• Title/Summary/Keyword: large-scale construction projects

Search Result 191, Processing Time 0.027 seconds

Groundwater control measures for deep urban tunnels (도심지 대심도 터널의 지하수 변동 영향 제어 방안)

  • Jeong, Jae-Ho;Kim, Kang-Hyun;Song, Myung-Kyu;Shin, Jong-Ho
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.23 no.6
    • /
    • pp.403-421
    • /
    • 2021
  • Most of the urban tunnels in Korea, which are represented by the 1st to 3rd subways, use the drainage tunnel by NATM. Recently, when a construction project that actively utilizes large-scale urban space is promoted, negative effects that do not conform to the existing empirical rules of urban tunnels may occur. In particular, there is a high possibility that groundwater fluctuations and hydrodynamic behavior will occur owing to the practice of tunnel technology in Korea, which has mainly applied the drainage tunnel. In order to solve the problem of the drainage tunnel, attempts are being made to control groundwater fluctuations. For this, the establishment of tunnel groundwater management standard concept and the analysis of the tunnel hydraulic behavior were performed. To prevent the problem of groundwater fluctuations caused by the construction of large-scale tunnels in urban areas, it was suggested that the conceptual transformation of the empirical technical practice, which is applied only in the underground safety impact assessment stage, to the direction of controlling the inflow in the tunnel, is required. And the relationship between the groundwater level and the inflow of the tunnel required for setting the allowable inflow when planning the tunnel was derived. The introduction of a tunnel groundwater management concept is expected to help solve problems such as groundwater fluctuations, ground settlement, depletion of groundwater resources, and decline of maintenance performance in various urban deep tunnel construction projects to be promoted in the future.

Bankruptcy Forecasting Model using AdaBoost: A Focus on Construction Companies (적응형 부스팅을 이용한 파산 예측 모형: 건설업을 중심으로)

  • Heo, Junyoung;Yang, Jin Yong
    • Journal of Intelligence and Information Systems
    • /
    • v.20 no.1
    • /
    • pp.35-48
    • /
    • 2014
  • According to the 2013 construction market outlook report, the liquidation of construction companies is expected to continue due to the ongoing residential construction recession. Bankruptcies of construction companies have a greater social impact compared to other industries. However, due to the different nature of the capital structure and debt-to-equity ratio, it is more difficult to forecast construction companies' bankruptcies than that of companies in other industries. The construction industry operates on greater leverage, with high debt-to-equity ratios, and project cash flow focused on the second half. The economic cycle greatly influences construction companies. Therefore, downturns tend to rapidly increase the bankruptcy rates of construction companies. High leverage, coupled with increased bankruptcy rates, could lead to greater burdens on banks providing loans to construction companies. Nevertheless, the bankruptcy prediction model concentrated mainly on financial institutions, with rare construction-specific studies. The bankruptcy prediction model based on corporate finance data has been studied for some time in various ways. However, the model is intended for all companies in general, and it may not be appropriate for forecasting bankruptcies of construction companies, who typically have high liquidity risks. The construction industry is capital-intensive, operates on long timelines with large-scale investment projects, and has comparatively longer payback periods than in other industries. With its unique capital structure, it can be difficult to apply a model used to judge the financial risk of companies in general to those in the construction industry. Diverse studies of bankruptcy forecasting models based on a company's financial statements have been conducted for many years. The subjects of the model, however, were general firms, and the models may not be proper for accurately forecasting companies with disproportionately large liquidity risks, such as construction companies. The construction industry is capital-intensive, requiring significant investments in long-term projects, therefore to realize returns from the investment. The unique capital structure means that the same criteria used for other industries cannot be applied to effectively evaluate financial risk for construction firms. Altman Z-score was first published in 1968, and is commonly used as a bankruptcy forecasting model. It forecasts the likelihood of a company going bankrupt by using a simple formula, classifying the results into three categories, and evaluating the corporate status as dangerous, moderate, or safe. When a company falls into the "dangerous" category, it has a high likelihood of bankruptcy within two years, while those in the "safe" category have a low likelihood of bankruptcy. For companies in the "moderate" category, it is difficult to forecast the risk. Many of the construction firm cases in this study fell in the "moderate" category, which made it difficult to forecast their risk. Along with the development of machine learning using computers, recent studies of corporate bankruptcy forecasting have used this technology. Pattern recognition, a representative application area in machine learning, is applied to forecasting corporate bankruptcy, with patterns analyzed based on a company's financial information, and then judged as to whether the pattern belongs to the bankruptcy risk group or the safe group. The representative machine learning models previously used in bankruptcy forecasting are Artificial Neural Networks, Adaptive Boosting (AdaBoost) and, the Support Vector Machine (SVM). There are also many hybrid studies combining these models. Existing studies using the traditional Z-Score technique or bankruptcy prediction using machine learning focus on companies in non-specific industries. Therefore, the industry-specific characteristics of companies are not considered. In this paper, we confirm that adaptive boosting (AdaBoost) is the most appropriate forecasting model for construction companies by based on company size. We classified construction companies into three groups - large, medium, and small based on the company's capital. We analyzed the predictive ability of AdaBoost for each group of companies. The experimental results showed that AdaBoost has more predictive ability than the other models, especially for the group of large companies with capital of more than 50 billion won.

