The purpose of this study is to establish PM-10 management manual for developing large scale sites by assessing the status of PM-10 reduction at ongoing large scale development sites. After analyzing the meteorological conditions and air quality characteristics of Sihwa MTV development site, ISCST3 (Industrial Source Complex Short Term Model 3) was implemented to predict PM-10 generation. The outcomes of ISCST3 modelling were utilized for verification of site survey data. As a result of applying air pollution modeling, the diffusion rate of PM-10 decreases according as the wind speed decreases. And the emission rate of PM-10 increase is linear to the concentration of PM-10. The reduction target of PM-10 can be derived quantitatively from the difference between the forecasted emission rate and the permissible emission limit of PM-10. The assessment of PM-10 characteristics which is deduced from ISCST3 and site survey can be practically applied to accomplish environmentally acceptable air quality manual for large scale development sites.
With reducing coal mining industry the number of coal mine sites between 1988 and 1998 was dropped from 347 to 12. Since the abandoned coal mine sites have been kept without any cares, they have raised various environmental and safety problems. Then, Korean government initiated a special law in 1995 for enhancing economic conditions and solving environmental problems with promoting developmental projects in the abandoned mining sites. As a result, casino business in Chungsun area has been opened to publics, and other large-scale developments such as ski slopes and resorts are planned. In addition, Boryung area in Chungchung province also will launch a large-scale project building golf courses. Based on this developmental trend, it is expected that lots of large-scale developments in other places will be taken place. In general, the large-scale developments have caused various environmental problems, and, thus, environmental aspects should be considered in a decision-making process. This paper examine the status of the abandoned mine sites in Korea and U.S. and suggests the alternatives of its utilization.
Assessment in Socio-economic items should be used to estimate social influence when policies and projects were introduced. To estimate current situation of socio-economic items 19 Environmental Impact Statement (EIS) of large scale projects were analyzed. The projects were selected based on magnitude of social impact when the projects were implemented. Environmental Impact Statement was categorized into line projects(road construction, railroad construction, stream development, etc), and surface projects(energy development, wetland reclamation, recreation and sport development, and housing and residential development, etc) thus being chosen for 19 projects in each categories. This report was based on the analysis of 7 items in socio-economic environmental items(i.e., population, residents, industry, public facilities, education, transport and historical monument). Most EIS did not follow the regulation suggested by Ministry of Environment, and only current circumstances were briefly described. Indifference of in-depth analysis of socioeconomic environmental items would influence the process of social and environment impact negatively in the midst of construction of National Projects such as Outer Circle Seoul Highways, Saemankeum Reclamation Projects, etc. This abrupt halt of construction was mostly based on a lack of public hearing or public participation. Socio-economic items are also very much lacking in quantitative method and strengthening socio-economic environmental items is needed via checklist or matrix that brings decision-makers better ideas objectively.
In these days, as the scale of our technology becomes larger and more highly advanced, the magnitude of an accident tends to be large. For this reason, in some systems whose accident may cause a large-scale and long-term catastrophe, a preliminary and quantitative safety assessment has become required before its construction. A method developed for this requirement is risk assessment. In this study, we focused on the methodology of probabilistic risk assessment, which has been developed mainly in the field of nuclear power industry, and considered the process to adopt this method to railway system in order to establish a scientific and comprehensive way of safety assessment.
Journal of Wellbeing Management and Applied Psychology
/
v.6
no.2
/
pp.39-46
/
2023
Purpose: The small-scale environmental impact assessment system in Korea was introduced and implemented in August 2000, but it has a problem that it cannot guarantee implementation due to the large proportion of qualitative reduction measures for each evaluation item. Therefore, when preparing a small-scale environmental impact assessment, research was conducted on how to improve the existing simple listing-type reduction measures and qualitative evaluation standards to quantitative reduction measures and evaluation standards reflecting regional characteristics. Research design, data and methodology: The small-scale environmental impact assessment system in Korea was introduced and implemented in August 2000, but it has a problem that it cannot guarantee implementation due to the large proportion of qualitative reduction measures for each evaluation item. Therefore, when preparing a small-scale environmental impact assessment, research was conducted on how to improve the existing simple listing-type reduction measures and qualitative evaluation standards to quantitative reduction measures and evaluation standards reflecting regional characteristics. Results: As a result of the analysis of qualitative and quantitative factors, the arithmetic sum of the qualitative factors of the total six projects is 160, accounting for 80% of the total number of reduction measures, and the quantitative factors are 40, accounting for 20%. Among them, the number of qualitative reduction measures reached 97.4% for animal and plant items, and more than 90% for air quality, noise and vibration, and eco-friendly resource circulation items. Conclusions: Therefore, it is necessary to avoid establishing qualitative reduction measures and set quantitative measures as the basis, but to specify the specifications, size, and installation location related to the reduction measures, and to calculate the numerical reduction efficiency.
