• Title/Summary/Keyword: lane operation

Search Result 180, Processing Time 0.028 seconds

Determination on Connection Type of Entrance/Exit on Urban Roads (도시부 도로상의 진출입부 접속형태 결정에 관한 연구)

  • Lee, Hyung-Mu;Kwon, Sung-Dae;Oh, Seok-Jin
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.2
    • /
    • pp.219-230
    • /
    • 2023
  • Cities are continued to be highly advanced and metropolitanized. Lands adjacent to road make entry/exit connection increase along with construction of facilities for various purposes. However, in the absence of specific installation standards of entry and exit connection, inappropriate access location, types of access, and operation methods are deteriorating the level of traffic services at existing roads and intersections. Therefore, in order to minimize the traffic impact from entrances connected to minor arterial roads and colletor roads, first, this study re-established the waiting length in the intersection of upstream and downstream and length required for changing lanes and between entrance/exit and connection, considering the road and traffic environment in contact with the entrance. Second, it is suggested that the operation method depending on the connection type and whether to install left turn lane and acceleration and deceleration lane can be determined quantitatively by relation with the service level of nearby intersection after calculating the threshold amount of business site through negative social cost, which is the difference between the installation cost of the left turn lane and the acceleration and deceleration lane according to the type of access to the entrance and exit.

Roundabout Signal Metering Operation Methods by Considering Approach Lane's Degree of Saturation (접근로별 포화도를 고려한 Roundabout Signal Metering 운영방법에 관한 연구)

  • Ahn, Woo-Young;Lee, So-Young
    • International Journal of Highway Engineering
    • /
    • v.15 no.5
    • /
    • pp.217-226
    • /
    • 2013
  • PURPOSES : Under the capacity conditions with balanced approach flows, roundabouts give less delay than existing signalized intersections; however, flows over 450 vehicles/hour/lane with unbalanced approach flow conditions, roundabouts efficiency drops due to the short time difference between the critical gap and the follow-up headway. The purpose of this study is developing a roundabout Signal Metering operation method by considering approach lanes degree of saturation. METHODS : A four-way-approach with one-lane roundabout is selected to compare the Signal Metering performance for the case of 16 different unbalanced flow conditions. Based on these traffic conditions, the performance is evaluated for 64 different cases of Signal Metering combinations by using SIDRA software. A degree of saturation(V/C ratio) sum for two adjoined approaches is used for the performance index of choosing Metered Approach and Controlling Approach. RESULTS : When the V/C ratio sum is 0.29~0.81 and Metered Approach flow is less than Controlling Approach flow, the average delay saving per vehicle is about 7 seconds; however, after this rage the delay saving decreases gradually until the V/C ratio sum reaches around 1.0. The range of V/C ratio sum 0.93~1.09 provides average delay saving per vehicle about 3 seconds. In case of V/C ratio sum is grater than 1.0 and the flows of Metered Approach is grater than Controlling Approach, the average delay per vehicle increases 3~11 times respectively. CONCLUSIONS : As expected, the Signal Metering provides substantial improvements in delay saving for the case of V/C ratio sum is 0.3~1.0 under the traffic flow conditions of Metered Approach is less than Controlling Approach.

A Study about the Transfer Crane Operation Rules (트랜스퍼 크레인 운영규칙에 관한 연구)

  • 김우선;최용석
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2004.04a
    • /
    • pp.451-456
    • /
    • 2004
  • This study was performed to analyze the operation system of transfer crone to improve the reality of yard operation roles in container terminal and present the applicable method of operation rules to apply the operation priority. And we derived the procedure to estimate the maximum number of waiting truck based on the waiting of truck and the occupancy of driving lane in yard, and analyzed the constraint state of space. To solve the space constraint, we provided a multi-job principle to define the space resource and described the solution and sequence diagram for the principle.

