• Title/Summary/Keyword: line load

Search Result 1,857, Processing Time 0.028 seconds

The Standard for Installation of Automated Distribution Switch-gear in Multi-Line Faults (다중선로 고장을 고려한 배전자동화용 개폐기 설치기준)

  • Lee, Jung-Ho;Ha, Bok-Nam;Cho, Nam-Hun;Lim, Sung-Il
    • Proceedings of the KIEE Conference
    • /
    • 1999.07c
    • /
    • pp.1079-1081
    • /
    • 1999
  • This paper presents the standard for dividing/tieing the distribution lines and installing optimally the automated distribution switch-gear in multi-line faults. Also this paper recommends the distribution system design in consideration of the live load transfer of the concentrated load in the last load-side. This recommendation will be useful for designing the distribution network, developing the feeder automation software and operating the distribution automation system.

  • PDF

A Study on the Axis Line of Short Span Filled Spandrel Arch Bridge (단경간 폐복식 아치교의 축선에 관한 연구)

  • 구민세;황윤국;조현준
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1990.10a
    • /
    • pp.95-100
    • /
    • 1990
  • The behavior of short span filled spandrel arch bridge of 10 and 21 m span with various axis line, rise and backill height were investigated under the design loads(self weight, earth pressure, temperature load, live load, etc). Even though the behaviors of arch were known as relatively complicated, the followings can be concluded within the limits of this study. The design value of arch bridge increase as the rise decreases, the effects of temperature load become dominant for the design of arch bridge, and governing design factors are occured at springing.

  • PDF

A STUDY ON THE SELF-MATCHED LINE PULSE GENERATOR (자기정합 선로형 펄스 발생기에 관한 연구)

  • Paek, Yong-Hyun;Sohn, Jae-Hoon
    • Proceedings of the KIEE Conference
    • /
    • 1990.11a
    • /
    • pp.184-187
    • /
    • 1990
  • This paper presents the self-matched line pulse generator and the concerned principles on its operation and characteristics are mentioned. The circuit consists of a charged transmission line and a high speed switch, and it generates a square wave pulse with the very fast rise time. The generated waveform depends on the load resistance. As the load resistance is infinite, a single rectangular wave pulse is generated and its efficiency is nearly unity.

  • PDF

An Experimental Study on Static Characteristics of Servo Valves using Transmission Line Pressures (배관 압력을 이용한 서보밸브 정적 특성에 관한 실험적 연구)

  • Kim, Sung Dong;Joo, Byeol Jin;Yun, So Nam
    • Journal of Drive and Control
    • /
    • v.13 no.2
    • /
    • pp.42-50
    • /
    • 2016
  • The conventional technique to measure the hysteresis and the null of servo valves is defined in ISO 10770-1 and based on load flow signal of the servo valve. A new technique based on the transmission line pressures is suggested in this study. The new measuring method was verified through a series of experiments. No hysteresis was observed between the spool displacement and the transmission line pressures, load pressure or each chamber pressure. Some hysteresis was observed between valve input and pressures, which was found to be the same as those of load flow and spool displacement for the valve input. By using the chamber pressures, the hysteresis and the null are easier to measure than the load pressure or differential pressure between those two chamber pressures because the chamber pressures showed sharp edges.

Corrosion Loss of the Shell and the Bulkhead Plates of the Oil Tankers According to Their Age (유조선의 선각외판 및 격벽 부식도의 선령별 변화)

  • Park, Jung-Hee;Park, Si-Jung
    • Journal of the Korean Society of Fisheries and Ocean Technology
    • /
    • v.18 no.1
    • /
    • pp.17-23
    • /
    • 1982
  • The corrosion loss of the shell plates and the bulkead plates of the oil tankers, nationalities of which belong to korea are determined and analyzed. The thickness of the plates are determined by use of the ultrasonic thickness meters at the check points set along the fore and aft line and the perpendicular to it. Difference between the original thickness and the determined one are given as the corrosion loss at the present age. 1. On the shell plates (1) The total mean of the corrosion loss shows the greatest value on the load water line in every age classes of the vessels. (2) The total mean of the corrosion loss on the fore and aft line shows little difference, even though it is slightly greater at the fore part, in every age classes of the vessels. (3) The corrosion loss along the perpendicular grows greater in the order of upper bilge line, light water line, freeboard line and load water line at 16 ages of the vessels, and the loss changes in the order of light water line, upper bilge line, freeboard line and load water line at 20 ages of the vessels. (4) The total mean of the corrosion loss along the light water line and upper and lower water line shows the greatest value on the fore part. That along the freeboard line and the load water line shows the greatest value on the midship part and on the after part, respectively. 2. On the bulkhead plates (1) The total mean of the corrosion loss shows the greatest value on the top part at the every age classes of the vessels. (2)The corrosion loss along the perpendicular grows greater in the order of the lower, center and upper part at every age classes of the vessels. (3) The total mean of the corrosion loss at the top part grows greater in the order of the transverse bulkhead of the side oil tank, that of center oil tank, longitudinal bulkhead of center oil tank, and transverse bulkhead of side water tank at the 20 ages of the vessels.

