• Title/Summary/Keyword: large-scale construction projects

Search Result 191, Processing Time 0.024 seconds

The Analysis on the Impact Factors of Delivery Method for Multi-Family Housing Projects (공동주택 건설공사의 발주방식 영향요인 분석)

  • Moon, Hyun-Seok;Hong, Tae-Hoon;Koo, Gyo-Jin;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.75-84
    • /
    • 2008
  • Recently, construction industry demands have been changed by domestic construction circumstances such as high-technology, mega-projects, and the complexity of construction. In order to deal with the change of such a domestic construction circumstances, the Ministry of Construction and Transportation (MOCT) has introduced advanced delivery methods. However, the advantages and disadvantages of the advanced delivery methods have not been effectively applied for previous projects. The reason for this is that the "Reviewing Standard for the Large-scale Construction Bidding Method" has not reflected enough prcject characteristics when the delivery method is selected in the project planning phase. Therefore, this paper proposes the Analysis on the Impact Factors of Delivery Method for Multi-Family Housing Projects.

BIM-BASED TIME SERIES COST MODEL FOR BUILDING PROJECTS: FOCUSING ON MATERIAL PRICES

  • Sungjoo Hwang;Moonseo Park;Hyun-Soo Lee;Hyunsoo Kim
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.1-6
    • /
    • 2011
  • As large-scale building projects have recently increased for the residential, commercial and office facilities, construction costs for these projects have become a matter of great concern, due to their significant construction cost implications, as well as unpredictable market conditions and fluctuations in the rate of inflation during the projects' long-term construction periods. In particular, recent volatile fluctuations of construction material prices fueled such problems as cost forecasting. This research develops a time series model using the Box-Jenkins approach and material price time series data in Korea in order to forecast trends in the unit prices of required materials. Building information modeling (BIM) approaches are also used to analyze injection times of construction resources and to conduct quantity take-off so that total material prices can be forecast. To determine an optimal time series model for forecasting price trends, comparative analysis of predictability of tentative autoregressive integrated moving average (ARIMA) models is conducted. The proposed BIM-based time series forecasting model can help to deal with sudden changes in economic conditions by estimating material prices that correspond to resource injection times.

  • PDF

AR-based 3D Digital Map Visualization Support Technology for Field Application of Smart Construction Technology

  • Song, Jinwoo;Hong, Jungtaek;Kwon, Soonwook
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1255-1255
    • /
    • 2022
  • Recently, research on digital twins to generate digital information and manage construction in real-time using advanced technology is being conducted actively. However, in the construction industry, it is difficult to optimize and apply digital technology in real-time due to the nature of the construction industry in which information is constantly fluctuating. In addition, inaccurate information on the topography of construction projects is a major challenge for earthmoving processes. In order to ultimately improve the cost-effectiveness of construction projects, both construction quality and productivity should be addressed through efficient construction information management in large-scale earthworks projects. Therefore, in this study, a 3D digital map-based AR site management work support system for higher efficiency and accuracy of site management was proposed by using unmanned aerial vehicles (UAV) in wide earthworks construction sites to generate point cloud data, building a 3D digital map through acquisition and analysis of on-site sensor-based information, and performing the visualization with AR at the site By utilizing the 3D digital map-based AR site management work support system proposed in this study, information is able to be provided quickly to field managers to enable an intuitive understanding of field conditions and immediate work processing, thereby reducing field management sluggishness and limitations of traditional information exchange systems. It is expected to contribute to the improvement of productivity by overcoming factors that decrease productivity in the construction industry and the improvement of work efficiency at construction sites.

  • PDF

Subcontractor Evaluation Model for construction Industry Using AHP (AHP 기법을 응용한 건설업 협력업체 평가모형 개발에 관한 연구)

  • 김성수;이영훈
    • Korean Management Science Review
    • /
    • v.17 no.2
    • /
    • pp.135-150
    • /
    • 2000
  • Korean construction companies are recently facing stiff competition in free market economy, and construction projects tend to be complex and large-scale. Such an environment demands that construction companies ensure specialized subcontractors. This paper suggested a subcontractor evaluation model for selection of competent subcontractors which are equipped with operational, technical and productive ability. For designing a subcontractor model, AHP method as a group decision-marking method is applied in assigning weighting indices of evaluation elements. To verify this method, actual data collected in one of construction companies are analysed statistically.

