Browse > Article

A Decision-Making Model for Shortening Construction Period through Concurrent Engineering  

Choi, Do-Seung (동국대 대학원 건축공학과)
Lee, Jae-Seob (동국대 건축공학과)
Publication Information
Korean Journal of Construction Engineering and Management / v.8, no.6, 2007 , pp. 197-206 More about this Journal
Abstract
The age of synthetic correspondence against "development period shortening, high quality" is about to come. While the product is becoming complexation gradually and also diversification, life cycle of product gets shorted. Under the infinity competition age, the certain answer of "the survival of the fittest" is that the enterprise itself must be able to shorten development and delivery term, reduce product development and life cycle cost, and satisfy customer in performance and value. From this point of view, concurrent engineering's theory, which develops the process of product in the manner of repetition, parallel, and synchronousness, is realized as a important strategy instrument in construction. This study investigates and analyzes several examples in order to apply concurrent engineering successfully, and presents the decision-making model through the simulation about the factor affecting in each process.
Keywords
Concurrent Engineering; Simulation; Overlap; Sensitivity; Production;
Citations & Related Records
연도 인용수 순위
  • Reference
1 남규현, 송성진 (2000),' 동시공학 경영혁신 이론과 사례에 관한 연구', 대한건축학회 논문집 16권 12호
2 박찬식, 장선호, 김기홍 (2003),' 설계의사결정 과정에서의 확률적 공사비 계획 모델', 대한건축학회 논문집, 19권 11호
3 Bogus, S. M. (2004). 'Concurrent Engineering Strategies for Reducing Design Delivery Time,'PhD Dissertation, University of Colorado, Boulder
4 Barrie, D. S., and Paulson, J., Boyd C. (1992). Professional Construction Management, McGraw-Hill
5 김대영 (2002), '린 건설의 도입 및 수행', 건설관리 12월호, 한국건설관리학회
6 Clough, R. H., and Sears, G. A. (1991). Construction Project Management, John Wiley & Sons, Inc., New York, NY
7 Blackburn, J. D., editor. (1991). Time-Based Competition: The Next Battleground in American Manufacturing, Business One Irwin, Homewood, IL
8 김정훈, 구교진, 현창택 (2003), '설계시공 일괄방식 프로세스 성공모델에 관한 연구',한국건설관리학회 논문집, 제4권 제3호