• 제목/요약/키워드: level-operation method

검색결과 1,178건 처리시간 0.029초

3-Level T-type Inverter Operation Method Using Level Change

  • Kim, Tae-Hun;Lee, Woo-Cheol
    • Journal of Electrical Engineering and Technology
    • /
    • 제13권1호
    • /
    • pp.263-269
    • /
    • 2018
  • In this study, a selective inverter operation between a 2-level voltage source converter (VSC) and a 3-level T-type VSC (3LT VSC) is proposed to improve the efficiency of a 3LT VSC. The 3LT VSC topology, except for its neutral-point switches, has similar operations as that of the 2-level VSC. If an operation mode is changed according to efficiency, the efficiency can be improved because efficiencies of each methods are depending on current and MI (Modulation Index). The proposed method calculates the power losses of the two topologies and operates as the having lower losses. To calculate the losses, the switching and conduction losses based on the operation mode of each topology were analyzed. The controller determined the operation mode of the 2- or 3-level VSC based on the power loss calculated during every cycle. The validity of the proposed control scheme was investigated through simulation and experiments. The waveform and average efficiency of each method were compared.

철근콘크리트 골조공사의 프로세스 및 공정 공백 산출 시뮬레이션 모형 개발 (Development of Computing Model for the Process and Operation Interval of Reinforced Concrete Work using Web-CYCLONE)

  • 박상민;손창백;이동은
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 춘계 학술논문 발표대회
    • /
    • pp.341-343
    • /
    • 2012
  • This study introduces a method for computation of process and operation gap in the specific construction operation(i.e., RC frame construction applying a block-grouping scheme) using CYCLONE-based simulation modeling and analysis technique. Since uncertainty of construction environment exists, a thoughtful production planning is required to effectively deal with a risk resulting in schedule delay in advance. This study presents the concepts of a time delay occurred in a process level and operation level in a operation model, and a method of measuring gap-times in each level while the simulation progresses. It helps a site manager to decide how many segmentation in a construction block is suitable for eliminating unproductive time-delays under the constrained resources (e.g., laborer, equipment). A case study presents a network model representing a three segmented RC frame work, and result obtained from the simulation experiment.

  • PDF

MRM: 상징행렬을 이용한 다단계 리드뮬러회로의 합성 도구 (MRM : A synthesis Tool for Multi-level Reed Muller Circuits using Symbolic Matrix)

  • 이귀상;창준영
    • 전자공학회논문지A
    • /
    • 제32A권10호
    • /
    • pp.73-80
    • /
    • 1995
  • In this paper, a synthesis tool using matrix operations for designing multi-level Reed Muller circuits is described which has been named as MRM (Multi-level Reed Muller Minimizer). The synthesis method which uses matrix operations has advantages in effectively minimizing chip area, delay optimization and fault detection capability. However, it uses only truth-table type maps for inputs, synthesizing only small circuits. To overcome the weakness, our method accepts two-level description of a logic function. Since the number of cubes in the two-level description is small, the input matrix becomes small and large circuits can be synthesized. To convert two-level representations into multi-level ones, different input patterns are extracted to make a map which can be fed to the matrix operation procedure. Experimental results show better performance than previous methods. The matrix operation method presented in this paper is new to the society of Reed Muller circuits synthesis and provides solid mathematical foundations.

  • PDF

급성 견봉쇄골관절 탈구에서 변형된 Phemister 술식과 C-C sling 술식의 결과 비교 (The Surgical Treatment of Acute Acromioclavicular Joint Dislocation Using C-C Sling Method and Modified Phemister Operation)

