This study was carried out to investigate the optimum management system during a overwintering for the production of Pinus densiflora container 2-0 seedlings. The experiment performed between 2005~2006 in a polyethylene film house (PE house) located at Yeoju-Gun in Kyungki-Do. During the winter in the PE house, the difference in maximum day temperature and minimum day temperature was large, and the difference in temperature was detected between the container keeping locations. During the winter season, the maximum day temperatures at the seedling bench in January and February were $32.8^{\circ}C$ and$36.6^{\circ}C$, respectively, whereas those at the ground in January and February were $16.0^{\circ}C$ and $24.4^{\circ}C$, respectively. Water contents of container seedlings was reduced gradually from the beginning the experiment, and reduced rapidly from February to March, and increased rapidly from April. Container seedlings showed different death rate according to the extending of the irrigation cycle. Death rate by one week and two weeks of irrigation cycle was 4.8% and 6.5%, and 38.5% and 49.4% of death rate occurred by three and four weeks of irrigation cycle, respectively. It is suggested that the proper irrigation cycle for P. densiflora 2-0 container seedlings during overwintering is two weeks. When containers placed directly on the ground, the root of container seedlings went out through the drainage of the container, and grew out in the soil. These roots were cut while moving the container to the bench in spring.
Journal of the Korea Institute of Information and Communication Engineering
/
v.18
no.1
/
pp.18-24
/
2014
For successful projects, Project Management Information System(PMIS) using the formal systematic processes is necessary. Because the existing PMIS focuses on low-level project management, the life-cycle administration of the projects is required. In this dissertation, I describe not only the processes for managing a project with the top-down approach(a hierarchical goal setting of the project outcome), but also PMIS which can control whole processes of R&D projects. The PMIS described in this dissertation can reduce the workload of project management by providing user-adaptive environments and linking with related systems, so can be helpful to enhance the efficiency of the project management. And, it is expected that these processes can be the standard project management processes which are adaptive to various types of projects.
As time passes, the aging of the plant building, the building's energy performance degradation than the initial plan does not express a situation could arise. This year, the certification of buildings certified in 2009 has expired for measures such as the situation required. In this study, management of national and international green building certification and re-certification was compared in two ways. First, the evaluation of green building certification system management assessments were compared. Second, the green building certification system for the re-certification analysis. As a result, G-SEED was not reflected life-cycle of building in management assessment and the commissioning of G-SEED is the UK and the U.S and other concepts of evaluation. In addition, the re-certification system is insufficient about substantial energy consumption of buildings. In this study, the revised the management assessments in conjunction with the re-certification system to manage the building is proposed to improve. In addition, the current evaluation of the existing building certification "existing building" and "building the first certified" as it is more efficient to separate the information into assessment was judged. Green building certification system to meet the purpose of management and operation, and disposal phases of the building to promote energy conservation and sustainability in order to the management a systematic and detailed evaluation and re-certification system developed for the revision of the specific items required and future research want to continue.
VU, Thong Quoc;PHAM, Cuong Phu;NGUYEN, Thu Anh;NGUYEN, Phong Thanh;PHAN, Phuong Thanh;NGUYEN, Quyen Le Hoang Thuy To
The Journal of Asian Finance, Economics and Business
/
v.7
no.9
/
pp.389-400
/
2020
A construction project is a designed product made up of labors, materials, and installations in the project positioned on the ground and may include the underground and ground section, and the section in water or on the water surface. It is a civil, industrial, transport, agricultural and rural development, infrastructure, or some other. A key phase in the life cycle of these construction projects is the implementation when building products are made directly with workers, equipment, materials, and managers. If there is a lack of management experience, information, and problem-solving solutions to tackle the risks faced by contractors, especially foreign ones, will fail in controlling the project's cost. This study was conducted with investigations, discussions, and evaluation of the factors that lead to cost overruns in the construction projects of international contractors in Vietnam. The principal component analysis (PCA) showed that those factors that influence cost overruns these construction projects fall into five general groups, including factors related to (i) the owners, (ii) the foreign contractors, (iii) the subcontractors and suppliers, (iv) state management, and (v) the project itself. Besides, the study proposes solutions to limit cost overruns in construction projects and improve the profitability of international contractors in Vietnam.
One of the important applications in Enterprise Resource Planning(ERP) systems is the Manufacturing Resource Planning(MRPII) system using Bill of Material(BOM). The manufacturing resource planning determines the quantity and timing of the production or purchase of subassemblies and raw materials needed to support the Master Production Scheduling(MPS). The bill of material is the recipe, a list of the materials needed to make a product. This paper intends to suggest a component-based materials management system using Unified Modeling Language(UML), as an application system for automobile part industry. Applying component based materials management systems designed with UML methodology, we analyzed the workflow and the document on materials management process from production planning to inventory management, and implemented a prototype of efficient materials management system, as a surrogate of existing material requirement planning(MRPI) system. To produce many other assemblies for a automobile part firm, component parts are assembled into subassemblies that are joined to assemble the finished product. Through the system suggested in this study, the level of inventory has cut down and the cost of inventory management has decreased. Also, the development method using UML makes the analysis and design phase to shorten in implementation period of MRPII system. The implementation of materials management system using CBD shows the ease of use in software reuse and the interoperability with corporate Internal information system. The result of applying object-oriented CBD technique is to minimize the risk of life cycle and facilitate the reuse of software as mentioned to limitation of information engineering methodology.
