• Title/Summary/Keyword: maintenance and repair cost

Search Result 325, Processing Time 0.028 seconds

A Study on Development of Performance Measures for Level of Service(LOS) of Bridge Asset Management (교량 자산관리의 서비스수준 결정을 위한 성능척도 개발에 관한 기초연구)

  • Sun, Jong-Wan;Park, Kyung-Hoon;Lee, Min-Jae;Park, Cheol-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.2
    • /
    • pp.101-110
    • /
    • 2011
  • Because bridges can cause more significant damage than other infrastructure a certain level of safety shall necessarily be secured for users. As most of bridges' service life become 20-30 years there will be a dramatic increase in the maintenance and repair cost but the budget and human resource will be limited. Asset management technique can help the efficiency in maintenance and budget management with the limited resource. For its application, there must be a way to evaluate how bridges provide service to users. The level of service can be quantified by a performance measure. This study introduces performance measures and an evaluation process for the determination of level of service. The evaluation results will be used as a fundamental information in the determination of maintenance/repair/management targets and in the decision making process of the bridge asset management.

Evaluation of Performance and Maintenance Cost for Roadside's Particulate Matter Reduction Devices Using Smart Green Infrastructure Technology (스마트 그린인프라 기술을 활용한 도로변 미세먼지 저감장치의 성능 및 유지·관리 비용 평가)

  • Song, Kyu-Sung;Seok, Young-Sun;Yim, Hyo-Sook;Chon, Jin-Hyung
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.25 no.4
    • /
    • pp.15-31
    • /
    • 2022
  • The Green Purification Unit System (GPUS) is a green infrastructure facility applicable to the roadside to reduce particulate matter from road traffic. This study introduces two types of GPUS (type1 and type2) and assesses the performance and maintenance costs of each of them. The GPUS's performance analysis used the data collected in November 2021 after the installation of the GPUS type1 and type2 at the study site in Suwon. The changes in the particulate matter concentration near the GPUS were measured. The maintenance cost of GPUS type1 and type2 was assessed by calculating the initial installation cost and the management and repair cost after installation. The results of the performance analysis showed that the GPUS type1, which was manufactured by combining plants and electric dust collectors, had a superior particulate matter reduction performance. In particular, type1 produced a greater effect of particulate matter reduction in the time with a high concentration (50㎍/m3 or higher) of particulate matter due to the operation of electric dust collectors. GPUS type2, which was designed in the form of a plant wall without applying an electric dust collector, showed lower reduction performance than type1 but showed sufficiently improved performance compared to the existing band green area. Meanwhile, the GPUS type1 had three times higher costs for the initial installation than GPUS type2. In terms of costs for managing and repairing, it was evaluated that type1 would be slightly more costly than type2. Finally, this study discussed the applicability of two types of GPUS based on the result of the analysis of their particulate matter performance and maintenance cost at the same time. Since GPUS type2 has a cheaper cost than type1, it could be more economical. However, in the area suffering a high concentration of particulate matter, GPUS type1 would be more effective than type2. Therefore, the choice of GPUS types should rely on the status of particulate matter concentration in the area where GPUS is being installed.

Examination of Value Engineering for Bridge Superstructures using Analytic Hierarchy Process (AHP 기법을 이용한 교량상부구조의 VE 검토)

  • Park, Jang-Ho;Shin, Yung-Seok;Ahn, Ye-Jun;Lee, Kwang-Kyun
    • Journal of the Korean Society of Safety
    • /
    • v.24 no.6
    • /
    • pp.79-85
    • /
    • 2009
  • This study presents an algorithm to select the best alternative plane among various bridge superstructure types(Steel box girder, Rational girder, PSC-I girder) using Value Engineering(VE). Economical efficiency, landscape, constructability, maintenance, stability, function of bridge superstructure were taken into consideration in the designing of bridge. Economical efficiency was evaluated for each alternative plan with optimal design considering Life Cycle Cost(LCC). Repair and rehabilitation histories and some factors were set to get reasonable results. In the application of Analytic Hierarchy Process(AHP), consistency of Pairwise Comparisons Matrix was evaluated and the best plan was determined.

