• Title/Summary/Keyword: large slope

Search Result 778, Processing Time 0.026 seconds

Effect of slope with overburden layer on the bearing behavior of large-diameter rock-socketed piles

  • Xing, Haofeng;Zhang, Hao;Liu, Liangliang;Luo, Yong
    • Geomechanics and Engineering
    • /
    • v.24 no.4
    • /
    • pp.389-397
    • /
    • 2021
  • Pile foundation is a typical form of bridge foundation and viaduct, and large-diameter rock-socketed piles are typically adopted in bridges with long span or high piers. To investigate the effect of a mountain slope with a deep overburden layer on the bearing characteristics of large-diameter rock-socketed piles, four centrifuge model tests of single piles on different slopes (0°, 15°, 30° and 45°) were carried out to investigate the effect of slope on the bearing characteristics of piles. In addition, three pile group tests with different slope (0°, 30° and 45°) were also performed to explore the effect of slope on the bearing characteristics of the pile group. The results of the single pile tests indicate that the slope with a deep overburden layer not only accelerates the drag force of the pile with the increasing slope, but also causes the bending moment to move down owing to the increase in the unsymmetrical pressure around the pile. As the slope increases from 0° to 45°, the drag force of the pile is significantly enlarged and the axial force of the pile reduces to beyond 12%. The position of the maximum bending moment of the pile shifts downward, while the magnitude becomes larger. Meanwhile, the slope results in the reduction in the shaft resistance of the pile, and the maximum value at the front side of the pile is 3.98% less than at its rear side at a 45° slope. The load-sharing ratio of the tip resistance of the pile is increased from 5.49% to 12.02%. The results of the pile group tests show that the increase in the slope enhances the uneven distribution of the pile top reaction and yields a larger bending moment and different settlements on the pile cap, which might cause safety issues to bridge structures.

Case Study on the Causes for the Failure of Large Scale Rock Mass Slope Composed of Metasedimentary Rocks (변성퇴적암류로 구성된 대규모 암반사면의 붕괴원인 분석에 관한 사례 연구)

  • Park, Boo-Seong;Jo, Hyun;Cha, Seung-Hun;Lee, Ki-Hwan
    • Tunnel and Underground Space
    • /
    • v.16 no.6 s.65
    • /
    • pp.506-525
    • /
    • 2006
  • For the design of large scale rock slope which has complex formations and geological structures, generally, insufficiency of geotechnical investigations and laboratory tests are the main factors of slope failures doling construction. In such case, remedial measures to stabilize slope should be selected and applied through reliable investigations and analysis considering the geotechnical characteristics. The rock slope of this study, one of the largest cut slopes in Korea with a length of 520.0 m and maximum height of 122.0 m consists of metasedimentary rocks. And a case study on the causes of large-scale rock slope failure was carried out by analysis of landslides history and site investigations during construction. When the slope with the original design slope of 0.7: 1.0 (H:V) was partially constructed, the slope failure was occurred due to the factors such as poor conditions of rocks (weathered zone, coaly shale and fault shear zone), various discontinuities (joints, foliations and faults), severe rain storm and so on. The types of failures were rockfall, circular failure, wedge failure and the combination of these types. So, the design of slope was changed three times to ensure long-term slope stability. This paper is intended to be a useful reference for analyzing and estimating the stability of rock slopes whose site conditions are similar to those of this study site such as geological structures and geotechnical properties.

Geocomat를 활용한 폐기물매립장의 사면안정성 검토

  • 신은철;이성근;이영재
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2001.06a
    • /
    • pp.45-54
    • /
    • 2001
  • In this study, slope stability analysis of LCRS(Leachate Collection Removel System) in waste landfill was peformed by large scale field test. Geocomat is new type of geocomposite product. Gecomat is a sort of Geocomposite product. It is composed of nonwoven geotextiles, woven geotextile, and geonet. Large scale field tests were performed on the slope of different two LCRSsections with static loading condition. One is LCRS section witch consist of GCL, HDPE and Geocomat, another is GCL, HDPE, and woven type geocomposite. The behavior of geosynthetics lined slope was monitored by incorporating instrumentation including vertical soil pressure meter, settlement plate, strain gauges, potential meter, displacement pin.. Based on the field monitoring, the Geocomat LCRS section is less sliding than the conventional geocomposite LCRS section.

