• Title/Summary/Keyword: life cycle management

Search Result 1,502, Processing Time 0.037 seconds

The Development of Urban Metro Maintenance Facility System Using Construction Classification System Management (공종분류체계를 활용한 도시철도 시설물 유지관리시스템 개발)

  • Hyun, Ji-Hun;Yang, Byong-Soo;Moon, Sung-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.4
    • /
    • pp.69-77
    • /
    • 2012
  • The construction data should be controlled from the life-cycle perspective. The current PMIS (Project Management Information System) usually focuses on the construction operation stage. The PMIS does consider the utilization of the construction in the maintenance of constructed facilities. This paper tries to interface the construction data with the maintenance data for effective use of construction data in the life-cycle perspective. To achieve the research objective, a maintenance breakdown structure is established and connected to the work breakdown structures. The connection of the two breakdown structures provide a structured utilization of construction data for efficient maintenance work activities. A prototype suggests that the interface of maintenance and work breakdown structures can help provide a construction and maintenance data in a more efficient way for maintenance activities.

A Study on the Development plan of Configuration Control for Military Product (군수품 형상통제업무 발전방안에 관한 연구)

  • Jung, Hyun-Woo;Shim, Bo-Hyun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.6
    • /
    • pp.70-77
    • /
    • 2020
  • Configuration management is an important project management method. Configuration management is increasing daily and improving defense power as a management tool for technical data of power support systems. Configuration management work must be carried out properly from the beginning of development to acquire an excellent weapon system. In procurement, configuration management is a vital factor that can determine the cost of maintaining operations during the transfer of military supplies and carry out systematic management among operational support. Countries are making changes to policies and systems to manage R&D, standards, and patents in conjunction with each other from the beginning of research and execution, and it is important to establish the concept of managing and controlling the configuration as an efficient means of managing military resources. To identify the activity details during the entire life cycle from the beginning of acquisition to the end of disposal by linking munitions configuration control with the total life cycle, and redefine the appropriate work system, this study investigated and analyzed the U.S. configuration control procedures to identify the activity details and present areas to develop.

A Study for Analyzing Life Cycle Cost of Membrane Water-proofing of Roof - Focused on precaution for securing quality - (건축공사 옥상 도막방수 공법의 LCC 분석 - 품질확보를 위한 사전대책을 중심으로 -)

  • Bae, Jae-Wook;Shin, Seung-Moon;Kim, Sang-Gap;Koo, Choong-Wan;Hong, Tae-Hoon;Koo, Kyo-Jin;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.4
    • /
    • pp.57-65
    • /
    • 2008
  • As the society is being developed, the desire about life quality is also growing. Even though the process of waterproof work has very close relation with these life quality, we always focus on management after problem than the precaution of problem. So this process has the highest rate of mengel. We develop LCC analysis model considering the precaution and try to show the necessity of the precaution by comparing and analyzing every alternative proposal during LCC. By studying of the previous work and the result of questionnaire, we deduce the problem of waterproof work in construction area. By discussion with an expert in this process and research, we make solutions about precaution and set the cost items in every alternative proposal about these solutions. We understand the effect of each elements through sensitive analysis of the cost items, and find the economically best suited solution.

A Study on the case study LCA Analysis for the Education and Research Building of S University (S대학교 교육연구동 LCA분석 사례 연구)

  • Bum Sung-Woo;Kim Min-Hyun;Park Tae-Keun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.465-468
    • /
    • 2003
  • It has taken a growing interest about environmental problems such as global warming and water pollution. Because of intensified environmental problems, it would be going on the research about environmental preservation and harmful factor reduction. Also, it makes ISO to show the quantitative data about LCA analysis. The research of LCA method in the domestic construction industry has advanced stealing from a national point of view. In this study, it would be possible to confirm the feasibility of a plan by LCA analysis. Moreover, the result of life cycle cost which deliberate the influence cost of environment in the steps of material production, construction, maintenance, and disposal has made to be 74,819,560,776 won in a plan and 78,979.469,602won in alternative. That is, it would analysis for a plan to reduce 4,159,908,826 won for alternative.

  • PDF

A Models of Economic Analysis in Safety Diagnosis for Remodeling Strategies of Apartment Housing (공동주택의 리모델링 전략을 위한 안전진단의 경제성분석 모델)

  • Seo Kwang-Jun;Choi Mi-Ra;Shin Nam-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.4 s.26
    • /
    • pp.164-171
    • /
    • 2005
  • The importance of the life cycle cost analysis(LCCA) for apartment housing remodeling projects has been fully recognized over the last decade. Accordingly theoretical models, guidelines, and supporting software systems were developed for the life cycle cost analysis of apartment housing remodeling systems. However, the level of consensus on LCCA results is still low due to the lack of reliable data on remodeling activities for safety diagnosis. in order to predict the reliability based LCCA of the given case, suggested the remodeling strategies level after reviewing other related materials. Apply the real information of the economic index. And based on such analytical measures, remodeling and operation cost and LCC in remodeling strategies level have been predicted; suggests the basic information about remodeling interventions level for the apartment housing. The LCC analysis models and the fuzzy logic based safety assessment presented in this study can greatly contribute to the value-oriented design alternative selection, estimation of the economic analysis, and the allocation of budget for apartm.