Motorola which had developed and commercialized wireless telephone and mobile phone for the first time in the world made a decision on the separation of the mobile unit from the Motorola due to the continuous bad performance turn. In addition, the Korean company named Raincom which had developed and commercialized MP3 player have been disappeared since Raincom failed to compete with iPod of Apples. What is the main cause the companies that have been top of the world level weed out of IT product market? For less product life cycle and globalization of market, the company's competitiveness tends to be determined based on company's creative capability, rather than process implementation capability. Thus, companies spent a great amount of time and effort in the introduction of creativity management and R&D activities. However, as company's continuous investment on R&D and innovation activities did not lead to business performance, they starts to pay much attention on the effective R&D and innovation activities. Therefore, this paper tries to solve the limitation of the effectiveness of R&D activities by introducing the concept of 'creative quality'. The creative quality is executed by the creative process, which is designed for getting over the limitation of the traditional brainstorming method. This paper presents the concept so called 'creative quality management' and expects it to be an alternative to conquest the limitation of six sigma management.
Lee, Sang hyuen;Byeon, Seon yeong;You, Hyeon jeong;Park, Choon won
Journal of Korean Society of Archives and Records Management
/
v.18
no.2
/
pp.215-242
/
2018
The record continuum theory is now being studied in Australia, wherein the segregated record management of current, semi-current, and past records based on the temporal flow of the life cycle theory are being critcized. In addition, it emerged as a new paradigm for electronic record management without time and spatial constraints. Moreover, it is recognized as a logical and conceptual entity rather than as a fixed physical object. It also makes it possible to record multiple records in consideration of the complex, multidimensional environment of records. Based on this record continuation theory, the current information and communications technology (ICT) is applied to the four axes and dimension of the record continuation diagram of theoretical researcher Frank Upward. The researchers aim to realize a video recording management method suitable for the electronic record age.
Korean Journal of Construction Engineering and Management
/
v.5
no.5
s.21
/
pp.109-116
/
2004
Recently, many korean construction companies have faced many environmental changes and demands for external changes. This demand for external changes is necessary for all companies that is under the survival of fittest. The internal/external of environmental changes affect the organizations of company largely, and these management organizations have relation with the corporate of management performance closely. In response to that, to be adapted to the environmental change and to raise the corporate of management performance, the construction companies have tried to change the organizations such as organization re-design, organization re-build, organization innovation. Because the organizational structure that is preventive in the growth of companies bring a negative effect, the companies need to have the effective organizations to raise the corporate value. The effective organizations could be used the important indicator that builds the corporate goals and manages the organizations. Also, the organization development and organization management can prepare for environmental changes can be the important base to increase the management performance. Therefore, After surveying and analyzing the character of organization structure in respect to the OLC, this study present the Organization Structure Model that can design the appropriate organization by the growth of companies.
Korean Journal of Construction Engineering and Management
/
v.10
no.6
/
pp.67-77
/
2009
Infrastructure asset management can be defined as the long term and cost effective management strategy to meet the required service level. In most developed countries, the major motivations of the introduction of asset management are increment in number of assets, extension of maintenance field, accounting approaches of public facilities, performance-based FM(Facility Management), limitations of public funds and public-private partnership, life cycle cost approach, and the development of information technology. This paper discusses the strategic and stepwise methods of introducing infrastructure asset management. Strategic approaches are suggested to develop the practical methods of condition and value assessment of assets, and long-term capital investment plan for optimized decision making(ODM). Required systematic processes are analyzed in terms of resource and technical limitations and detailed implementation plan for each development phases are suggested.
KSCE Journal of Civil and Environmental Engineering Research
/
v.32
no.4D
/
pp.345-356
/
2012
Road pavement requires repetitive maintenance works to maintain satisfactory service level to the public. However, the repetitive maintenance works upon deteriorated pavement structure make negative effects to deterioration speed. It often leads to inefficient use of limited budget. For that reason, the pavements require reconstruction work to recover their original performance. Recently, construction demands in the Korean national highway have already been reached to maximum level, and the aged pavements start to demand much more reconstruction works. However, in the real world, road agencies have often been confused when they determine maintenance design for such aged road sections due to budget constraint. It is because there is no reliable long-term maintenance strategy that supports their decision making. To support their decision making, this paper aimed to suggest the best maintenance strategy considering changing process of pavement performance by repetitive maintenance works. As an analysis method, probability distribution and hazard function to estimate the life expectancy were adopted, and then the results were used for long-term life cycle cost analysis with deterministic or Monte-Carlo method under various scenarios. As an empirical study, the Korean national highway data that has long-maintenance history data since 1986 has been applied. Last, this paper considered quality assurance of maintenance work to improve maintenance quality. These could be important information as a part of long-term maintenance strategy of pavement.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.