• Title/Summary/Keyword: maintenance performance

Search Result 2,990, Processing Time 0.037 seconds

The Maintenance Performance Evaluation Dynamic Model for Apartment Buildings (공동주택의 유지관리 성능평가 동적 모델 개발)

  • Kim, Tae-Hui
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.5 s.27
    • /
    • pp.78-88
    • /
    • 2005
  • Given the trend of increased apartment buildings and high-rise buildings, the maintenance of apartment buildings has been set a higher value. For this reason, a total performance evaluation model of the existing buildings has recently been developed. But, it has a lack of the management work analysis. The purpose of this study, therefore, is the management work analysis for items selection of maintenance performance evaluation of apartment buildings. Candidate items of Maintenance performance evaluation was made with the existing literature and business system analysis. Easy systemicity of performance evaluation supplemented doing question to academic experts and housing managers. Finally decided maintenance performance evaluation items are to classify 14 administrative and 15 technical items.

APPLICATION OF MONITORING, DIAGNOSIS, AND PROGNOSIS IN THERMAL PERFORMANCE ANALYSIS FOR NUCLEAR POWER PLANTS

  • Kim, Hyeonmin;Na, Man Gyun;Heo, Gyunyoung
    • Nuclear Engineering and Technology
    • /
    • v.46 no.6
    • /
    • pp.737-752
    • /
    • 2014
  • As condition-based maintenance (CBM) has risen as a new trend, there has been an active movement to apply information technology for effective implementation of CBM in power plants. This motivation is widespread in operations and maintenance, including monitoring, diagnosis, prognosis, and decision-making on asset management. Thermal efficiency analysis in nuclear power plants (NPPs) is a longstanding concern being updated with new methodologies in an advanced IT environment. It is also a prominent way to differentiate competitiveness in terms of operations and maintenance costs. Although thermal performance tests implemented using industrial codes and standards can provide officially trustworthy results, they are essentially resource-consuming and maybe even a hind-sighted technique rather than a foresighted one, considering their periodicity. Therefore, if more accurate performance monitoring can be achieved using advanced data analysis techniques, we can expect more optimized operations and maintenance. This paper proposes a framework and describes associated methodologies for in-situ thermal performance analysis, which differs from conventional performance monitoring. The methodologies are effective for monitoring, diagnosis, and prognosis in pursuit of CBM. Our enabling techniques cover the intelligent removal of random and systematic errors, deviation detection between a best condition and a currently measured condition, degradation diagnosis using a structured knowledge base, and prognosis for decision-making about maintenance tasks. We also discuss how our new methods can be incorporated with existing performance tests. We provide guidance and directions for developers and end-users interested in in-situ thermal performance management, particularly in NPPs with large steam turbines.

A Study on Proper Maintenance Level Selection of Track Ballast Structures Using LCC Analysis (LCC분석을 통한 궤도도상구조의 적정 유지관리수준 선정에 관한 연구)

  • An, Kook;Lee, Ho-Yeol;Chu, Jang-Sik;Park, Mi-Yun;Lim, Jong-Kwon
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.232-237
    • /
    • 2008
  • Several research institutes including KISTEC and KRRI etc., recently, have studied maintenance activities and performance, in order to determine proper maintenance level and maintenance cost of rail tracks. But it may extremely difficult to make a decision in maintenance matters of concrete track and ballast containing other sub-components. For these reasons, this study investigate variables related to current maintenance, essential maintenance, and preventive maintenance. It is intended to suggest estimation method of proper maintenance cost maximizing rail track performance. It is stated that proposed approach may be very useful to make a decision of proper maintenance level. Typical section of rail track is applied for calculation of life cycle cost according to each maintenance strategy. A proper profile for maintenance is determined minimum life cycle

  • PDF

Indicator of Facility Performance Evaluation (FPE) for Educational Facilities of BTL Projects