  • PDF

A Study on Slope Stability of Corestone (핵석지반의 사면안정성 연구)

  • 이수곤;금동헌
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.11a
    • /
    • pp.551-558
    • /
    • 2000
  • When cut slope is excavated, corestone in cut slope exists 20∼30%. In case of soil and soft rock mixing, people lay out gradient of 1 : 0.5, because of soft rock slope. In a case, slope that exists corestone between soil happens to large landslide. So, As a study performs geological survey, Analysis of slope stability reinforcement measures, etc, A study presents example meaures and analysis on slope stability of corestone.

  • PDF

Phytosocioloical Study on the Two Contrasting Aspects with the South and North Slopes in Mt. Kwanak (冠岳山의 南斜面과 北斜面의 植被의 比較硏究)

  • Kim, Joon Min;Seok Joon Kim
    • The Korean Journal of Ecology
    • /
    • v.8 no.2
    • /
    • pp.81-87
    • /
    • 1985
  • The vegetation on the north and south slopes of Kwanak mountain was assessed and recorded during thesummer of 1976. Recordings were made of 5*5m quadrats placed along the transects running parallel to the slopes. On the north slope, most of large trees such as Alnus sibirica, Sorbus alnifolia, Robinia pseudo-acacia and Pinus rigida make the crown and their mean DBH was conspicuously large, while the vegetation of south slope is dominated by dwarf Juniperus utilis, Pinus densiflora, Weigela florida var. glabra which are considered as a resistant species of dry site. The amount of humus, total nitrogen, soil water content and available phosphorous is higher on the north slope than the south one. However, the soil pH is higher on the south slope. It is assumed that the humus content is a main factor to make difference on the type of vegetation between the north and south slope.

  • PDF

The Behavior of Stabilizing Piles installed in a Large-Scale Cut Slope (대규모 절개사면에 설치된 억지말뚝의 거동)

  • Song, Young-Suk;Hong, Won-Pyo
    • The Journal of Engineering Geology
    • /
    • v.19 no.2
    • /
    • pp.191-203
    • /
    • 2009
  • The effect of stabilizing piles on cut slopes is checked and the behavior of slope soil and piles are observed throughout the year by field measurements on the large-scale cut slopes. First of all, the behavior of the slope soil was measured by inclinometers during slope modification. Landslides occurred in this area due to the soil cutting for slope modification. The horizontal deformations of slope soil are gradually increased and rapidly decreased at depth of sliding surface. As the result of measuring deformation, the depth of sliding surface below the ground surface can be known. Based on the measuring the depth of the sliding surface, some earth retention system including stabilizing piles were designed and constructed in this slope. To check the stability of the reinforced slope using stabilizing piles, an instrumentation system was installed. As the result of instrumentation, the maximum deflection of piles is measured at the pile head. It is noted that the piles deform like deflection on a cantilever beam. The maximum bending stress of piles is measured at the soil layer. The pile above the soil layer is subjected to lateral earth pressure due to driving force of the slope, while pile below soil layer is subjected to subgrade reaction against pile deflection. The deflection of piles is increased during cutting slope in front of piles for the construction of soil nailing. As a result of research, the effect and applicability of stabilizing piles in large-scale cut slopes could be confirmed sufficiently.

