• Title/Summary/Keyword: maintenance Standard

Search Result 1,077, Processing Time 0.031 seconds

A Study of the Maintenance cost model for the Life Cycle Cost Calculation of the Railroad Vehicle (철도차량 수명유지비용 계산을 위한 유지보수 비용모델 연구)

  • Kim, Jae-Hoon;Jun, Hyun-Kyu;Park, Jun-Seo
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.567-573
    • /
    • 2008
  • Life cycle costing is one of the most effective approaches for the cost analysis of long-term life products, like as railroad vehicle. Life cycle costing includes the cost of concept design, development, manufacture, operating, maintenance and disposal. Especially, life cycle costing in the railroad industry has been focused on the maintenance cost. In this paper, we investigated the standard, guide and maintenance information of railroad vehicle. For this purpose, we suggested the cost model of railroad vehicle maintenance information. We also performed maintenance cost analysis on the some sub-system of railroad vehicle for the case study.

  • PDF

Case Study on the Construction Standard Production Rate for Operation and Maintenance Technology (건설공사 유지보수품셈 사례조사 연구)

  • An, Bang-Yul;Park, Tae-Il
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.250-251
    • /
    • 2019
  • Lots of infrastructures have been newly constructed through the rapid economic growth of 1970's. Since the infrastructures has mostly deteriorated and this circumstance makes the need for maintenance and rehabilitation(M&R) of infrastructures to obtain the convenience and safety of users even more essential. Although markets for M&R project become larger, the construction standards for cost estimation of M&R work are insufficient. Thus, the purpose of this study is to examine the present state of standards for cost estimation of M&R works using case studies. Finally, this work could be utilized as the basis for the development of national standard for estimation of M&R work.

  • PDF

The Study on the Analysis of Elemental Maintenance Costs for Educational Facilities

  • Hyun-Wook Kang;Seung-Wook Lee;Sung- Ryul Bae;Byoung-Jun Min;Moon-Sun Park;Yong-Su Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1254-1259
    • /
    • 2009
  • The purpose of this study is to analyze elemental maintenance costs for educational buildings. The adapted research method selected three school buildings in Seoul as BTL projects. On the basis of the selected case, the study suggested a model to establish a system for each parts and to estimate analyzed maintenance costs through that system. According to the analysis, the study proposed a partial maintenance costs standard and analyzed proper maintenance costs. The results of this study are as follows 1) The system is divided into 8 large-groups and 24 small-groups for the analysis elemental maintenance costs. 2) The average rations followed by analysis of partial maintenance costs of the three school buildings are as followings, the total maintenance costs are analyzed 3,992 million won and each part of average rations is exterior of building 10.9%, interior of building 41.58%, electricity & fire fighting facility 14.22%, water supply & healthy facility 11.39%, heating & water supply facility 12.93%, landscape 6.3%, civil engineering works 2.69%.

  • PDF

A Study of Track Irregularity Standard for Rational Track Maintenance (일반철도 유지보수 합리화를 위한 궤도틀림 기준 연구방향)

  • Kim, Soo-Jeong;Lee, Byeong-Hyeok;Lee, Du-Jas;Eom, Jong-Woo
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1624-1630
    • /
    • 2011
  • Currently the train operating environment to affect track irregularity is changed rapidly such as speed-up, linear improvement and rolling stack upgrade. The recent track maintenance criteria of track irregularity was quoted from past Japan's, and the needs of revision of criteria are increased because of the rapid change in train operating environment. In case of enhance the track irregularity criteria, it secure driving safety and riding comfort but maintenance cost are increase. And also decrease ballast durability by frequent corrective work. In case of mitigate the criteria, it decrease driving safety and riding comfort, but save the maintenance cost. The study for enacting rational criteria did not carry out so far. In this study, survey the domestic and international track irregularity and case study for track irregularity inspection results and maintenance history for guideline of enacting irregularity criteria study.