  • Lee, Kwan-Jong;Lee, Chun-Kyong;Park, Tae-Keun
    • Architectural research
    • /
    • v.14 no.1
    • /
    • pp.35-44
    • /
    • 2012
  • Build-Transfer-Lease (BTL) was introduced to the domestic construction market in 2005. Now, seven years later, the BTL model is most active for educational facilities. In 2011, 93 educational facility projects entered the maintenance stage. Considering the characteristics of today's BTL projects for educational facilities, the main issues are the initial performance and maintenance of educational facilities and the service-providing status for the 20-year operational management period, in relation to providing safety and convenience to students, the facility users. Seeking a solution, local education offices and departments in charge of BTL under the Ministry of Education, Science, and Technology have been exploring various methods of evaluating operational maintenance performance from various perspectives. For educational facility BTL projects, however, the appropriateness of initial operation performance evaluation, rather than considering the 20-year operational management period, is controversial in regards to sustainability. On this account, performance evaluation items in four areas-operational maintenance evaluation, facility performance status evaluation, maintenance subject evaluation, and sustainable change response evaluation-should be extracted. An indicator of facility performance evaluation is presented in this study through an AHP survey targeting experts, as part of establishing an operation performance evaluation system for educational facility BTL projects.

An Analysis on the Effect of PBL(Performance Based Logistics) Application for ROK Navy Landing Ship Fast(LSF-II) (해군 고속상륙정(LSF-II)에 대한 성과기반군수지원(PBL) 적용 효과 분석)

  • Chanjung Kim;Myoungjin Choi
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.46 no.4
    • /
    • pp.331-338
    • /
    • 2023
  • ROK Navy Landing Ship Fast(LSF-II) is equipped with special equipment that is not compatible with other combat ships due to special missions. So there are almost no maintenance capabilities except for simple repair parts replacement and maintenance parts. The researcher determined that the way to solve these problems was to apply Performance Based Logistics (PBL), and reviewed the cases of PBL applications abroad and domestically. To confirm the current maintenance capability, we visited LSF-II operation unit to identify maintenance capabilities for each mounted equipment, and interviews with operators and maintenance practitioners confirmed the limitations of outsourcing maintenance and the need to apply PBL. In order to analyze the effect of PBL application, the measure of effectiveness and measure of performance were selected based on the opinions of LSF-II operation/maintenance practitioners and PBL experts and the practical experience of this researcher. A survey was conducted on operation/maintenance practitioners and professional personnel. Based on the survey results, the effect of applying PBL was analyzed using the AHP technique, and an efficient PBL application plan was proposed for LSF-II.

A Study on the Information System Maintenance Activities and Performance

  • Lee, Young-Joo;Choi, Young-Jin
    • Journal of the Korea Society of Computer and Information
    • /
    • v.20 no.12
    • /
    • pp.175-180
    • /
    • 2015
  • It is important to maintain information system (IS) following the business and institutional change. Even if successfully developed information systems, we cannot gain the benefit from the systems without the proactive maintenance activities. However, the importance of IS maintenance has not been considered as much as the system development, and we don't have any specific performance management structure. The objective of this study is to identify the relationship between IS maintenance activities and utilization. For empirical test of the hypothesis model, the sample data is collected from public information system sites. Results from multiple regression analysis reveal that proactive maintenance activities including IS maintenance cost increase, improving functionality, and enhancing ease of use have a causal effect on the IS utilization.

Development of Bridge Management System for Next Generation based on Life-Cycle Cost and Performance (생애주기 비용 및 성능을 고려한 차세대 교량 유지관리기법 개발)

  • Park, Kyung-Hoon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.167-174
    • /
    • 2007
  • This study proposes a practical and realistic method to establish an optimal lifetime maintenance strategy for deteriorating bridges by considering the life-cycle performance as well as the life-cycle cost. The proposed method offers a set of optimal tradeoff maintenance scenarios among other conflicting objectives, such as minimizing cost and maximizing performance. A genetic algorithm is used to generate a set of maintenance scenarios that is a multi-objective combinatorial optimization problem related to the and the life-cycle cost and performance as separate objective functions. A computer program, which generates optimal maintenance scenarios, was developed based on the proposed method. The subordinate relation between bridge members has been considered to decide optimal maintenance sequence. The developed program has been used to present a procedure for finding an optimal maintenance scenario for steel-girder bridges on the Korean National Road. Through this bridge maintenance scenario analysis, it is expected that the developed method and program can be effectively used to allow bridge managers an optimal maintenance strategy satisfying various constraints and requirements.