A Study on the Stability of SPMT (SPMT의 안정성에 관한 연구)

  • Yoo, Dae-Wam;Jo, Kwan-Jun;Oh, Jin-Seok
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.36 no.2
    • /
    • pp.250-257
    • /
    • 2012
  • Currently, large vessels and structures are manufactured into set of blocks, then assembled on-site. Large scale ships that weigh thousands of tons are built in a short period by making set of large blocks and assembled on a dock or a land. When a transporter encounters a slope during the process of transporting blocks, the heavy goods loaded on the transporter can be tilted. Further, if the vehicle moves down the slope in this state then it can cause an accident of overturn of loaded goods. The research has been taken into account to calculate the center of gravity of the transporter carrying heavy objects on a leveled surface or the three dimensions. In addition, ZMP (Zero Moment Point) is used to calculate the allowable slope degree that objects are predicted to overturn. Through the simulation, the objects' stability is tested when it is climbing the slope.

A Case Study about the Slope Collapse and Reinforcement Method on the Infinite Slope (무한사면에서의 사면붕괴와 보강대책 사례연구)

  • You Byung-Ok;Hong Jung-Pyo;Jun Jong-Hern;Lee Tae-Sun;Min Kyoung-Nam
    • Tunnel and Underground Space
    • /
    • v.16 no.2 s.61
    • /
    • pp.146-155
    • /
    • 2006
  • The target slope of this study, formed during the construction of highway, is the very high infinite slope where sliding began along the discontinuity. Although an attempt was made to stabilize the upper part of the slope by installing the rock anchors, large scale failure was occurred at the lower part if the reinforced area. Afterwards, subsequent failures were observed two times. To investigate the cause of the failure, residual shear strength was measured by performing the direct shear test of rock specimen of the site. The anchor design was based on the pull-out test. Considering the slope surface where the undulation was severe and the variation of strength was very large, buttressing was used to obtain the required anchoring capacity.

A Study on Failed Slope Stability by Localized Torrential Downpour (집중호우로 붕괴된 절토부 사면의 사면안정 처리에 관한 연구)

  • 신희순;배규진;이승호;정용진;심정훈
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2003.03a
    • /
    • pp.137-144
    • /
    • 2003
  • Continuous road improvement is required by situation that need link between cities by special quality that is our country's topography enemy that most of country have consisted to mountain district. According to this, occurrence of large cutting slope is formed necessarily Cutting slope are very weak real condition because of concentrative downpour and can know easily by example of typhoon Rusa. This study did helpful in slope design and carrying out suitable reinforcing method.

  • PDF

A Study on the Failure Cause of Large Scale Rock Slope in Limestone Quarries (석회석 광산에서 발생한 대규모 암반사면의 붕괴원인 분석에 관한 연구)

  • Lee, Sang-Eun;Kim, Hak-Sung;Jang, Yoon-Ho
    • Tunnel and Underground Space
    • /
    • v.24 no.4
    • /
    • pp.255-274
    • /
    • 2014
  • The target of this study is large scale rock slope collapsed by around 7 pm on August, 2012, which is located at ${\bigcirc}{\bigcirc}$ limestone quarries of Gangneung city, Gangwondo. The slope prior to the collapse is formed as the height of about 200 m and the average inclination of $45^{\circ}$. The estimated amount of the collapse is about $1,500,000m^3$ with respect to the slope after the collapse. Geotechnical and field investigations such as boring, geophysical prospecting, surface geological survey, geological lineaments, borehole imaging, metric 3D imaging, experimental and field test, mining work by year, and daily rainfall were performed to find the cause of rock slope failure. Various analyzes using slope mass rating, stereonet projection, limit equilibrium method, continuum and non-continuum model were conducted to check of the stability of the slope. It is expected that the cause of slope failure from the results of various analysis and survey is due to the combined factors such as topography, rainfall, rock type and quality, discontinuities, geo-structural characteristics as the limestone cavity and fault zones, but the failure of slope in case of the analysis without the limestone cavity is not occurred. Safe factor of 0.66 was obtained from continuum analysis of the slope considering the limestone cavity, so the ultimate causes of slope failure is considered to be due to the influence of limestone cavity developed along fault zone.