• 제목/요약/키워드: line contact

검색결과 843건 처리시간 0.029초

15분간의 지속적인 스트레칭이 족저압과 족저면적 변화에 미치는 영향 (Acute Effects of Prolonged 15minnute Static Stretching on Foot Contact Area Surface and Foot Pressure Changed in Young Adults)

  • 국중석
    • 대한물리치료과학회지
    • /
    • 제18권4호
    • /
    • pp.59-64
    • /
    • 2011
  • Purpose : The purpose of this study was to evaluate the effects of the stretching of the calf muscles on foot pressure and contact area in young adult. Participants stood on a wedge board that was sloped between 15~25 degree for 15min. After stretching participants stood quietly on force plate, result was recorded. Participants stood on a force plate for 1 min in eye closed condition, and them the foot pressure and area was recorded. The following variables were calculated off-line: anterior and posterior foot pressure and contact area, medial and lateral foot pressure and contact area. Results showed that anterior pressure change due to stretch, but mediolateral was not significant. This result suggested that stretching of the calf muscle has the effect of increasing anterior pressure by flexibility change on calf muscle, so this effects might be effective intervention for reduce of serious problem to neurologic patients in therapy session.

  • PDF

액체금속이온원을 이용한 n형 GaAs의 오옴성 접촉 (The Ohmic Contact of n-GaAs Using by Liquid Metal Ion Source)

  • 강태원;이정주;김송강;홍치유;임재영;강승언
    • 대한전자공학회논문지
    • /
    • 제26권12호
    • /
    • pp.1995-2000
    • /
    • 1989
  • The ion beam system of 20keV C-W (Cockroft Walton) type composed of the AuGe alloy LMIS(Liquid Metal Ion Source) has been designed and constructed. For the fabrication of the ohmic contact to the n-GaAs, the ion beam extracted from the AuGe alloy source was implanted into the n-GaAs, and it was measured by contact resistivity. The stable AuGe ion beam(2.5\ulcorner/cm\ulcorner was obtained at the extraction voltage of 14.5kV. The measurements of the contact resistivity were done by the TLM (Transmission Line Model) method and the specific contact resistivity was found to be 2.4x10**-5 \ulcornercm\ulcornerfor the implanted sample by the 1.9x10**20/cm**3 and the annealed sample at 30\ulcorner for 2 min.

  • PDF

온도 변화에 따른 전차선 및 조가선의 신축에 관한 연구 (A Study on The Expansion and Contraction in Accordance with Temperature Change of Contact Wire and Messenger Wire)

  • 윤용한;임금광
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2006년도 추계학술대회 논문집
    • /
    • pp.587-592
    • /
    • 2006
  • This paper presents expansion and contraction in accordance with temperature change of contact wire and messenger wire. The tensioning device is designed and installed to pull the contact wire and messenger wire straight at all times. Pulling a contract wire straight ensures that smooth contract is maintained between the contact wire and pantograph of an electric train, and this makes it possible to ensure a stable supply of electricity to the train. Normally, tensioning devices are installed at two positions over a distance of 1.0[km] to 1.6[km] per line. In installing the tensioning device, therefore, it is necessary to study the stroke(the range of the extension/contraction rate of the tensioning device compatible with that of the contact wire and messenger wire due to change in temperature). This paper introduces and discusses this topic.

  • PDF

유한요소기법(FEM)을 통한 압전구동 RF MEMS 스위치의 최적화 설계 및 해석 (FEM Modelling of Piezoelectric RF MEMS Switches)

  • 양창수;박재영
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2007년도 제38회 하계학술대회
    • /
    • pp.282-283
    • /
    • 2007
  • 본 논문에서는 저전압에서 구동 할 수 있는 압전구동 방식의 RF MEMS 스위치를 설계하였다. 설계는 유한요소기법(FEM)을 지원하는 시뮬레이터 (ConventorWare)를 사용하여 수행하였고, 이를 바탕으로 deflection, contact force, stress 등 기계적인 해석을 함으로써 최적화된 설계를 할 수 있었다. 이번 설계에서는 적절한 contact force를 유지하면서 hinge에서 받는 stress를 최소화하기 위하여 구동기를 2개 사용한 듀얼형식의 모델을 제안하였고, hinge의 모양은 'ㄷ'로 하여 deflection을 향상시켰다. 이 듀얼형식의 최적화된 모델은 signal line과 contact pad 간의 gap이 3.4${\mu}m$일 때, 최초 2.8V에서 contact이 이루어졌으며, 5V에서 12.4${\mu}N$의 contact force와 116MPa의 stress를 얻었고, 차후, SP4T나 SP6T 등의 설계시 공간 효율이 높은 다양한 형태의 구조를 설계할 수 있다.