  • PDF

Longitudinal Control of Acceleration Lanes and its Impact on Congestion Alleviation (가속차로의 길이 제어와 고속도로 접속부 혼잡저감 효과)

  • Shin, Chi-Hyun;Kim, Kyu-Ok
    • Journal of Korean Society of Transportation
    • /
    • v.23 no.5 s.83
    • /
    • pp.169-176
    • /
    • 2005
  • This paper introduces the dynamic control of acceleration lanes at freeway-ramp junctions. The feasibility of operation with flexible length of acceleration lane was tested with most possible traffic conditions. The operational qualify was also evaluated using average speed and total thru-put at both ramp section and freeway section. A CORSIM microscopic simulation model was used to evaluate the operation quality with a variety or volume conditions and three acceleration lanes, each representing different length categories. In addition, tollgate O-D data including travel times were obtained for two sections on the Gyeong-bu Freeway where an effective merging distance has been largely reduced. Its effect was analyzed and compared to the simulation results. Finally, the effects of acceleration lane are discussed and operational improvement at junctions is presented as research findings.

Estimation of Road Capacity at Two-Lane Freeway Work Zones Considering the Rate of Heavy Vehicles (중차량 비에 따른 편도 2차로 고속도로 공사구간 도로 용량 추정)

  • Ko, Eunjeong;Kim, Hyungjoo;Park, Shin Hyoung;Jang, Kitae
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.19 no.2
    • /
    • pp.48-61
    • /
    • 2020
  • The objective of this study is to estimate traffic capacity based on the heavy-vehicle ratio in a two-lane freeway work zone where one lane is blocked by construction. For this, closed circuit television (CCTV) video data of the freeway work zone was collected, and the congestion at an upstream point was observed. The traffic volume at a downstream point was analyzed after a bottleneck was created by the blockage due to the upstream congestion. A distribution model was estimated using observed-time headway, and the road capacity was analyzed using a goodness-of-fit test. Through this process, the general capacity and an equation for capacity based on the heavy-vehicle ratio passing through the work zone were presented. Capacity was estimated to be 1,181~1,422 passenger cars per hour per lane (pcphpl) at Yeongdong, and 1,475~1,589pcphpl at Jungbu Naeryuk. As the ratio of heavy vehicles increased, capacity gradually decreased. These findings can contribute to the proper capacity estimation and efficient traffic operation and management for two-lane freeway work zones that block one lane due to a work zone.

A Case Study on the Traffic Operational Guidance for Temporary Closure of Climbing Lane; Focusing on Nakdong JC at Jungbunaeryuk Expressway (오르막차로 일시 폐쇄를 위한 교통운영기준 사례연구 (중부내륙고속도로 낙동JC를 중심으로))

  • Choi, Yoon-Hyuk;Lee, Seung-Jun;Bae, Young-Seok;Ko, Han-Geom
    • International Journal of Highway Engineering
    • /
    • v.12 no.4
    • /
    • pp.17-28
    • /
    • 2010
  • A climbing lane is installed to separate low-speed traffic from high-speed traffic if drastic traffic capacity reduction is expected due to a large number of vehicles that slow down in the upward section. Existing studies on climbing lanes have focused on the designation, location of starting and ending points, and installation method of climbing lane with regard to road design standards. However, in terms of traffic operation, it was known that the climbing lanes cause traffic congestion due to the increase of traffic volumes. In this regard, this study aims to establish traffic operational guidance as to how much effects temporary closure of climbing lanes can have on traffic improvement according to the volume-capacity ratio, grade, and composition of trucks. A test section of simulated climbing lane was selected in Nakdong JC bound for Masan(136.9K~133.3K, 3.6km, 3.7%) on Jungbunaeryuk expressway to conduct VISSIM analyses, microscopic traffic simulation based on such control variables as traffic volume(v/c), grade and the trucks ratio. As a result of the analyses, it has been found that v/c and the ratio of trucks are the key variables for efficient traffic management of climbing lanes in order to relieve traffic congestion via climbing lane. If ratio of trucks are more than 50% and when v/c would be 0.8, both climbing lane would be closed and non-operated regardless of grade and ratio of trucks when v/c is 1.0. With the increased traffic due to a five-day work week system, continued peak hours during the weekday, increased and various patterns of congestion on expressway, this study would be expected to contribute to facilitating researches on flexible operational standards for road facilities.