  • 전철홍;심대무;정을오;이종명;이병창;김정우
    • Clinics in Shoulder and Elbow
    • /
    • 제9권1호
    • /
    • pp.60-67
    • /
    • 2006
  • Purpose: The purpose of this study was to compare the method of using coraco-clavicular (C-C) sling with modified Phemister operation by postoperative clinical results, radiologic analysis and complications. Materials and Methods: 33 patients of acromioclavicular joint dislocation were included in this study. Thirteen patients were treated with simple C-C sling method and twenty patients were treated with modified Phemister operation. The assesment of clinical and radiological evaluation were performed and the final results were examined by using the Weitzman's classification. Results: In the final result of C-C sling method group, forward elevation $161^{\circ}$, external rotation $70^{\circ}$, internal rotation T8 level, Visual Analogue Scale (VAS) 83.3 points were checked. In modified Phemister operation group, forward elevation $155^{\circ}$, external rotation $67^{\circ}$, internal rotation T6 level, VAS 83.8 points were checked. In coracoclavicular distance of C-C sling method group, pre-operation 12.82 mm and last follow up 8.37 mm were checked. In modified Phemister operation group, pre-operation 12.8 mm and last follow up 7.7 mm were checked. In functional evaluation by the Weitzman criteria, C-C sling group had excellent 8, good 1, fair 1 and modified Phemister group had excellent 13, good 4, fair 3. Conclusion: C-C sling method would be the better than the Modified Phemister operation because of short operation time and smaller skin incision.

수위계 표준시험장치 개발 및 최고측정능력에 관한 연구 (Best Measurement Capability and Standard Test Facility for the Water-level Gauges)

  • 신강욱;홍성택
    • 제어로봇시스템학회논문지
    • /
    • 제13권10호
    • /
    • pp.1012-1017
    • /
    • 2007
  • Rain data and water-level data are importantly used for dam operation at flood period. Because dams are directly controlled by the water-level data, the characteristic of the water-level gauges is necessary to be managed. Thus, we developed the standard test facility and method for testing the water-level gauges which are a float type, a supersonic type and a radar type. And we calculated the uncertainty of the standard test facility to maintain the accuracy of water-level gauges. Through development of this facility, we could obtain the characteristics and the calibration factor of the water-level gauges. And, this study showed that the standard test facility can be widely used for dam operation and basin management.

3레벨 인버터로 구동되는 유도전동기 직접토크제어의 저속성능 개선 (An Improvement on low Speed Operation Performances of DTC for 3-level Inverter-fed Induction Motors)

  • 이교범;송중호;최익;김광배;유지윤
    • 대한전기학회논문지:전기기기및에너지변환시스템부문B
    • /
    • 제49권10호
    • /
    • pp.693-700
    • /
    • 2000
  • A direct torque control algorithm for 3-level inverter-fed induction motors is presented. Conventional voltage selection methods provoke some problems such as stator flux drooping phenomenon and undersirable torque control appeared especially at the low speed operation. To overcome these problems, a proposed method uses intermediate voltage vectors, which are inherently generated in 3-level inverters. In the proposed algorithm, both subdivision of the basic switching sectors and applications of tntermediated voltages improve the low speed operation characteristics. This algorithm basically considers applications in which direct torque controlled induction motors are fed by 3-level inverters with low switching frequency around 500Hz. An adaptive observer is also employed to bring better responses at the low speed operation, by estimating some state-variables, motor speed and motor parameters which take a deep effect on the performance of the low speed operation. Simulation and experiment results verify effectiveness of the proposed algorithm.

  • PDF

새로운 단상 3전위 인버터회로의 구성에 관한 연구 (A Study on Composition of A Novel Single Phase 3 Level Inverter Circuit)

  • 이종수;백종현
    • 한국조명전기설비학회지:조명전기설비
    • /
    • 제9권5호
    • /
    • pp.51-56
    • /
    • 1995
  • The transistors of single phase 3 level PWM Inverter compose output power transistors and neutral point clamping transistors, which are NPN transistors. Waveforms of driving signals for this are PWM waves for power transistors and period operating waves for neutral point clamping transistors, which signals made W-type modulation from rectangular and sine wave. The output power transistors operate at ON-time complementary and neutral point clamping transistors operate at OFF-time complementary respectively. Therefore, each transistors operate in half period at parallel. Characteristics of this inverter circuit is parallel switching method about series switching method of general inverter. As modulation of 3 level drive signals made from full-wave rectifier of sine wave and rectangular wave, which are level wave about 3 level of complementary transistor inverter. So, this circuit composed complementary operation inverter of NPN transistors only compare with PNP-NPN complementary inverter, which have high power 3 level inverter of complementary operation.