  • PDF

전기철도의 전력선 통신망 설계에 관한 연구 (A Study on the Network Design of Electric Railway for Power Line Communication)

  • 김재문;김양수;안승호;이희준;이종구
    • 한국산학기술학회논문지
    • /
    • 제11권10호
    • /
    • pp.3756-3760
    • /
    • 2010
  • 본 논문은 조가선을 이용한 전기철도의 전력선 통신을 위한 네트워크 설계를 제안한다. 전기철도에서 필수적인 전차선 및 조가선을 이용하여 전력선 통신에 대한 타당성 검토를 선행연구로 수행하였다. 이를 위해 우선 무가압상태에서 조가선에 신호결합기를 취부하여 양방향 데이터 통신을 구현하였다. 데이터 전송속도가 양호하게 나타났으며 이를 토대로 전력선 통신을 위한 주요 구성품을 제시하고 네트워크 설계를 제안하였다. 향후 네트워크 설계에 대한 타당성을 확보하기 위해 지속적인 연구를 수행하고자 한다.

고속 시험선 구간에서의 G7 본선 시운전에 대비한 G7 팬터그래프와 KTX 가선계와의 인터페이스 연구 (A Study on the Interface between a G7 Pantograph and a KTX Catenary System in Preparation for G7 On-line Tests in the Korea High Speed Test Track)

  • 조용현;경진호;허신;최강윤;김기환
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2000년도 추계학술대회 논문집
    • /
    • pp.557-570
    • /
    • 2000
  • It is necessary to perform a study on the interrace between a G7 pantograph and a KTX catenary system prior to G7 on-line tests in the Korea High Speed Test Track in order to predict how high current collection quality can be obtained during the on-line tests and check if safety problems shall be caused b)Y the tests or not. According to the simulation results, current collection quality of the G7 pantograph at 350km/h is lower than that of a GPU pantograph at 300km/h, but the contact wire uplifts and average contact forces are within the safe-zone. In addition, the ratio of running speed (350km/h) to safe running. Therefore, the G7 on-line tests at 350km/h in the Korea High Speed Test Track is expected not to cause the safety problem.

  • PDF

250 km/h급 강체전차선로 설계파라미터 제시 (A Propose of Design Parameters for the Max. Speed of 250 km/h of Overhead Rigid Conductor System)

  • 이기원;조용현
    • 전기학회논문지
    • /
    • 제66권4호
    • /
    • pp.740-744
    • /
    • 2017
  • Overhead Line is divided by two systems which are OCS (Overhead Catenary Line) and R-Bar (Overhead Rigid Conductor system). R-Bar has an advantage of maintenance and economic aspect comparing with OCS. R-Bar in Korea has developed for the max. speed of 120km/h, but it is evaluated up to the max. speed of 250 km/h in Europe. There are lots of mountains and underground sections in korea, it is really necessary to develop the R-Bar for a high-speed line. In the study, design parameters for the max. speed of 250 km/h of R-Bar was proposed. A bracket space, stiffness, and especially an installation tolerance of contact wire height at a bracket were considered as a parameter, and a dynamic behavior between a contact wire and pantograph was predicted by evaluated FEM simulation tool. The installation tolerance and bracket space are more important for the high-speed system. The proposed parameters was decided very conservative. Because the aerodynamic characteristics of a pantograph in tunnel is more severe than an open route and the simulation tool is not considered the such kind of aerodynamic characteristics.