  • PDF

Load Factor Decrease In The Seoul Metro Circle Line through Analyzing Passenger OD Demand (2호선 혼잡구간 OD수요 분리유도를 통한 혼잡도 개선 방안 (교통카드 빅데이터 분석을 중심으로))

  • Eom, Jin Ki;Song, Ji-Young;Lee, Kwang-Sub
    • Journal of the Korean Society for Railway
    • /
    • v.17 no.6
    • /
    • pp.457-465
    • /
    • 2014
  • This study proposes a policy for urban railway travel demand management system in order to decrease the load factor of the Seoul metro Circle line, particularly for the segment between Sadang and Samsung stations, through analyzing the transit smart card data. We propose mixed train operations of the existing Circle line and a line that goes toward Samsung station in order to transport passengers that have two distinct groups: those with the destination of Samsung station and those with destinations after Samsung station. The introduction of a mixed train operation that encourages passengers passing through Samsung station to take a Circle line train will decrease the congested load factor by 11.3% during the morning peak hours using the mixed train operation of the Circle and Samsung lines. This policy could be an effective method to decrease the load factor and improve the comfort of rail passengers without extra investment in the railway facilities.

Instantaneous torque control of induction motor with line-to-line voltage modulation on the variable load. (가변 부하시 선간전압 변조방식을 이용한 유도전동기의 순시 Torque 제어)

  • No, J.H.;Woo, J.I.;Lee, H.W.
    • Proceedings of the KIEE Conference
    • /
    • 1991.07a
    • /
    • pp.645-648
    • /
    • 1991
  • In conventional sinusoidal wave PWM control, torque oscillation is a problem on account of harmonic component. This paper deals with the choice of line-to-line voltage modulation method, which is effective in using DC(direct current) source voltage and in controlling harmonic oscillation, and the pattern to reduce swiching loss through 1/3 pause of switching interral. So, this paper deals with valid realization of harmonic component and high torque response on variable load by simulation and experiments to compensate occurring problems when line-to-line modulation are applied to PWM inverter.

  • PDF

Development of the Assembly Line Tester of Power Transmission for Lift Truck (지게차용 동력전달장치의 조립라인 전용시험기 개발)

  • Jang, Kyoung-Yeol;Yoo, Woo-Sik
    • IE interfaces
    • /
    • v.23 no.1
    • /
    • pp.58-67
    • /
    • 2010
  • The purpose of this paper is to present the development processes of the assembly line tester of power transmission for lift truck. Because power transmission is most important part of lift truck, all assembled powertrain parts must be inspected for operational defects, pressures and RPM. Developed assembly line tester is designed to take about 25 minutes for inspecting each assembled power transmission and located it at the end of assembled line. The assembly line no-load tester consists of three parts: (1) the driving hardware part; for installing and operating the transmission. (2) control PCB part; send data from sensors to a computer and control driving part, (3) operation software of no-load tester; for an automatic inspection or manual inspection, for database management and printing transcripts.

Real-Time Building Load Prediction by the On-Line Weighted Recursive Least Square Method (실시간 가중 회기최소자승법을 사용한 익일 부하예측)

  • 한도영;이재무
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.12 no.6
    • /
    • pp.609-615
    • /
    • 2000
  • The energy conservation is one of the most important issues in recent years. Especially, the energy conservation through improved control strategies is one of the most highly possible area to be implemented in the near future. The energy conservation of the ice storage system can be accomplished through the improved control strategies. A real time building load prediction algorithm was developed. The expected highest and the lowest outdoor temperature of the next day were used to estimate the next day outdoor temperature profile. The measured dry bulb temperature and the measured building load were used to estimate system parameters by using the on-line weighted recursive least square method. The estimated hourly outdoor temperatures and the estimated hourly system parameters were used to predict the next day hourly building loads. In order to see the effectiveness of the building load prediction algorithm, two different types of building models were selected and analysed. The simulation results show less than 1% in error for the prediction of the next day building loads. Therefore, this algorithm may successfully be used for the development of improved control algorithms of the ice storage system.

  • PDF

Load Frequency Control of Multi-area Power System using Auto-tuning Neuro-Fuzzy Controller (자기조정 뉴로-퍼지제어기를 이용한 다지역 전력시스템의 부하주파수 제어)

  • Jeong, Hyeong-Hwan;Kim, Sang-Hyo;Ju, Seok-Min;Heo, Dong-Ryeol;Lee, Gwon-Sun
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.49 no.3
    • /
    • pp.95-106
    • /
    • 2000
  • The load frequency control of power system is one of important subjects in view of system operation and control. That is even though the rapid load disturbances were applied to the given power system, the stable and reliable power should be supplied to the users, converging unconditionally and rapidly the frequency deviations and the tie-line power flow one on each area into allowable boundary limits. Nonetheless of such needs, if the internal parameter perturbation and the sudden load variation were given, the unstable phenomenal of power system can be often brought out because of the large frequency deviation and the unsuppressible power line one. Therefore, it is desirable to design the robust neuro-fuzzy controller which can stabilize effectively the given power system as soon as possible. In this paper the robust neuro-fuzzy controller was proposed and applied to control of load frequency over multi-area power system. The architecture and algorithm of a designed NFC(Neuro-Fuzzy Controller) were consist of fuzzy controller and neural network for auto tuning of fuzzy controller. The adaptively learned antecedent and consequent parameters of membership functions in fuzzy controller were acquired from the steepest gradient method for error-back propagation algorithm. The performances of the resultant NFC, that is, the steady-state deviations of frequency and tie-line power flow and the related dynamics, were investigated and analyzed in detail by being applied to the load frequency control of multi-area power system, when the perturbations of predetermined internal parameters. Through the simulation results tried variously in this paper for disturbances of internal parameters and external stepwise load stepwise load changes, the superiorities of the proposed NFC in robustness and adaptive rapidity to the conventional controllers were proved.

  • PDF