• Title/Summary/Keyword: management of estimation

Search Result 2,953, Processing Time 0.033 seconds

Schematic Estimation Process using Architectural Object BIM Library

  • Lee, Ji Yong;Kim, In Han;Choi, Jung Sik
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.289-293
    • /
    • 2015
  • The construction industry has been evolving with the development of information technology. According to this trend, the current industry changes from 2d drawings to Building Information Modeling(BIM). Current studies on the BIM-based estimation have problems such as Quantity Take-Off(QTO) specificity toward a particular software, the uncertainty of the amount in accordance with the model quality. These studies focus on QTO based on BIM rather than schematic estimation. In addition, studies on the connection with the QTO and unit cost for schematic estimation are insufficient. The purpose of this study is to propose schematic estimation process by utilizing construction codes and QTO in architectural object BIM libraries. Construction codes are classified in detail in order to input codes inside each. This study has connected unit cost and construction classification codes that obtain from BIM model. The results of this study will be helpful in decision-making and communication for schematic estimation of the design phase. It will improve the efficiency and reliability problems of existing schematic estimation.

  • PDF

A Study on the Needs Level for a Demand Estimation Model in Knowledge Administration Activities (지식행정 활동의 수요예측 모형을 위한 요구수준 진단)

  • Kim, Gu
    • Knowledge Management Research
    • /
    • v.6 no.2
    • /
    • pp.23-47
    • /
    • 2005
  • This study is performed the multinomial logistic regression with the officials needs level about a component of knowledge administration for drawing a demand estimation model in the knowledge administration activities. This study is not that an activity and domain of knowledge administration is to apply and to operate uniformly it in public sector, one is suggested an application with a demand diagnose of knowledge administration in order to saw a course of the knowledge administration programs to suit a function and role of public administration. A result of this study is that an activity and domain of the knowledge administration is different from a component of it namely, knowledge creating, knowledge organizing, knowledge sharing and distribution, knowledge utility, and knowledge store. And the officials individual characteristics, administration agency, a kind of business, and a function and role of work are different from demand of knowledge administration. Also, the practical use of KMS (knowledge management system) is not so high in public sector. Accordingly, the tools of knowledge administration will deliberate on a consolidation with the existing system in the device.

  • PDF

Development of Obstacle Database Management Module for Obstacle Estimation and Clustering: G-eye Management System (장애물 추정 및 클러스터링을 위한 장애물 데이터베이스 관리 모듈 개발: G-eye 관리 시스템)

  • Min, Seonghee;Oh, Yoosoo
    • Journal of Korea Multimedia Society
    • /
    • v.20 no.2
    • /
    • pp.344-351
    • /
    • 2017
  • In this paper, we propose the obstacle database management module for obstacle estimation and clustering. The proposed G-eye manager system can create customized walking route for blind people using the UI manager and verify the coordinates of the path. Especially, G-eye management system designed a regional information module. The regional information module can improve the loading speed of the obstacle data by classifying the local information by clustering the coordinates of the obstacle. In this paper, we evaluate the reliability of the walking route generated from the obstacle map. We obtain the coordinate value of the path avoiding the virtual obstacle from the proposed system and analyze the error rate of the path avoiding the obstacle according to the size of the obstacle. And we analyze the correlation between obstacle size and route by classifying virtual obstacles into sizes.

Parameter estimation of the Diffusion Model for Demand Side Management Monitoring System (DSM Monitoring을 위한 확산 모델의 계수 추정)

  • Choi, Cheong-Hun;Jeong, Hyun-Su;Kim, Jin-O
    • Proceedings of the KIEE Conference
    • /
    • 1998.07c
    • /
    • pp.1073-1075
    • /
    • 1998
  • This paper presents the method of parameter estimation of diffusion model for monitoring Demand-Side Management Program. Bass diffusion model was applied in this paper, which has different values according to parameters ; coefficients of innovation, imitation and potential adopters. Though it is very important to estimate three parameter, there are no empirical results in practice. Thus, this paper presents the method of parameter estimation in case of few data with constraints to reduce the possibility of bad estimation. The constraints are empirical results or expert's decision. Case studies show the diffusion curves of high-efficient lighting and also forecasting of the peak value for power demand considering diffusion of high-efficient lighting, the feedback and least-square parameter estimation method used in this paper enable us to evaluate the status and forecasting of the effect of DSM program.

  • PDF

Secondary Battery SOC Estimation Technique for an Autonomous System Based on Extended Kalman Filter (자율이동체를 위한 2차 전지의 확장칼만필터에 기초한 SOC 추정 기법)

  • Jeon, Chang-Wan;Lee, Yu-Mi
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.14 no.9
    • /
    • pp.904-908
    • /
    • 2008
  • Every autonomous system like a robot needs a power source known as a battery. And proper management of the battery is very important for proper operation. To know State of Charge(SOC) of a battery is the very core of proper battery management. In this paper, the SOC estimation problem is tackled based on the well known Extended Kalman Filter(EKF). Combined the existing battery model is used and then EKF is employed to estimate the SOC. SOC table is constructed by extensive experiment under various conditions and used as a true SOC. To verify the estimation result, extensive experiment is performed with various loads. The comparison result shows the battery estimation problem can be well solved with the technique proposed in this paper. The result of this paper can be used to develop related autonomous system.