350km/h급 고속전차선로 보호선의 선종결정 기법에 관한 연구 (A Study on the Protection Wire Type Decision of Catenary System in the 350km/h High Speed Line)

  • 이학표;서기범;박재영
    • 전기학회논문지
    • /
    • 제64권12호
    • /
    • pp.1818-1823
    • /
    • 2015
  • In this paper, we analyzed the optimal configuration of protection wire that have been installed in the electric railway power supply system. Protection wires are to suppress the ground potential rise when the short circuit fault between contact wire-rail(C-F), and protect the electronics equipments(signalling and communication) that are facility the wayside. The role of protection wires must be feed back quickly the fault current to the substation when a short circuit fault occurs. In this paper, we proposed that only one line to install the protection wire. Comparing how to newly proposed and existing system, most of the performance is similar. The reason is that most of the current flowing in the protection wire near the location where the fault occurred. There is no problem even if in one line for human safe and the low impedance of the return circuit in dimension to ensure the safety of the facility during the fault. To ensure safety during an fault occurs, it is sufficient even by one line. But, In the protection wire of facilities planning it is necessary to design taking into account the potential utility.

간접접촉 심전도 측정에서의 간접접촉 오른발 구동 접지 성능에 대한 연구 (A Study on Performance of Indirect-contact Driven-right-leg Ground in Indirect-contact ECG Measurement)

  • 임용규;김고근;박광석
    • 융합신호처리학회논문지
    • /
    • 제9권4호
    • /
    • pp.280-287
    • /
    • 2008
  • 간접접촉 심전도(IDC-ECG) 측정에 공통 모드 잡음을 줄이기 위해 오른발 구동(Driven-right-leg) 접지 방법을 적용하고 그 접지의 성능을 조사하였다. 최근에 소개된 간접접촉 심전도 측정 기술은 전극과 인체 피부간의 직접 접촉이 필요하지 않기 때문에, 최근에 필요성이 대두되고 있는 가정에서의 장기간 무구속 심전도 측정에 적합한 측정방법으로서 현재 다양한 응용이 연구되고 있다. 그렇지만 간접접촉 심전도는 전원선에 의한 60Hz 잡음이 기존 측정 방법보다 크게 발생하여, 응용 범위의 확대에 제약 조건이 되고 있다. 본 연구에서는, 기존의 심전도 측정 방법에 사용되는 오른발 구동 접지 방법을 간접접촉 심전도 측정 방법에도 적용하여, 공통모드 잡음 성분을 반전 증폭하여 의자 좌판(seat)에 깔린 전도성 직물을 통해 인체에 feedback하였다. 이로써 피부와 직접 접촉이 없는 간접 접촉 방식의 오른발 구동 접지를 구현하였으며, 이 접지가 안정적으로 동작되고, 오른발 구동 이득이 약 1000정도에서 40dB 수준의 전원 잡음 감소 됨을 확인할 수 있었다. 이 연구의 결과로 간접접촉 심전도의 주파수 대역을 기존의 30Hz이하에서 100Hz 수준까지 높일 수 있게 되었으며, 접지 임피던스를 높일 수 있게 되어 간접접촉 심전도의 응용 분야를 더욱 넓힐 수 있게 되었다.

  • PDF

도시철도 교량구간의 전차선 압상량에 대한 안전성 연구 (A study on the safety about Contact wire uplift of a metro-railroad bridge section)

  • 장우진;조용현;이기원;소선영;박종학;이재봉
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2006년도 추계학술대회 논문집
    • /
    • pp.821-831
    • /
    • 2006
  • There are 5 railway bridges in a Seoul metro network; Jamsil, Dangsan(line 2), Dongho(line 3), Dongjak(line 4) and Chungdam(line 7). Because there are strong wind and vibration in the bridges, uplift of a contact wire caused by pantographs in the bridge section is higher than in a normal section. If the uplift at the support point exceed 10 cm, an interference between pantographs and catenary system happens. Estimated maximum uplift is obtained by applying safety factor 2 to the simulation results. The application of the safety factor is needed for taking into account of the effect of the wind, etc. Previously, we can not check whether or not the safety factor is proper. Recently, we can measure the uplift during the train operation, as a telemetry system which can measure dynamic behavior of the contact wire has been developed. The aim of this research is to review how proper the safety factor related to the uplift is, based on the measurement. We performed simulations and experiments for the uplift at the Jamsil railway bridge. The simulations were performed for the every kind of the train passing the Jamsil bridge. In order to compare the analysis results with the measurement results, we measured the uplifts at the support when the trains passed the measuring point. Finally, we proposed adequate safety factor with the uplift for the bridge section.

  • PDF