Optimal Maintenance Policy Using Non-Informative Prior Distribution and Marcov Chain Monte Carlo Method (사전확률분포와 Marcov Chain Monte Carlo법을 이용한 최적보전정책 연구)

  • Ha, Jung Lang;Park, Minjae
    • Journal of Applied Reliability
    • /
    • v.17 no.3
    • /
    • pp.188-196
    • /
    • 2017
  • Purpose: The purpose of this research is to determine optimal replacement age using non-informative prior information and Bayesian method. Methods: We propose a novel approach using Bayesian method to determine the optimal replacement age in block replacement policy by defining the prior probability with data on failure time and repair time. The Marcov Chain Monte Carlo simulation is used to investigate the asymptotic distribution of posterior parameters. Results: An optimal replacement age of block replacement policy is determined which minimizes cost and nonoperating time when no information on prior distribution of parameters is given. Conclusion: We find the posterior distribution of parameters when lack of information on prior distribution, so that the optimal replacement age which minimizes the total cost and maximizes the total values is determined.

Problems and Solutions of LCC Analysis in BTL Project for Education Facilities (교육시설 BTL 사업에서 LCC 분석의 문제점도출 및 해결방안)

  • Kim, Chung-Yung;Hong, Tae-Hoon;Hyun, Chang-Taek;Lee, Hyun-Jong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.4
    • /
    • pp.182-192
    • /
    • 2008
  • The purpose of this research is to identify problems and solutions of domestic Life Cycle Cost analysis in BTL(Build-Transfer-Lease), a PFI(Private Finance Initiatives) project. It is expected BTL would be quite effective delivery method for public construction introducing the private's major capital investments and technologies, and obviously LCC analysis is becoming more important factor for success of BTL projects. Nevertheless, there are still some complicated issues in LCC analysis, a technique for selecting the optimal VE(Value Engineering) proposals and estimating OM&R (Operation, Maintenance, & Repair) cost of the buildings, and has been applied limitedly. This research mainly focuses on educational facility, as most frequently delivered by BTL currently, especially with two levels (Alternative LCC and Building LCC) , which is occupied main potion in BTL project. In addition, it identifies four main problems and suggests their solutions through case studies focusing six major factors (WBS, Repair Information, Life Cycle, Time value of money, Repair Information Database, LCC Model) from three projects. Advanced development of this research requires closer partnership between the private / public sectors, and their long term strategies.

AHP 기법을 이용한 교량상부구조의 VE 검토

  • Park, Jang-Ho;Sin, Yeong-Seok;An, Ye-Jun;Lee, Gwang-Gyun
    • Journal of the Korea Construction Safety Engineering Association
    • /
    • s.52
    • /
    • pp.58-66
    • /
    • 2011
  • This study presents an algorithm to select the best alternative plane among various bridge superstructure types (Steel box girder, Rational girder, PSC-I girder) using Value Engineering (VE). Economical efficiency, landscape, constructability, maintenance, stability, function of bridge superstructure were taken into consideration in the designing of bridge. Economical efficiency was evaluated for each alternative plan with optimal design considering Life Cycle Cost (LCC), Repair and rehabilitation histories and some factors were set to get reasonable results. In the application of Analytic Hierarchy Process (AHP), consistency of Pairwise Comparisons Matrix was evaluated and the best plan was determined.

  • PDF

A Study on Structural Maintenance of 'Old Wall' Designated as National Registered Cultural Heritage (국가등록문화재로 지정된 옛 담장의 정비 양상)

  • So, Hyun-Su;Jeong, Myeong-Seok
    • Journal of the Korean Institute of Traditional Landscape Architecture
    • /
    • v.41 no.1
    • /
    • pp.21-34
    • /
    • 2023
  • This study identified the materials and construction methods of 'Old Wall' in 13 villages which were designated as National Registered Cultural Heritage at the time of designation and examined the their structural changes based on field survey. The results are as follows: First, the 'Old Wall' consisted of 10 Soil-Stone Wall and 5 Stone Wall. At the time of designation, Stone Wall, which was built irregularly by dry-construction of natural stones, is similar in shape, but Soil-Stone Wall showed difference by the construction method of making used stones, joints, and faces. Second, the study extracted the changes of 'Old Wall' by repair and examined the changes of construction methods as well as the substitution and addition of materials of structure. The wall-roof was built with cement roof-tile and asbestos slate which have the advantage improve durability and cost-effectiveness. In addition, tile-mouth soil was added to korean traditional roof-tile to prevent rainwater from flowing in. Besides, to improve constructional convenience, the natural stone of the wall-body was replaced with blast stone, float stone and cut stone. Cement block, cement brick and cement mortar were frequently used to repair as well. As Soil-Stone Wall was transformed from irregular pattern-construction to comb pattern-construction and wet-construction was changed to dry-construction, it caused landscape and structural problems. Also, the layer of cement mortar applied to wall-foundation blocked the flow of rainwater that was induced by dry-construction of natural stones. Third, the study regarded that the problem with the repair of 'Old Wall' may occur as it is located in living space, because the owner of the wall could repair for the minor damages without technical knowledge. In addition, it is difficult for repair companies in charge of maintenance of Cultural Heritage to supply local materials, and it is differential construction specifications are not applied.