Analysis of Industrial Linkage Effects for Farm Land Base Development Project -With respect to the Hwangrak Benefited Area with Reservoir - (농업생산기반 정비사업의 산업연관효과분석 -황락 저수지지구를 중심으로-)

  • Lim, Jae Hwan;Han, Seok Ho
    • Korean Journal of Agricultural Science
    • /
    • v.26 no.2
    • /
    • pp.77-93
    • /
    • 1999
  • This study is aiming at identifying the foreward and backward lingkage effects of the farm land base development project. Korean Government has continuously carried out farmland base development projets including the integrated agricultural development projects. large and medium scale irrigation projects and the comprehensive development of the four big river basin including tidal land reclamation and estuary dam construction for the all weather farming since 1962. the starting year of the five year economic development plans. Consequently the irrigation rate of paddy fields in Korea reached to 75% in 1998 and to escalate the irrigation rate, the Government had procured heavy investment fund from IBRD. IMF and OECF etc. To cope with the agricultural problems like trade liberalization in accordance with WTO policy, the government has tried to solve such problems as new farmland base development policy, preservation of the farmland and expansion of farmland to meet self-sufficiency of foods in the future. Especially, farmland base development projects have been challanged to environmental and ecological problems in evaluating economic benefits and costs where the value of non-market goods have not been included in those. Up to data, in evaluating benefits and costs of the projects, farmland base development projects have been confined to direct incremental value of farm products and it's related costs. Therefore the projects'efficiency as a decision making criteria has shown the low level of economic efficiencies. In estimating economic efficiencies including Leontiefs input-output analysis of the projects could not be founded in Korea at present. Accordingly this study is aimed at achieving and identifying the following objectives. (1) To identify the problems related to the financial supports of the Government in implementing the proposed projects. (2) To estimated backward and foreward linkage effects of the proposed project from the view point of national economy as a whole. To achieve the objectives, Hwangrak benefited area with reservoir which is located in Seosan-haemi Disticts, Chungnam Province were selected as a case study. The main results of the study are summarized as follows : a. The present value of investment and O & M cost were amounted to 3,510million won and the present value of the value added in related industries was estimated at 5.913million won for the period of economic life of 70 years. b. The total discounted value of farm products in the concerned industries derived by the project was estimated at 10,495million won and the foreward and backward linkage effects of the project were amounted to 6,760 and 5,126million won respectively. c. The total number of employment opportunities derived from the related industries for the period of project life were 3,136 man/year. d. Farmland base development projects were showed that the backward linkage effects estimated by index of the sensitivity dispersion were larger than the forward linkage effect estimated by index of the power of dispersion. On the other hand, the forward linkage effect of rice production value during project life was larger than the backward linkage effect e. The rate of creation of new job opportunity by means of implementing civil engineering works were shown high in itself rather than any other fields. and the linkage effects of production of the project investment were mainly derived from the metal and non-metal fields. f. According to the industrial linkage effect analysis, farmland base development projects were identified economically feasible from the view point of national economy as a whole even though the economic efficiencies of the project was outstandingly decreased owing to delaying construction period and increasing project costs.

  • PDF

A New Implementation Strategy and Conceptual System Architecture for the Seoul Metropolitan Government's GIS (서울시 지리정보시스템(GIS) 구축의 기본방향과 시스템구조)

  • 박수홍
    • Spatial Information Research
    • /
    • v.7 no.2
    • /
    • pp.237-253
    • /
    • 1999
  • Seoul metropolitan government has produced fundamental digital map products and developed various GIS applications for years according to the GIS implementation plan established in 1995. However, the city's recent organization restructuring and prioritized large scale database construction projects for unemployed workers have changed the original GIS implementation schedule. The information strategy plan for the Seoul metropolitan government that represents development and use of common organization -wide database and seeks for providing high quality information services for citizens also require reestablishing the city's GIS implementation strategy. This paper discusses a new implementation strategy and suggests conceptual system architecture for the Seoul metropolitan government's GIS in order to implement a comprehensive urban information system(UIS) based on contemporary GIS technologies.

