1 |
Ministry of Land, Transport and Maritime, Korea(2013), Highway Capacity Manual, pp.490-521.
|
2 |
Ministry of Land(2014), Infrastructure and Transport, Korea, Roundabouts Design Manual.
|
3 |
Akcelik R.(2004), "Roundabouts with unbalanced flow patterns," ITE 2004 Annual Meeting, Lake Buena Vista, Florida, USA, August 1-4.
|
4 |
Ahn W. Y.(2012), "A Study on Roundabout Signal Metering Operation by Considering Entry Lane's Traffic Volume," International Journal of Highway Engineering, vol. 14, no. 2, pp.175-181.
DOI
|
5 |
Ahn W. Y., Lee S. Y. and Ahn G. G.(2011), "A Study on Signal Metering Performance Analysis for Roundabouts," Journal of Transport Research, vol. 18, no. 2, pp.1-11.
|
6 |
Akcelik R.(2005), "Capacity and Performance Analysis of Roundabout Metering Signals," TRB National Roundabout Conference, vail, Colorado, USA, 22-25 May.
|
7 |
Ahn W. Y. and Lee S. Y.(2013), "Roundabout Signal Metering Operation Methods by Considering Approach Lane's Degree of Saturation," International Journal of Highway Engineering, vol. 15, no. 5, pp.217-226.
DOI
|
8 |
Lee H. S.(2013), "A Study on The Effective Operation Strategy of Signalized Roundabouts," Graduate School of Gachon University, pp.57-59.
|
9 |
Park J.(2015), "Development of an Application for Signal Metering on Roundabouts," Graduate School of The University of Seoul, pp.48-49.
|
10 |
Natalizio E.(2005), "Roundabouts with Metering Signals," Institute of Transportation Engineers 2005 Annual Meeting, Melbourne, Australia, August.
|