Influences of Energy Production Estimation Errors on Project Feasibility Indicators of a Wind Project and Critical Factor Analysis by AHP (풍력발전사업 에너지생산량 산정 오차가 사업성지표에 미치는 영향 및 AHP를 이용한 중요인자 분석)

  • Kim, Youngkyung;Chang, Byungman
    • Korean Management Science Review
    • /
    • v.30 no.2
    • /
    • pp.1-10
    • /
    • 2013
  • Case studies are made to investigate the relationship between the accuracy of energy production estimation and project feasibility indicators such as rate of return on equity (ROE) and debt service coverage ratio (DSCR) for three wind farm projects. It is found out that 1% improvement in the accuracy of energy production estimation may enhance the ROE by more than 0.5% in the case of P95, thanks to improved financing terms. AHP survey shows that MCP correlation of measured in situ wind data with long term wind speed distribution and hands-on experiences of flow analysis are more important than other factors for more precise annual energy production estimation.

A Study on Estimating Function Point Count of Domestic Software Development Projects (국내 소프트웨어 개발사업에 적합한 기능점수규모 예측방법에 관한 연구)

  • 박찬규;신수정;이현옥
    • Korean Management Science Review
    • /
    • v.20 no.2
    • /
    • pp.179-196
    • /
    • 2003
  • Function point model is the international standard method to measure the software size which is one of the most important factors to determine the software development cost. Function point model can successfully be applied only when the detailed specification of users' requirements is available. In the domestic public sector, however, the budgeting for software projects is carried out before the requirements of softwares ere specified in detail. Therefore, an efficient function point estimation method is required to apply function point model at the early stage of software development projects. The purpose of this paper is to compare various function point estimation methods and analyse their accuracies in domestic software projects. We consider four methods : NESMA model, ISBSG model, the simplified function point model and the backfiring method. The methods are applied to about one hundred of domestic projects, and their estimation errors are compared. The results can used as a criterion to select an adequate estimation model for function point counts.

Parameter Impact Applied Case-based Reasoning Cost Estimation

  • Joseph Ahn;Hyun-Soo Lee;Moonseo Park;Sae-Hyun Ji;Sooyoung Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.475-478
    • /
    • 2013
  • To carry out a one-off construction project successfully, effective and accurate early cost estimation is crucial, especially during the conceptual stage where very limited minimum information of construction project is given. As the level of accuracy of the early cost estimation has huge impacts on precise budgeting and cost management of a project, in other words, reducing the risk of a project, cost must be managed with special awareness. In an effort to improve the estimate accuracy of cost during the conceptual stage, this research introduces a Parameter Impact (PI) which can quantify weights of parameters and rank them; and PI development derived from the principle of impulse in physics is explicated. For a case study, 76 public apartment building cases in Korea are analyzed. To examine the validity of the proposed PI, a validation in terms of CBR applicability test and estimate accuracy comparisons using 10-nearest neighbor cases are carried out. The validation results support that the suggested PI can be applied in quantifying the weights of the parameters and CBR method for early cost estimation.

  • PDF

Web-system development for the feasibility of national road

  • Park, T.;Shin, E.;Kang, T.;Park, W.;Lee, Y.
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.698-699
    • /
    • 2015
  • For last three years, our research team have conducted the project named "Development of construction project management technology based on BIM/GIS platform. "We developed construction cost estimation system as well as 3D modeling engine at the first two year and established a web-system which could estimate the benefits of the project and further analyze the economic and financial feasibility of the project. This paper mainly focused on the functions and specifications of web-system. The system was composed of two modules: economic feasibility estimation module and financial feasibility estimation module. While the economic feasibility estimation module determines economic feasibility of the project based on traffic demand forecasting from the public's perspective, the financial feasibility estimation module determine financial viability of the project using toll fee of the road from private entity's perspective. Compared with traditional feasibility study, the proposed system provide users with better flexibility which can make users easily to validate the project upon the change of project environments. The system was also verified with an already accomplished project. The verification showed that proposed system could provide satisfactory accurate results with reduced time and resources.

  • PDF

An Empirical Approach Study on Construction Cost Estimation in Public Work Projects (공공사업 예정공사비에 대한 실증적 접근)

  • Yoo, Chang-Kyu;Song, Jeong-Gyu;Lee, Yun-Sun;Kim, Jae-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.1
    • /
    • pp.65-73
    • /
    • 2009
  • Looking at current construction costs estimations of publicly declared public works, there are many instances where estimation criteria are ambiguous and doesn't imply the reality. Up to date, estimation criteria for calculating construction cost estimations are simply by unit area multiplication and stochastic construction cost estimation. However, possibility of making errors are high due to using uniform data that excludes each public work's specifications and environmental conditions. Further, on the aspect of cost management, there is certain limitation in the efficiency of cost management in order-placing stage and commencing-work stage; while efficient cost management and reduction of expenses are highly possible during initial stages of the project. In this respect, the paper adopts positive approach with regards to construction cost estimations of public works and draws common elements from calculation tables of the construction cost estimations from 3 completed domestic construction works; after which, the paper analyzes whether business exposition, construction guide and publicly-declared estimated construction costs that the orderer issued are calculated economically and properly; deducing problems in the process, the paper seeks to recommend rational calculation method on this.