  • PDF

A Study on Sustainable Design Characteristics of the UK Social Housing (영국 소셜하우징의 지속가능한 디자인 특성에 대한 연구)

  • Bae, Jiyoon;Lee, Kyung-Sun;Kim, Woojong
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.34 no.10
    • /
    • pp.95-106
    • /
    • 2018
  • Currently, the way of providing housing in Korea has been regarded as public rental housing through large-scale development by the government. However, there is an increasing need for qualitative growth not only in quantitative growth but also in policies, systems, and sustainable design. The purpose of this study is to explore the applicable methods for domestic social housing through the policy and design guideline study of UK social housing which has achieved qualitative growth through diversification of development subject. First, the concept of social housing in the UK and sustainable housing design elements will be examined. Second, the characteristics and policy direction, project background, management and sustainability of five social housing projects over the last 10 years in the UK will be analyzed. In conclusion, in order to achieve the sustainable design of social housing, the construction of the social housing in terms of policy and environment must include safe and eco-friendly design adaptability that can secure local identity and respond flexibly to social change. In addition, the social housing in the UK, which forms a sustainable complex through cooperation between the public and the private sector based on its place and history, can be a guideline for establishing policies and design guidelines in terms of urban regeneration.

Time Reduction Effect Analysis of SMART Frame for Long Span and Heavy Loaded Logistics Buildings (SMART 프레임의 공기단축 효과 분석 - 대형 물류창고 사례 -)

  • Kim, Doyeong;Ji, Woomin;Lim, Jeeyoung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.5
    • /
    • pp.519-530
    • /
    • 2022
  • As online commerce increases, the construction of large logistics buildings worldwide is exploding. Most of these buildings have the characteristics of long span and heavy loaded and use precast concrete components, a pin joint structure, for rapid construction. However, due to construction safety and structural stability requirements, the pin joint structure has many limitations in terms of the erection of the PC member, which increases the time and cost. A structural frame connected with steel joints between precast concrete components, called a SMART frame, has been developed, which addresses these constraints and risks. However, the effect of the appllication of a SMART frame on the time aspect has not been analysed. The study is a time reduction effect analysis of a SMART frame for long span and heavy loaded logistics buildings. For this study, the authors select a case site erected using existing PC components, and compare the time reduction with the SMART frame erection simulations. Through this analysis, it was found that a time reduciton about 4 months, approximately 48% of the conventional PC installation period could be achieved. If the SMART frame is applied when carrying out future large-scale logistics building projects, it can be expected to have the effect of significantly shortening the construction period compared to the conventional method.

A Critical Analysis on Korea's Tidelands Policy : From a Sustainable Development Point of View (한국의 갯벌정책에 대한 비판적 소고: 지속가능한 발전의 관점에서)

  • Moon, Seogwoong
    • Environmental and Resource Economics Review
    • /
    • v.16 no.3
    • /
    • pp.575-605
    • /
    • 2007
  • Korea's tidelands policy IS examined and criticized in the paper. Korea's major tidelands in the west coast might disappear within a decade. The anachronistic development IS driven by the political interest group, forming coalition for reclamation and busily fulfilling its own profits under the facade of public good and regional development. But all regions of the world have been gradually scrapping the massive reclamation projects since the 1970's and active movements to reverse the reclamation and restore the nature are on the rise. In 1978, the U.S. Supreme Court decided to suspend the construction of the dam and to protect the snail darter despite that over 100 million dollars had been injected. This court ruling became famous and caused the American public to change their perception about the environment. In the Netherlands, following a prolonged discussion on pros and cons of reclamation, open type seawall was adopted to strike a balance among the available alternatives. Japan's Ministry of Environment was praised for forming the National Wetland Committee in order to designate 20 new Ramsar sites by 2008, with an objective to reach 33 designated Ramsar sites. Away from the large-scale reclamation projects, Korea has to move towards smaller-scale projects focusing on the knowledege intensive and circular economy society that are more in harmony with the environment.