  • PDF

MODEL FOR ORGANIZATIONAL STRATEGY IN INTERNATIONAL CONSTRUCTION JOINT VENTURES: ORGANIZATIONAL ECONOMICS PERSPECTIVE

  • Yi-Hsin Lin;S. Ping Ho
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.768-773
    • /
    • 2005
  • Among various joint ventures, International Construction Joint Ventures (ICJVs) have emerged as a popular approach worldwide to developing large scale projects through international participation. A model, based on economic analysis and represented by several hypotheses obtained from the analysis, will be developed. Furthermore, we will empirically test the hypotheses/model using Structural Equation Model (SEM). This research is expected to explain why there exist different organizational forms for ICJVs, and to develop a framework for choosing appropriate forms with respect to various characteristics of ICJVs.

  • PDF

An Analysis of Factors Affecting the Safety of Tower Crane in Construction Site (건설현장 타워크레인의 안전성에 영향을 미치는 요인 분석)

  • Ahn, Sungjin;Kim, Tae-Hui;Kim, Ji-Myong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.44-45
    • /
    • 2019
  • Tower cranes are essential equipments that play a key role in the overall process of large-scale construction projects, as well as high-rise apartments construction projects. Tower cranes hoist various loads near and over people, working in crowded environments, sometimes in overlapping work areas, and often under the constraints of time, budget, and labor. This work system further increases the safety risks of sites with inherently hazardous workplaces. The methodology of this research was based on a comprehensive inquiry of a team of experts, including safety managers and equipment managers of major construction companies and previous literature search. Due to the limited resources available to improve safety and prevent accidents, more attention should be paid to all parties involved in factors that have been evaluated to have a significant impact on site safety due to tower crane operations.

  • PDF

Global Collaboration During Front End Planning of Capital Projects

  • Gibson, G. Edward Jr.
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.15-18
    • /
    • 2015
  • Front end planning is arguably the most impactful process in the successful delivery of capital projects. Organizations expend substantial effort in this planning process, intending to minimize risk and promote project success. This process has been well documented, including critical technical components, as well as the importance of team collaborative components. As organizations continue to pursue large projects with multi-national participation from sponsors, designers, contractors and suppliers, the importance of collaboration on a global scale during front end planning becomes more important, not less. This paper will outline research performed over the past two decades giving the basic components of the process and the value of global collaboration. It will provide guidance to project participants in pursuing successful planning.

  • PDF

Design and Construction Problems of NATN Tunnel Emerged from Seoul Subway Construction (서울 지하철 건설에서 조명된 NATM 터널의 설계 및 시공상의 문제점)

  • 정명근;박광준
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1993.03a
    • /
    • pp.15-20
    • /
    • 1993
  • NATM becomes one of the major methods of tunnel construction, such as that of subways and highways. However, a number of design and construction problems have been noticed and reported from the recent large-scale tunnelling projects. Some of them are presented and discussed in this report in order to call an attention to these problems and provide a sound basis for the improvement of current problems.

  • PDF

Analyzing the Influential Relationship between PMO and Project Performance in Construction Industry: Focusing on Moderation Effect of PM Leadership (건설산업에서 프로젝트관리오피스(PMO)와 프로젝트성과의 영향관계 분석: PM리더십 조절효과 중심으로)

  • Lee, Heonchang;Park, Sohyun;Kim, Seung-Chul
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.44 no.3
    • /
    • pp.133-145
    • /
    • 2021
  • Recently, the importance of project management has increased due to the scale and complexity of the construction projects. Therefore, this study conducted a survey on construction companies and related public institutions to verify the relationship between the role of the Project Management Office(PMO) and PM leadership for project performance. Based on this, the effect of the PMO role on the project performance was identified and the moderating effect of PM leadership was analyzed. As a result, first, the role of the PMO was found to have an influential on the project performance. Second, the PM leadership was verified to has a moderating effect in the relationship between the PMO role and the project performance. The purpose of this study is to analyze the influential of the role of PMO on project performance in the construction industry to suggest the necessity of PMO in the construction industry and the need to adopt PMO in large-scale construction projects and analyze the moderating effect of PM leadership on project performance.

A Study on Introduction of Virtual Construction into Urban Planning (도시계획단계에서의 가상건설 적용에 관한 기초연구)

  • Shim, Jin-Kyu;Yi, Hye-In;Kim, Joo-Hyung;Kim, Jae-Jun
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2007.04a
    • /
    • pp.170-175
    • /
    • 2007
  • Recently, construction industry in Korea is considering of various approaches for improving productivity and thus enhancing the competitive capacity in the global market. To this end, Korean Ministry of Construction & Transportation has launched R&D project in the field of automation, information systems, high value-added techniques. Furthermore, a new era of cities such as U-city and Eco-city is coming due to the government strategy for developing the country. In the regards of methodological development and trends of construction projects stated above, conventional methods for managing the projects is not likely to guarantee the success. Especially, in the planning and maintenance phases of such large scale cities, a new paradigm should be introduced. We thought of it as 3D object based simulation system for city planning. This paper describes the concept of the system.

  • PDF