1 |
Ferrante, G., "Wind Farm Project Finance : Financing and Technical Requirements- Models and Strategies for Public-Private Partnerships (PPP) : experiences from Italy and Bulgaria," 2007.
|
2 |
Harper, J.P., M.D. Karcher, and M. Bolinger, "Wind Project Financing Structures : A Review and Comparative Analysis," Ernest Orlando Lawrence Berkeley National Laboratory, 2007.
|
3 |
IEC, "61400-12-1 : Wind turbines-Part 12-1 : Power performance measurements of electricity producing wind turbines," 2005.
|
4 |
IEC, "61400-12-1 First edition 2005-12," 2005.
|
5 |
Klug, H., A. Albers, and D. Westermann, "Power Performance Verification," DeutschesWindenergie-Institut.
|
6 |
Klug, H., What does Exceedance Probabilities P90-P75-P50 Mean?, 2006.
|
7 |
Klug, H. and M. Strack, P50-P75-P90 How to reduce the financial Risks of a Wind Farm Project.
|
8 |
Klug, H., Contractual Issues Dealing with Energy Production Warranties, Paper prepresented on the Global Wind Power conference, 2-5 April, 2002, Paris, France.
|
9 |
Lange, M., Analysis of the uncertainty of the wind power prediction, 2003.
|
10 |
Mekan, M.A., Wind Power projects on project finance basis : Risk Allocation, IFC, 2006.
|
11 |
Mellinghoff, H., Wind Farm Power Performance Verification.
|
12 |
Nielsen, M., H.E. Jorgensen, and S.T. Frandsen, EWEC 2009, Wind and wake models for IEC 61400-1 site assessment, 2009.
|
13 |
Pedersen, T.F., S. Gjenging, P. Ingham, J.K. Hansen, and H.K. Jorgensen, Wind Turbine Power Performance Verification in Complex Terrain and Wind Farms, Riso National Laboratory, Roskilde, 2002.
|
14 |
Pentalum, SpiDAR Revolutionary Wind Li DAR, 2010.
|
15 |
Spengemann, P. and V. Borget, Reviewand analysis of wind farm operational data Validation of the predicted energy yield of wind farms based on real energy production data.
|
16 |
Taylor, M., P. Mackiewicz, M.C. Browner, and M. Markus, An Analysis of Wind Resource Uncertainty in Energy Production Estimates, AWS Truewind, LLC, Windpower Conference, Paris, France, 2002.
|
17 |
UNEP, GEF, Financial Risk Management Instruments for Renewable Energy projects, 2008.
|
18 |
UNEP, SEFI, Financial Risk Management Instruments for Renewable Energy Projects, UNEP Summary document, 2004.
|
19 |
권순덕, "Uncertainty analysis of wind energy potential assessment", Applied Energy , 제87권(2010), pp.856-865.
DOI
ScienceOn
|
20 |
권순덕, "단기 관측을 통한 풍력에너지 평가", 한국풍공학회논문집 , 제12권, 제3호(2008), pp. 165-171.
|
21 |
김건훈, 주영철, 김대호, "1.5MW 풍력발전시스템 출력 성능시험 및 불확실성 분석", 태양에너지학회논문집, 제26권, 제4호(2006), pp. 63-71.
|
22 |
김상훈, 최점기, "AHP 기법을 이용한 정보화지원사업 평가영역 및 평가항목별 가중치 분석", 한국경영과학회지, 제32권, 제2호(2007), pp.123-140.
|
23 |
송성환, 권성훈, 박진범, 홍순기 "Delphi를 사용한 AHP 방법론에 관한 연구", 경영과학, 제26권, 제1호(2009), pp.964-971.
|
24 |
장준호, "프로젝트 파이낸싱 기법에 관한 연구", 건국대학교 국제대학원, 2000.
|
25 |
Claude, A., "Quantifying model uncertainty in complex terrain," 2009.
|
26 |
Cox, M. and P. Harris, "Up a GUM Tree? Try full Monte!," National Physical Laboratory, 2003.
|