A Condition Rating Method of Bridges using an Artificial Neural Network Model (인공신경망모델을 이용한 교량의 상태평가)

  • Oh, Soon-Taek;Lee, Dong-Jun;Lee, Jae-Ho
    • Journal of the Korean Society for Railway
    • /
    • v.13 no.1
    • /
    • pp.71-77
    • /
    • 2010
  • It is increasing annually that the cost for bridge Maintenance Repair & Rehabilitation (MR&R) in developed countries. Based on Intelligent Technology, Bridge Management System (BMS) is developed for optimization of Life Cycle Cost (LCC) and reliability to predict long-term bridge deteriorations. However, such data are very limited amongst all the known bridge agencies, making it difficult to reliably predict future structural performances. To alleviate this problem, an Artificial Neural Network (ANN) based Backward Prediction Model (BPM) for generating missing historical condition ratings has been developed. Its reliability has been verified using existing condition ratings from the Maryland Department of Transportation, USA. The function of the BPM is to establish the correlations between the known condition ratings and such non-bridge factors as climate and traffic volumes, which can then be used to obtain the bridge condition ratings of the missing years. Since the non-bridge factors used in the BPM can influence the variation of the bridge condition ratings, well-selected non-bridge factors are critical for the BPM to function effectively based on the minimized discrepancy rate between the BPM prediction result and existing data (deck; 6.68%, superstructure; 6.61%, substructure; 7.52%). This research is on the generation of usable historical data using Artificial Intelligence techniques to reliably predict future bridge deterioration. The outcomes (Long-term Bridge deterioration Prediction) will help bridge authorities to effectively plan maintenance strategies for obtaining the maximum benefit with limited funds.

Analysis of Success Factors for Converting Passenger Aircrafts to Freighters Using AHP (AHP 기법을 활용한 여객기의 화물기로의 개조사업 성공요인 분석)

  • Gwang Cho, Cho;Hyun Cheol Lee
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.46 no.3
    • /
    • pp.148-160
    • /
    • 2023
  • The air transport industry is experiencing unprecedented fluctuations in aviation demand through the Covid-19 pandemic, and is more focused than ever on maintaining and generating business profitability. During the pandemic, demand for air cargo has soared, and the conversion business from passenger aircrafts to freighters(P2F) is drawing attention as a new business in the aviation maintenance industry. This study derives important factors to be considered in order to successfully carry out the P2F project through a wide range of cases and related literature, and analyzes the relative importance of each factor using the analytic hierarchy process. Through a survey of 33 aviation maintenance experts with more than 20 years of field experience, the importance of main factors and their sub factors was determined and implications were drawn. As a primary result, in order to succeed in the P2F project, the main factors were identified in the order of skill, finance, and location. The most important sub factors for each main factors were identified in order of securing airframe modification skill, securing infrastructure construction cost, and creating P2F business complex and district. The quantified success factors suggested the critical direction for the successful development of Korea's P2F business, and presented viable and specific business strategies and implementation plans for each factors.

A Research of Applying RAM-c to Analyze the Design Service Life for Unmanned Aerial Vehicle (무인항공기의 설계사용 수명판단을 위한 RAM-c 적용 연구)

  • Choi, Cheong Ho;Bang, Jang Kyu;Park, Sung Sik
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.23 no.4
    • /
    • pp.117-124
    • /
    • 2015
  • RAM (Reliability, Availability and Maintenance) has been applied to design and analysis tools which affects system's operational sustainability and its life cycle cost as RAM-c(2009 DoD). RAM-c plays also an important role to guarantee the system engineering for mission assurance. Reliability is highly related to the probability of system failure. Availability means mission capability or the condition of ready to mission. Maintenance includes both the repair to recover the system in the event of failure/unexpected breakdown and proactive maintenance to prolong the design service life of the system or machinery. It is the purpose that this paper is to analyze and conclude the objective service life of UAV. The more UAV is operated, the less the level of its reliability becomes. Repairing failures and supplying spare parts on time, system reliability could be improved up until the time over target. Applying statistical Weibull distributions, this paper suggests the analysis of the design service life and economic life of UAV based on RAM-c with operational data.