  • PDF

Analyzing the Competence of Construction Engineers in Apartment Construction (아파트 공사에서의 건설기술자 역량 분석 연구 - 공무업무를 중심으로 -)

  • Kim, Hu Yong;Kim, Yea Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.6
    • /
    • pp.14-23
    • /
    • 2018
  • In the domestic construction industry, large-scale housing construction projects are being carried out by construction companies with competitiveness in the domestic top 10, it is said that the competence of the construction engineer is a factor for the success of the project. In Korea, there is National Competency Standards (NCS) that systematize contents of knowledge, technology, and attitude required in order to perform job in industrial field as the importance of individual ability is systemized in the country. Therefore, in this study, defined the detail competence in construction administration works, and examined the level of competence and degree of impotance detailed competency of construction engineers using AHP analysis & ANOVA. As a result, it was found that the current capacity of the Engineers in the apartment construction work is insufficient compared to the level of the competence they think they have, and that they have different competencies depending on their work experience and job position. This means that if the career is accumulated, the capacity that is possessed naturally will be changed. Therefore, it will be necessary to improve the capacity of the construction engineers who have a short work experience and a low job level.

Application Method of Phase Division of Fast Track for Construction Project with Complex Structures (복합공종으로 구성된 건설공사의 패스트트랙 단계구분 적용 방식 분석)

  • Kim, Hyun Soo;Hwang, Jae Yoeng;Kang, Hyo Jeong;Park, Sang Mi;Lee, Jae Hee;Kang, Leen Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.1
    • /
    • pp.95-105
    • /
    • 2022
  • Recently, as the scale of a construction project has become larger and more complicated, there are many cases where construction projects with complex structures are carried out in a fast track method to save construction duration. In the fast track method, the proper division of construction phases is an important issue in determining the overall project period. This study presents a rational phase division method that can be applied when a construction project with complex structures is carried out as a fast track. For this study, a subdivided work breakdown structure (WBS) is developed using the construction of 4 soccer stadiums as application examples, and the schedule is analyzed by dividing the construction process of major phases. To this end, five proposals are applied to analyze the adequacy of the fast track phase division. For the draft with the minimum construction period, the fast track phase division and the schedule model of by each phase were presented. This methodology can have an application in the appropriate phase division and schedule model by construction phase when fast track is applied in large construction project of a similar size.

Suggestion for Technology Development and Commercialization Strategy of CO2 Capture and Storage in Korea (한국 이산화탄소 포집 및 저장 기술개발 및 상용화 추진 전략 제안)

  • Kwon, Yi Kyun;Shinn, Young Jae
    • Economic and Environmental Geology
    • /
    • v.51 no.4
    • /
    • pp.381-392
    • /
    • 2018
  • This study examines strategies and implementation plans for commercializing $CO_2$ capture and storage, which is an effective method to achieve the national goal of reducing greenhouse gas. In order to secure cost-efficient business model of $CO_2$ capture and storage, we propose four key strategies, including 1) urgent need to select a large-scale storage site and to estimate realistic storage capacity, 2) minimization of source-to-sink distance, 3) cost-effectiveness through technology innovation, and 4) policy implementation to secure public interest and to encourage private sector participation. Based on these strategies, the implementation plans must be designed for enabling $CO_2$ capture and storage to be commercialized until 2030. It is desirable to make those plans in which large-scale demonstration and subsequent commercial projects share a single storage site. In addition, the plans must be able to deliver step-wised targets and assessment processes to decide if the project will move to the next stage or not. The main target of stage 1 (2019 ~ 2021) is that the large-scale storage site will be selected and post-combustion capture technology will be upgraded and commercialized. The site selection, which is prerequisite to forward to the next stage, will be made through exploratory drilling and investigation for candidate sites. The commercial-scale applicability of the capture technology must be ensured at this stage. Stage 2 (2022 ~ 2025) aims design and construction of facility and infrastructure for successful large-scale demonstration (million tons of $CO_2$ per year), i.e., large-scale $CO_2$ capture, transportation, and storage. Based on the achievement of the demonstration project and the maturity of carbon market at the end of stage 2, it is necessary to decide whether to enter commercialization of $CO_2$ capture and storage. If the commercialization project is decided, it will be possible to capture and storage 4 million tons of $CO_2$ per year by the private sector in stage 3 (2026 ~ 2030). The existing facility, infrastructure, and capture plant will be upgraded and supplemented, which allows the commercialization project to be cost-effective.