  • PDF

A Study of BOM Structure for EMU Maintenance Information System (전동차 유지보수 정보화시스템을 위한 BOM체계 구축에 대한 연구)

  • An, Tae-Gi;Lee, Ho-Yong;Park, Gi-Jun;Kim, Gil-Dong
    • Proceedings of the KIEE Conference
    • /
    • 2003.11c
    • /
    • pp.408-410
    • /
    • 2003
  • There are many types of BOM in the industrial world. Types of BOM include EBOM, MBOM, As-Built BOM, As-Designed BOM, Generic BOM, Customized BOM, etc. We should define an adequate BOM for a given need or application. In this paper, we proposed BOM structure for EMU Maintenance Information System. The proposed BOM structure is composed of Location BOM, Equipment BOM, and Maintenance BOM. Location BOM is functional structure for someone to achieve specific works. Equipment BOM is a bill of an independent object to be repaired, and maintained. Maintenance BOM includes all parts to compose Equipment BOM. The BOM structure will be applied to configure sales orders, explode aggregate forecasts, and calculate standard cost.

  • PDF

A study on the Improvement of Facility Layout in Locomotive Maintenance Workshop (철도차량 정비공장의 설비배치 개선에 관한 연구)

  • 이상설;안도만;강희정
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.22 no.49
    • /
    • pp.89-98
    • /
    • 1999
  • The objective of this study is to develop an improved algorithm for layout problems. Computerized facility layout program was also applied to solve the layout problem in locomotive maintenance workshop. The current facility layout is structured in the large space without considerations of many variable factors. For this reason, effectiveness of layout results in loss on effective space utility. This study is to develop an algorithm in the consideration of importance weight and desirable shape of specific department in the computerized layout planning and quantitative relationship rating between each department was used. Standard process duration of locomotive maintenance workshop was used to select the main activities of locomotive maintenance work. This study could generate more efficient facility layout design to reduce the number of movement frequency and travel distance in maintenance workshop.

  • PDF

A Study on RCM Application Focused on the Urban Railway (도시철도 중심의 RCM 적용에 관한 연구)

  • Shin, Kook-Ho;Oh, Ahn-Sup;Shin, Kun-Young;Hwang, Hong-Hwan;Seo, Seog-Chul
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.38-46
    • /
    • 2011
  • Recently railway operators are doing a lot of researches and studies in order to apply reliability technologies to their maintenance tasks. The maintenance in the aviation and the munitions industry has been developed enough to be benchmarked with the high quality reliability technologies; however, railway industry is still situated in a rudimentary stage with insufficient & limited data. 5678 Seoul Metropolitan Rapid Transit Corporation, which has 17 year experience of the EMU maintenance and system development, has made a constant effort for appling RCM (Reliability Centered Maintenance) to the maintenance for a few years. In this connection, the case study is to be introduced. This paper is based on 'RCM Gateway to World Class Maintenance' by Anthony M. Smith". The reliability technology are applied to the specific EMU and its system by 7 stages; accordingly, applying SMRT's maintenance experience, a unique standard for FMEA(failure mode effect analysis) & LTA(logical tree analysis) is established. Moreover, for reasonable and effective preventive maintenance tasks, the case considering an analysis of failure effects is selected in the final step 7. SMRT will develop reliability technologies through the application of the results to all the EMU systems.

  • PDF

Evaluation of Train Overhaul Maintenance Capacity for Rolling Stock Depot Using Computer Simulation Method (시뮬레이션 기법을 활용한 열차 차량기지의 중정비 검수 용량 평가)

  • Jang, Seong-Young;Jeon, Byoung-Hack;Lee, Won-Young;Yoo, Jae-Kyun
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.2 s.39
    • /
    • pp.231-242
    • /
    • 2007
  • As railroad industry faces the new Renaissance era, effective and efficient maintenance methods for rolling stock operation are required with advanced railroad technology. All kinds of railroad systems such as high-speed long-distance train, metropolitan mass transit and light rail require systematic maintenance technology in order to maintain the safe railroad operation. Simulation models for regular operations of the example maintenance center are developed. In this study, standard maintenance procedures, layout, equipments, and number of workers of Siheung Metropolitan Railroad Maintenance Rolling Stock Depot are considered. The proposed simulation models are developed using simulation package ARENA. After simulation, four types of observations are analyzed. First, the bottleneck operation is identified. Second, the relationship between maintenance center size, number of workers and cycle time is analyzed. Third, the scheduling performances between PERT/CPM and Critical Chain Project Management(CCPM) are compared. Lastly, the simulation results according to worker's working coverage shows expanding the worker's coverage decreases the cycle time and increases throughput per train. However, workers are to be fully trained to do multiple skill work.