The present study aims at theoretically reviewing studies en the need of alignments among assessment, curriculum and instruction in order to implement the goals of mathematics education. This paper discusses about issues and models fer alignment between instruction and curriculum, and then mainly focuses on alignment of assessment with instruction and curriculum at two levels, classroom and large-scale assessment. It was pointed out that both many published standardized tests for large-scale assessment and classroom assessments failed to meet curricular goals and contents, and instructional methods. The findings imply that reform in mathematics education should not be driven by assessment, but be embedded in instructional practices.
The purpose of the study was to construct future research basis for large scale assessment framework by analyzing current domestic and international large scale assessment frameworks. Six frameworks were compared and analyzed. The characteristics of TIMSS, PISA, NAEP, NECAP were described in detail, and three frameworks, Korea, the United States, and International, were compared and analysed.
Among large developmental projects, those of the government and public institutions with the total budget of more than 50billion wons can be executed only when the feasibility of the project has been testified through the procedure of preliminary feasibility study. Multi-purpose dams are public structures that can supply water, produce electricity, and control flood, they belong to large national projects that require legal evaluation procedures such as preliminary feasibility study and environmental impact assessment(EIA). The index that should be considered to be important in dam plan is the migration of residents in submerged district. The importance in the preliminary feasibility study is 4.93 points(98.6 in the scale of 100 at maximum). Among the 12 assessment elements of the policy and economy in the preliminary feasibility study, the element of environment assessment is turned out to be 4.68 points in the assessment importance (93.5 in the scale of 100 at maximum), which is the second in the total ranking and the first in the field of policy, indicating that the element is very important in dam construction planning.
Excavation by TBM can be characterized by a rock-machine interaction during the cutting process on a small scale, but on a large scale the interaction between the rock mass and TBM becomes very significant. For the planning and evaluation of TBM tunnelling it needs to understand rock fracture mechanism by a cutter or cutters on a small scale, and to estimate penetration rate, advance rate and utilization on a large scale. In this study rock chipping mechanism due to cutter-penetration is analysed by numerical simulation, showing that rock chipping is mainly occurred by tensile failure. Also, through the analysis of factors that affect on TBM procedures in various assessment systems, it is determined that the key elements that should be considered in the planning and evaluation of TBM tunnelling are classified into rock properties, the geological structures and properties of rock mass, and the structural and functional specifications of the machine. The user-friendly assessment tool is developed, so that penetration rate, advance rate and TBM utilization are evaluated from various input data. The tool developed in this study can be applied to a practical TBM tunnelling by understanding TBM tunnelling procedures.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.29
no.1
/
pp.47-56
/
2015
Energy consumption in buildings is currently a real problem. That is why both assessment of energy performance and effective energy management including renewable energy system are essential. Thus, this paper focuses on a case study to analyze the energy performance and cooling & heating energy saving of a large scale shopping store in Daejeon city. The reference building is simulated by using TRNSYS dynamic simulation tool to examine its annual energy consumption. For annual energy analysis of building, one year energy consumption is surveyed in the field. The related study is carried out in large scale shopping store to investigate the energy consumption and energy use trend of heating, cooling, hot water, lighting, ventilation, equipments and other. The evaluation of energy performance of the geothermal heat pump system installed in a large scale shopping store is also analyzed by TRNSYS tool. From simulation results, it evaluated that the geothermal heat pump system is effective energy savings method in large scale shopping store.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.