  • PDF

Development of Bridge Maintenance Method based on Life-Cycle Performance and Cost (생애주기 성능 및 비용에 기초한 교량 유지관리기법 개발)

  • Park, Kyung Hoon;Kong, Jung Sik;Hwang, Yoon Koog;Cho, Hyo Nam
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.6A
    • /
    • pp.1023-1032
    • /
    • 2006
  • In this paper, a new method for the bridge maintenance is proposed to overcome the limit of the existing methods and to implement the preventive bridge maintenance system. The proposed method can establish the lifetime optimum maintenance strategy of the deteriorating bridges considering the life-cycle performance as well as the life-cycle cost. The lifetime performance of the deteriorating bridges is evaluated by the safety index based on the structural reliability and the condition index detailing the condition state. The life-cycle cost is estimated by considering not only the direct maintenance cost but also the user and failure cost. The genetic algorithm is applied to generate a set of maintenance scenarios which is the multi-objective combinatorial optimization problem related to the life-cycle cost and performance. The study examined the proposed method by establishing a maintenance strategy for the existing bridge and its advantages. The result shows that the proposed method can be effectively applied to deciding the bridge maintenance strategy.

Case Studies of a Performance-Based Contract for National Highway Pavement Maintenance (성능보증제도를 적용한 일반국도 유지보수공사 시범사업)

  • Lim, Jaekyu;Kim, Yongjoo;Kim, Myeongil;Lee, Jaejun
    • International Journal of Highway Engineering
    • /
    • v.20 no.1
    • /
    • pp.1-8
    • /
    • 2018
  • PURPOSES : Case studies of an asphalt-overlay project with a performance-based contract method were conducted on a national highway in Korea to evaluate the effect of the method on asphalt pavement maintenance. This study evaluated the procedure of the performance-based contract method. METHODS : In this study, an asphalt-pavement maintenance project for a national highway was assessed with a performance-based contract to investigate the advantage of the new contract procedures. This is the first trial applying the performance-based contract to a pavement-rehabilitation project in Korea. In the four case studies, the warranty period of the performance-based contract was designed for seven years. The research team monitored the construction site to compare the normal contract method with the performance-based contract method. The case studies' project sites were investigated after the end of the construction. RESULTS : Based on the limited case studies, the performance-based contract method could extend the service life of the asphalt pavement and reduce the pavement-maintenance budget because the quality control was well managed by the contractors. However, a few construction laws would be necessary to apply the performance-based contract method in the future. CONCLUSIONS : Using the performance-based contract, the construction company made great efforts to guarantee the warranty period and to apply the optimal maintenance method, based on the pavement distress condition. The contractor and the agency would need to understand the new performance-based contract system for it to be activated. Therefore, a proper education program for the performance-based contract system would be needed to educate the stakeholders regarding the procedures and their effects on the pavement management and maintenance.

Development of the Performance-Based Bridge Maintenance System to Generate Optimum Maintenance Strategy Considering Life-Cycle Cost (생애주기비용을 고려한 성능기반 교량 최적 유지관리 전략 수립 시스템 개발)

  • Park, Kyung-Hoon;Lee, Sang-Yoon;Hwang, Yoon-Koog;Kong, Jung-Sik;Lim, Jong-Kwon
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.11 no.4
    • /
    • pp.109-120
    • /
    • 2007
  • In this study, a bridge maintenance system is developed to generate performance-based optimum maintenance strategy by considering the life-cycle cost. A multi-objective combinatorial optimization problem is formulated to generate a tradeoff maintenance scenarios which satisfies the balance among the conflicting objectives such as the performance and cost during the bridge lifetime and a genetic algorithm is applied to the system. By using the developed program, this study proposes a process of optimum maintenance scenario applying to the steel girder bridge of national road. The developed system improves the current methods of establishing the bridge maintenance strategy and can be utilized as an efficient tool to provide the optimum bridge maintenance scenario corresponding to the various constraints and requirements of bridge agency.