuk;Rim, Jaymyung
    • Journal of Korean Society on Water Environment
    • /
    • v.27 no.2
    • /
    • pp.200-209
    • /
    • 2011
  • The purpose of the study is to optimally manage sewage treatment plant with analysis of phosphorus contribution and improvement of water quality contributing rate in the effect of inflowing point of effluent and Pal-Dang lake after reducing T-P discharge from large scale public sewage treatment plant at upstream of Pal-Dang lake. Also, this study, for enforcement of T-P in effluent, plans optimal management of effluent T-P through examining propriety of environmental, technological, and economical aspect such as water quality standard of domestic and foreign T-P and related policy. In regarding optimal management of T-P discharged from public sewage treatment plant located in upstream of Pal-Dang lake, the study drew following conclusions. With the optimal management of public sewage treatment plant, it showed that a pollution level became higher in the order of Sumgang E in South-Han river, C in Dalcheon, B1 B2, A in North-Han river, and J in Kyungancheon, and it is required reduction of T-P first. The highest value in analysis of benefit-costs from sewage treatment plant in the selected research area was Kyungan B, and the others are with the order of Jojong A, Bokha A, Kyungan A, and Yanghwa A. With result of this study, all 14 areas are required more enforced phosphorus treatment. The study resulted that the most top priority areas were Hangang F, Sumgang B, and Gyungan A, top priority areas were Bokha A, Dalcheon B, and Cheongmi A, priority areas were Hangang E, Heukcheon A, Gyungan B, and Jojong A, and potential areas were Sumgang A, Yanghwa A, Dalcheon A, and Hangang D. It seems to be appropriate to apply 0.2 mg/L of T-P treatment for water supply source reservation, 0.5 mg/L for the other areas by locally, and 0.2~0.5 mg/L for biological nitrogen phosphorus treatment method and 0.5~1 mg/L for Conventional Activated Sludge by technologically. Also, it may be appropriate to apply 0.2 mg/L for the most top priority area(I), 0.3 mg/L for the top priority area(II), 0.4 mg/L for priority area(III), and 0.5 mg/L for potential area(IV) by the separation of priority area.

Development of a Methodology for Setting Priority of Technology Alternatives (기술대체안의 우선순위 설정을 위한 개량 AHP모형의 개발)

  • Gwon, Cheol-Shin;Cho, Keun-Tae
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2000.04a
    • /
    • pp.122-125
    • /
    • 2000
  • The Analytic Hierarchy Process (AHP), a decision making model, which is more applicable than other methods to R&D project selection, particularly when it is applied to intangibles. The objective of this paper is to develop an extended model of the AHP which Is linked to Cross Impact Analysis to assist in the ranking of a large number of technological alternatives. In this study, we developed a priority setting algorithm which considers the cross-impact of the future technology alternatives and thus developed an integrated cross-impact hierarchical decision-making model, which sets the priority by considering technological forecasting and technology dependency

  • PDF

MANAGEMENT DECISION-MAKING FOR SUGARCANE FERTILIZER MIX PROBLEMS THROUGH GOAL PROGRAMMING

  • Sharma, Dinesh K.;Ghosh, Debasis;Alade, Julius A.
    • Journal of applied mathematics & informatics
    • /
    • v.13 no.1_2
    • /
    • pp.323-334
    • /
    • 2003
  • This paper presents a goal-programming (GP) model for management decision-making for sugarcane fertilizer mix problems. Sensitivity analysis on the priority structure of the goals has been performed to obtain all possible solutions. The study uses Euclidean distance function to measure distances of all possible solutions from the ideal solution. The optimum solution is determined from the minimum distance between the ideal solution and other possible solutions of the problem. The optimum solution corresponds to the appropriate priority structure of the problem in the decision-making context. furthermore, the results obtained from sensitivity analysis on the cost of combination of fertilizers confirm the priority structure.