A Study on the Maintenance Expenses of the Public Rental Rousing (공공임대주택 수선비 지출 실태에 관한 연구)

  • Kang, Hyun-Kyu;Han, Choong-Hee
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.171-180
    • /
    • 2005
  • Public rental housing is constructed, owned, and managed by the public sector. The public institution for the public rental housing controls the whole building life cycle from the construction to the demolition. The construction company for the house built for sale is strongly interested in the cost for the initial investment, while the public institution is more focused on the maintenance cost for the preservation of the buildings Nevertheless, the maintenance cost of the public rental housing has been only managed as the accounting factor without the systemic research and analysis on the actual condition. This paper shows how expenses are related to the degree of obsolescence and presents the differences of the maintenance costs by the housing area and expenditure trends (vs time) of the maintenance costs, through analyzing time series data of public rental housing maintenance cost. Further, this paper helps understanding the causes of the differences of the maintenance costs by housing areas and characteristics of the expenditure trends. After all, this paper contributes to the improvement of the reliability and the practicality for the Life Cycle Cost modeling and the maintenance cost estimating.

A Decision-Making Model for Shortening Construction Period through Concurrent Engineering (동시공학을 통한 공기단축 의사결정 모델)

  • Choi, Do-Seung;Lee, Jae-Seob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.6
    • /
    • pp.197-206
    • /
    • 2007
  • The age of synthetic correspondence against "development period shortening, high quality" is about to come. While the product is becoming complexation gradually and also diversification, life cycle of product gets shorted. Under the infinity competition age, the certain answer of "the survival of the fittest" is that the enterprise itself must be able to shorten development and delivery term, reduce product development and life cycle cost, and satisfy customer in performance and value. From this point of view, concurrent engineering's theory, which develops the process of product in the manner of repetition, parallel, and synchronousness, is realized as a important strategy instrument in construction. This study investigates and analyzes several examples in order to apply concurrent engineering successfully, and presents the decision-making model through the simulation about the factor affecting in each process.

The Economic Efficiency Assessment of Infrastructure considering Environmental Cost - A Case Study of Emergency Spillway for Korean Multipurpose Dam - (환경비용을 고려한 공공시설물의 환경경제성 평가 -국내 다목적댐 비상여수로 시설 사례연구 -)

  • Kwun, Suk-Hyun;Kim, Sang-Bum
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.3
    • /
    • pp.168-176
    • /
    • 2007
  • This study aims to provide useful information when making a decision for the environmental and economic efficiency assessment of infrastructure, based on Life Cycle Assessment(LCA). It estimates environmental cost on environmental pollutants that are possible to happen by locations and by types of emergency spillway for korean multipurpose dam, which is selected as a study case. For this purpose, this study examines the theories of LCA and Contingent Valuation Method(CVM) and suggests an analysis model of environmental cost. To apply the suggested analysis model of environmental cost for infrastructure to the case study of emergency spillway at the multipurpose dam, this study calculates environmental load on environmental pollutants that generate during life cycle, converts it to a cost to predict environmental cost, evaluates environmental economy of emergency spillway by the estimated result, and draws the optimum alternative that is environmental-friendly and economic.

The Life Cycle Cost Optimization Methodology as a Tool for Designing Apartment Units (공동주택 단위세대의 생애 비용 최적화 방법론 연구)

  • Park Tae Keun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.1 s.1
    • /
    • pp.80-86
    • /
    • 2000
  • The future costs of energy and the cost of the repair of apartment buildings are expected to rise continuously in proportion to the initial costs. Therefore it has become important for these increasing costs to be incorporated and reflected in the design of the building. Systems such as structure and services for the buildings remain constant, but a number of the walls and windows can vary and thus have a major influence on the total construction and running costs of a building. The critical factor in the apartment unit design for the optimization of life cycle cost (LCC) is the ratio of the x and y axis of the walls in the unit plan. This paper demonstrates how to achieve the optimal size and thus optimize the LCC of the building.

  • PDF

A Life Cycle Cost Case Analysis on the Build-Transfer-Lease(BTL) Projects of School (학교 임대형민자사업(BTL)의 LCC 사례 분석)

  • Cho, Seung-Yun;Ahn, Jang-Won;Kim, Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.145-150
    • /
    • 2007
  • This study is a LCC case analysis on the school one of the BTL projects which is constructed by private organizations and rented to government. According to the RFP to make out documents, it is performed the case analysis based on the results of LCC calculation about maintenance & conservation costs; repairing costs and replacement costs. It is analyzed LCC on maintenance & conservation costs for 20 years(rent period) and 65 years(life cycle). As a result of LCC analysis, about more than 50% of total LCC are architectural works and the rest of them are machinery works, electric works, and civil works in the order. And it is also suggested some problems and their solutions to perform LCC analysis on the current BTL projects of school.

  • PDF