  • PDF

Simple Space Vector PWM Scheme for 3-level NPC Inverters Including the Overmodulation Region

  • Lee, Dong-Myung;Jung, Jin-Woo;Kwa, Sang-Shin
    • Journal of Power Electronics
    • /
    • 제11권5호
    • /
    • pp.688-696
    • /
    • 2011
  • This paper proposes a simple space vector PWM (SVPWM) scheme including overmodulation operation for 3-level NPC (Neutral Point Clamped) Inverters. The proposed scheme features a simple decision and calculation procedure for determining switching times in the overmodulation range by utilizing the duty calculation method used in 2-level inverters and the minimum phase error projection method widely employed in motor drive systems. The proposed scheme does not need to detect the angle of the reference vector or calculate trigonometric functions to determine the magnitude of the voltage vector. The magnitude of the angle of the new reference voltage vector is decided in advance with the help of the Fourier Series Expansion to extend the linearity of the output voltage of 3-level inverters in the overmodulation region. Experimental results demonstrate the validity of the proposed SVPWM scheme including overmodulation operation for 3-level NPC inverters.

옵티컬 플로우를 이용한 논리연산 트래킹과 그레디언트 연산속도 개선 (Logical operation tracking using optical flow and improvement of gradient operation speed)

  • 안태홍;정상화;박종안
    • 한국통신학회논문지
    • /
    • 제23권4호
    • /
    • pp.787-795
    • /
    • 1998
  • 본 논문에서는 이동물체의 움직임 추정을 위한 옵티컬 플로우(Optical Flow: OF)의 계산에 필요한 그레디언트(Gradient)의 연산 속도를 개선하고. OF와 에지의 논리연산에 의하여 이동물체의 움직임 정계를 추정할 수 있으며 잡음이 있는 영상에서도 이동물체를 추정할 수 있는 방법을 제안한다. 이것은 저레벨에서 OF와 에지를 논리 연산하므로써 불확실한 배경에서 이동물체를 식별하고 물체를 추적하는 방법으로 기존의 이동물체 추정 알고리즘을 간소화시킨 것이다. 또한, 그레디언트 연산속도를 개선한 본 논문의 방법 I과 방법 II를 이용하여 그레이레 벨값의 변화가 있는 영상에 대하여 시뮬레이션을 행하였다. 그레디언트 연산에 걸리는 전체적인 시간을 평균한 결과 방법 I 은 기존의 방법보다 12% 연산속도가 개선되었고, 방법 II는 37% 연산속도가 개선되었다.

  • PDF

3 레벨 인버터로 구동되는 유도전동기 직접 토크제어의 저속운전 성능 개선 (AN OBSERVER-BASED DTC OF INDUCTION MOTORS DRIVEN BY 3-LEVEL INVERTER FOR IMPROVING LOW SPEED OPERATION)

  • 박영민;최세경;이세현;이교범;유지윤;송중호;최익
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2000년도 하계학술대회 논문집 B
    • /
    • pp.1030-1032
    • /
    • 2000
  • Direct torque control algorithm for 3-level inverter-fed induction motors is proposed. Conventional selection method of the stator voltage vector shows problems of stator flux drooping phenomenon and undesirable torque control appeared especially at the low, speed operation. To overcome these problems, a proposed method uses intermediate voltage vectors, which are inherently generated in 3-level inverters. An adaptive observer is also employed to estimate some state-variables and motor parameters, which takes a deep effect on the performance of the low speed operation. Simulation and experiment results verify effectiveness of the proposed algorithm.

  • PDF