A Study on the Development of Operation Base System for Bimodal Tram (바이모달트램 운행을 위한 운영기반시스템 개발에 관한 연구)

  • Yoon, Hee-Taek;Park, Young-Kon;Byun, Yun-Sup;Lee, Kang-Won;Hong, Yong-Ki
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1937-1942
    • /
    • 2007
  • Bimodal tram is being developed to be completed in 2010 and the infrastructure needs to be developed to make the operation in time. Through the study of infrastructure reflecting domestic condition, dedicated lane, station, connection center, automated operation, precise docking, ticketing system, information system, management system for operation and maintenance, and refueling station will be developed and their performances will be also verified through the construction of test bed. The economical, safe and environment-friendly operation of the bimodal tram will be established through the present study.

  • PDF

A Study on Dynamic Signal Metering Operation Method for Roundabouts Using VISSIM (VISSIM을 활용한 회전교차로의 동적 신호미터링 운영방안 연구)

  • Lee, Sol;Ahn, Woo-Young
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.15 no.2
    • /
    • pp.74-84
    • /
    • 2016
  • After installing roundabouts, changes of travel behaviour in the vicinity of roundabouts can cause increasing traffic volumes and unbalanced flow conditions. In that cases, the efficiency of roundabouts as a whole intersections can drop due to the insufficient gap between vehicles in the circulating lanes. The purpose of this study is developing a dynamic signal metering operation method for roundabouts in which a real time Signal Metering operation algorithm is suggested and its performance is tested by using VISSIM COM Interface(Visual Basic Application). The results of the real time Signal Metering operation show that there is a substantial delay improvements when two adjoined approaches are combined together and the flows of metering approach are less than controlling approach. Especially, the total entering flow is around 1,600 vehicle/h gives the delay reduction per vehicle of 70.9~102.2(73.8~77.8%) seconds for four-lane-approach with one-lane roundabouts.

Development of Guidelines for Installing Speed Control Humps (차량과속방지턱의 설치기준 개발에 관한 연구)

  • 문무창;장명순
    • Journal of Korean Society of Transportation
    • /
    • v.12 no.1
    • /
    • pp.137-149
    • /
    • 1994
  • The objective of study is to evaluate the effect of speed control hump on traffic operation and accidents. Three sites were investigated for the change of traffic accidents before and after the hump installation. Vehicle speeds approaching the hump were also analyzed. The study revealed that not only the number of traffic accidents but also the accident severity were significantly reduced by the installation of hump. Further, different types of traffic accidents with lower severity were observed after the hump installation. For the effect of speed reduction by hump, it was found that the speeds observed at 15m upstream of hump were in the range of 36~50 percent of approaching speeds which were not affected by (ie, without) the hump. Economic analysis of hump installation showed the benefit-cost ratio of 4.3 and 11.2 at two sites. Further analysis revealed that the benefit by the accident reduction exceeds the cost by speed reduction and installation capital if AADT is below 43,150 vehicles on two lane highways. It is recommended from the study that humps should be considered on two lane highways of high accident locations for excessive speeds to reduce traffic accidents and severity.

  • PDF

The Proper Length of Transition Area for Work Zones on Urban Freeways (도시고속도로 공사구간의 적정 완화구간 길이 산정)

  • Lee, Mi Ri;Lee, Chungwon;Kim, Do-Gyeong
    • Journal of Korean Society of Transportation
    • /
    • v.31 no.4
    • /
    • pp.58-66
    • /
    • 2013
  • Due to the characteristics of urban freeways such as heavy traffic and high speed, work zone on urban freeways causes the increase of not only the likelihood of crash occurrence but also traffic congestion caused by lane drop, lane change, acceleration/deceleration, and etc. This paper aims to determine the proper length of transition area that satisfies two criteria, mobility and safety, to make the operation of work zone more efficient. For the analysis, three different scenarios were developed by the number of lanes and the proper length of transition area were determined by changing the length from 100m to 500m in 100m increments. The results showed that the proper length of transition area for 3- and 4-lane freeways is 300m, whereas the proper length of 2-lane freeways is 200m. The results indicated that the different length of transition area based on the number of lanes is more desirable and efficient.