• 제목/요약/키워드: life cycle management

검색결과 1,497건 처리시간 0.04초

Automated Life-Cycle Management System Based on SCM for Super High-rise Buildings Construction (SCM기반 Automated Life-Cycle Management System 구축방안 - 초고층 빌딩 커튼월을 중심으로 -)

  • Yoon Jeong-Hwan;Kim Yea-Sang;Chin Sang-Yoon;Kim Chang-Duk;Choi Yoon-Ki;Chun Jae-Youl;Lim Hyung-Chul
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 한국건설관리학회 2003년도 학술대회지
    • /
    • pp.430-433
    • /
    • 2003
  • Cost, schedule, quality are the essential parts of success of every construction project. It is especially true in high-rise building construction. Among the construction components in high-rise building construction, curtain walls are very important elements for the project success because they take large portion of cost and schedule. However, curtain wall construction process are very complicated, where many entities including designers, suppliers, contractors and even maintenance contractors are involved. Therefore, control and management of their relationships and production process are critical. It is suggested that this can be solved by the concept of Supply Chain Management which is supported by the automated information technology with Radio Frequency Identification. Such concept is defined as 'Automated Life-Cycle Management System Based On SCM' and this study suggests rode map to establish the system.

  • PDF

Regression Analysis of Life Cycle Profile for Life Cycle Cost and Bridge Management System (교량관리체계 개선 및 LCC분석을 위한 생애주기 성능이력 회귀함수의 산정)

  • Kong, Jung-Sik;Park, Heung-Min;Lee, Kwan-Kyun;Park, Chang-Ho;Shin, Jae-In
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.149-154
    • /
    • 2008
  • Service life of bridges should be evaluated by physical life considering damage/deterioration. But it is difficult to identify optimal maintenance scenario due to insufficient research related to that. To identify optimal maintenance scenario, it is needed to develope life cycle profile model of condition state variation by deterioration factor. The LCP model has been developed in consideration of regression analysis and survey in this study. It is expected that the LCP model could help to achieve HBMS system improvement.

  • PDF

A Measure for Improving the Systematic Evaluation of the Life Cycle Cost in Technical Proposal Tendering (기술제안입찰에서의 계적인 생애주기비용 평가를 위한 개선방안)

  • Son, Myung-Jin;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • 제13권6호
    • /
    • pp.71-83
    • /
    • 2012
  • The use of technical proposal tendering has been expanding recently with the aim of effecting cost reduction, quality enhancement, technological development and value realization centered on multifunctional administrative cities, innovation cities, and the Yongsan relocation project. In line with the increasing interest towards life cycle cost improvement measures as an important evaluation category concerning technical proposal tendering, efforts in preparing measures that can execute the security of credibility and objective evaluation concerning architectural life cycle cost are being made. However, problems such as lack of applicable cases of design development and detail design, distortion of initial construction costs concerning the original plan, combination of constant price and current price, the ambiguity of the calculation standards between tendering corporations, inaccuracy of terms, and insufficient compositional formats concerning life cycle improvement measures are being cited. Accordingly, this study sought to propose a measure to improve the compositional guidelines, format, and standards so that a systematic life cycle cost evaluation can be executed for the reliable distinction of each participating corporation, enhanced credibility and objective evaluation of the life cycle cost improvement measure for technical proposals.

Critical Assessment of Programme-Based Conflict Resolution Model Applied to Multiple Stakeholders Within The Context of Industrialized Building Production and Life Cycle Supply Chain System

  • Tanaka, Koji
    • International conference on construction engineering and project management
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.551-562
    • /
    • 2022
  • The building production system has been analysed by the dichotomy "employer-contractor" relationship, which failed to take into account of the role and function of multiple stakeholders within the life-cycle supply chain. This is further observed in the current conflict resolution model, which, in my argument, struggles to contribute to industrialize the building production and achieve better efficiency and effectiveness as expected. The purpose of this paper is to critically assess the issues of current programme-based conflict resolution model, and discuss alternative models how they can be modelled and applied to the construction projects. The conclusions of findings are; First, the current model is framed around the contracts and dispute resolutions based on the legal concept of "claimant and respondent" where one party(s) advances a claim once and the other(s) objects, as such it fails to reflect the nature of construction projects where multiple stakeholders are involved concurrently and for a long period of life-cycle of buildings. Second, an alternative is "Six-stakeholders model" which represents the multiple stakeholders and clarifies the flow of obligation-liability-monetary relationships among participants for a long period of life-cycle of buildings. Further, with reference to both historical and recent cases, a reflection and insight into pros and cons of programming method is added, especially as to why this method is considered to have become a mandate of the modern construction management, and how academics and practitioners should deal with it more cautiously and prudently.

  • PDF

Derivation of Profit Curve by Cubic Cost Function and Mathematical Verification of Industry Life Cycle: Focused on All Industries in Korea (3차 비용함수에 의한 이익곡선 도출과 산업 라이프사이클의 수리적 검증: 우리나라 전 산업을 중심으로)

  • Hoo Seok Pai;Chae Kwan Lim
    • Journal of Korean Society for Quality Management
    • /
    • 제51권4호
    • /
    • pp.481-496
    • /
    • 2023
  • Purpose: The main theme of this study is to derive a profit curve by a cubic cost function for nonlinear CVP analysis. According to the analytical approach to derive a nonlinear profit function in this study, it is possible with only the existing cost structure to calculate the profit maximization and downtime point sales unlike the classical CVP analysis. Furthermore, the profit curve by the mathematical model of this study could serve as a tool to quantify the qualitative evaluation of each stage of the industry life cycle. Methods: This study followed the mathematical approach from the cubic cost function model of microeconomics, and using real data of the Bank of Korea Results: The nonlinear profit function suggested by this study is as follows; ${\pi}(x)=-a\left(x-\frac{f}{1-v}\right)^3+(1-v)x-k$ where $a=\frac{1}{3}v\left(\frac{(1-v)}{f}\right)^2,k=f-a\left(1-\frac{f}{1-v \right)^3$ Conclusion: The process and results of this study would be able to contribute not only in practice of nonlinear CVP analysis required in the management accounting or financial management, but also in cost theory of microeconomics. Also, since the life cycle of all industries in Korea was verified to the growth or mature stage, decision makers should pay careful attention to determining life cycle stages and consider the profit curve by the average variable cost ratio over multi periods.

A Development Plan for PMIS based on Total Life Cycle (전수명주기를 고려한 PMIS개발 방안)

  • Park, Soo-Choong;Lee, Seong-Gwon;Jung, Kye-Young;Kim, Jae-Jin
    • Proceedings of the KSR Conference
    • /
    • 한국철도학회 2011년도 정기총회 및 추계학술대회 논문집
    • /
    • pp.1282-1288
    • /
    • 2011
  • Recently, the demand regarding reliability and safety of the railroad are increased as built to high-speed railway and Driverless LRT systems. Accordingly, effective management of construction projects is being applied, with the introduction and use of PMIS computerized systems. Due to the construction of railways, from the start of PMIS research planning, design, procurement, to construction and commissioning, various expertise is being carefully gathered, and by integrating it into the unified budget ideas and processes, rational, efficient, organized, and manageable financial plans are developed for the computerized system. However, the current PMIS does not take into account the life-cycle. Therefore, this study is to bring attention to the BIM smart BOM-based configuration management for life-cycle through the consideration for railway construction project management.

  • PDF

Analysis of Educational Expenditures by family life cycle (가족생활주기에 따른 가계의 교육비 지출 분석)

  • 양정선;김순미
    • Journal of Family Resource Management and Policy Review
    • /
    • 제7권1호
    • /
    • pp.135-152
    • /
    • 2003
  • This study examined which factors influence educational expenditure by family life cycle. Data for this study were from the 2001 Household Income and Expenditure Survey and consisted of a sample of 2,681 households. The results showed that the households having high school students had the highest educational expenditure and the households having middle school students had the highest ratio of educational expenditure to consumption expenditure. The education of household head, family type, the number of children, the age of the youngest child, and family income had significant effect on educational expenditure in all the stages of family life cycle. The results of this study will be useful for financial management of households and give suggestions for the government policy on education.

  • PDF

A study on service parts demand forecasting considering parts life cycle (부품 수명주기를 고려한 서비스 부품의 수요예측에 관한 연구)

  • Kwon, Ick-Hyun
    • Journal of the Korea Safety Management & Science
    • /
    • 제19권3호
    • /
    • pp.97-107
    • /
    • 2017
  • This research studies on the demand forecasting for service parts considering parts life cycle, that gets relatively less attentions in the field of forecasting. Our goal is to develop forecasting method robust across many situations, not necessarily optimal for a limited number of specific situations. For this purpose, we first extensively analyze the drawbacks of the existing forecasting methods, then we propose the new demand forecasting method by using these findings and reinforcement leaning technique. Using simulation experiments, we proved that the proposed forecasting method is better than the existing methods under various experimental environments.

Design of Technical Information System for Naval Engineering (조함기술정보체계 설계에 관한 연구)

  • 심이섭
    • Journal of the Society of Naval Architects of Korea
    • /
    • 제41권2호
    • /
    • pp.121-127
    • /
    • 2004
  • The objective of this study is to design the technical information system for naval engineering (named TISNE). As the basic concept of the system, CALS (Continuous Acquisition and Life-cycle Support) and KMS(Knowledge Management System) were considered for the management and sharing of standardized digital information throughout the life-cycle of naval ship. To define the system components and their functionalities, the processes of naval ship design and construction were reviewed. Also web-based system prototype and the graphical user interlaces were designed and implemented.

Evaluation Life Cycle Management Model on the Basis of Result to Evaluate Information Systems (정보시스템 평가를 위한 결과 기반 평가생명주기 모형 설계)

  • Lee, Sangwon;Kim, Sunghyun;Park, Sungbum;Ahn, Hyunsup
    • Proceedings of the Korean Society of Computer Information Conference
    • /
    • 한국컴퓨터정보학회 2014년도 제50차 하계학술대회논문집 22권2호
    • /
    • pp.93-94
    • /
    • 2014
  • Enterprises or public organizations have invested in development of their information systems and operated them repeatedly. Since these information systems projects have unique characteristics such as technology sensitiveness, network effectiveness, embeddedness, and externality, these investment projects have been not taken care of in the field of administration and evaluation. And then, it is difficult to manage and monitor them. In this research, we propose a evaluation life cycle management model on the basis of result to evaluate information systems. This life cycle model with ten stages would furnish a guide to introduction of total evaluation systems.

  • PDF