• Title/Summary/Keyword: labor resources

Search Result 519, Processing Time 0.03 seconds

The Contribution toward Farming Productivity of Rural Women and its Effects of Human Capital (여성농업인의 농업생산 기여도와 기여도에 대한 인적자본요소의 영향)

  • Lim, Chan-Young;Choi, Yoon-Ji;Gim, Gyung-Mee;Lee, Jin-Young
    • Journal of the Korean Home Economics Association
    • /
    • v.44 no.3 s.217
    • /
    • pp.153-161
    • /
    • 2006
  • The purpose of this paper is to estimate the farming product function of rural women and to determine the effect of human capital. The data was based on 300 husbands and wives from 150 farms with crops of high female input time rate such as house-cucumbers, house-strawberries, roses, agaric mushrooms and apples in 2003. According to the results, the rural women were mainly engaged in harvesting, selecting, sorting and packing among about 23 working steps in the Korean farm. These works require a long time for the highly-skilled and have a very important and sensitive effect on quality, quantity, price of products and the farm's income. The cultivated experience and the major cultivation step effect had a positive relationship to farm's income for women. The machine effect was estimated significantly at 0.3976, which indicated that the high-skilled farmers have a positive correlation to farm's income. The rural women's labor value has been evaluated relatively lowly compared with men performing the same work. As an example, women are paid an average of 62.3% of the men's wage in harvesting and packing in Korea.

Study on Enterprise Resources Planning by Activity Based Management Method (활동기준 경영기법에 의한 전사적 자원관리에 관한 연구)

  • Lee Jang-Hyung
    • Management & Information Systems Review
    • /
    • v.2
    • /
    • pp.209-235
    • /
    • 1998
  • Traditional cost system is distorted due to the using unit-based measure. It is being criticized that it do a poor job of attributing the expenses of support resources to the production and sales of individual product. Activity Based Cost System expend the range of second-stage cost assignment drivers beyond the traditional measures of labor and machine times, units produced, and material quantities to allow for drivers that measure the amount of batch-level, product-sustaining, and facility-sustaining activities performed. It is a resources consumption model of organization, not just a more complex cost accounting of cost allocation system. This paper proposes a enterprise resource planning by activity based management. To effective performance system for company that want to be setting competitive levels, the information systems must support a fast moving, rapidly changing. Activity based management is a process of accumulating and tracing cost and performance da to a firm's activities and providing feedback of actual results against the planned cost to initiate corrective action where required. Therefore this system provides a highly powerful decision-making tool. To construct this system, we need Enterprise Resource Planning System. Since ERP is designed around the idea that rapid change and a degree of unhandled change is normal, it allows driving the customer's rapidly needs much deeper through the business cycle.

  • PDF

Current Status and Perspectives for the 21st Century of Rural Living Improvement Program in Japan (일본의 생활개선사업 현황과 21세기 전망)

  • Lee, Geum-Ok
    • Journal of Agricultural Extension & Community Development
    • /
    • v.11 no.1
    • /
    • pp.37-52
    • /
    • 2004
  • The rural living improvement in Japan operates in considerations of socio-eoonomic circumstances of rural community as in Korea. After 1945 the program emphasized the improvement of living conditions such as poverty alienation improvement of house and toilet nutrition after war, From 1955, health programs including better cooking and nutrition, house modification and improved living conditions corresponding to the goal of the developed country were carried out. In 1965. the goal of the rural home economics was focused on the harmonized production and living, improvement of the levels of rural living, health and building rural community. From 1975, the goals of the program were to organize the farming in the better ways and improvement of rural women's role. In 1985, making agreeable living conditions was emphasized under the goal of vital rural society. From the period of Heysey(1989${\sim}$), for better living of rural people the government is emphasizing the programs including farm labor management, utilization of farm products, farm management and rural environments. Recognizing the important influencing resources of agents in extension services, on the job and education was implemented step by step from basic to planning to upgrade competencies. The government is trying to construct better with infrastructures, encouraging direct selling the value-added processed food from local farm products with rural people's real name and other countryside resources. Major programs in the 21st centuries are building better rural society with men and women together and considering elders as well as new farmers.

  • PDF

Factors Influencing Balanced Scorecard Application in Evaluating the Performance of Tourist Firms

  • TRUONG, Duc Dinh;NGUYEN, Hoan;DUONG, Thi Quynh Lien
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.7 no.5
    • /
    • pp.217-224
    • /
    • 2020
  • This study investigates the impact levels of determinants on the Balanced Scorecard application in evaluating the performance of tourism firms in Hanoi. The tourism industry not only promotes economic development, but also contributes to expanding cultural exchanges and improving people's knowledge. However, Vietnam's tourism industry is under fierce competitive pressure, with the participation of foreign enterprises, with large amount of capital, high professionalism and wide network. The rivalry is happening aggressively on many aspects such as products and human resources. Therefore, tourism firms are in urgent needs of having effective methods to evaluate its performance in order to improve business and development efficiency. This study uses data of tourism firms in Hanoi during 2018-2019. The data used for analysis and regression consists of 135 observations. We use Cronbach's Alpha, EFA and regression model to learn the effect of different variables on the Balanced scorecard application in evaluating the performance. The results show that two determinants, including internal factors of tourism firms (IF) and external factors of tourism firms (EF) had positive relationships with the Balanced scorecard application in evaluating the performance. Based on the findings, recommendations are given for improving the Balanced scorecard application in evaluating the performance of tourism firms in Hanoi.

Construction Projects Productivity in West African country of Benin: Case of Ground Earthworks

  • Akogbe, Romuald Kokou;Feng, Xin;Zhou, Jing
    • Journal of Construction Engineering and Project Management
    • /
    • v.5 no.2
    • /
    • pp.16-23
    • /
    • 2015
  • In this paper, a survey related to excavation construction activities among national and international construction companies was conducted to evaluate site productivity in construction industry. To analyze the respective productivity levels of each construction company, a benchmarking measures analysis that featured calculations of the performance ratio (PR) and performance management index (PMI) was performed. As a result of these analyses, it has been found that the work performed by local companies was marked by lower productivity and that of international companies was characterized by good productivity. Further analysis of construction workforce resources P% revealed that a construction company's productivity is largely dependent on production capacity and consumption resources, which means that the retention of skilled workers and utilization of high-quality resources yields the highest level of productivity. These results suggest that for a local construction company to be competitive in the construction work market, it must retrain skilled craftspeople, foremen, engineers, and project managers, and strengthen its building capability by leveraging new equipment and technologies.

Design of a Method for Disassembly Works on Recycle Products

  • Matsumoto, Toshiyuki;Yahata, Yuko;Shida, Keisuke
    • Industrial Engineering and Management Systems
    • /
    • v.8 no.1
    • /
    • pp.66-71
    • /
    • 2009
  • This study proposes a new framework for designing disassembly methods. In recent years, environmental problems have become global issues. Recycling of used products or resources is recognized as a matter of significance since it may help reduce the risk of exhausting natural resources. Considering possible exhaustion of limited natural resources in the near future, reuse of products would gain more environmental significance. As yet, it relies hugely on manual disassembly, which labor cost places burden on the total recycling cost. The purpose of this study is to propose a methodology designing for manual disassembly works, and a creation method of a jig. By focusing on parts' connection and attachment relationship, parts are categorized in 5 categories (parent part, joint key part, attaching key part, child part, and independent part) according to the features that parts possess, and 3 kinds of connection relationships (parent part-joint key part connection, parent part-independent part connection and child part-child part connection) are clarified. Connection relationship and attachment relationship charts have also been created, and utilizing them, disassembly orders are settled, and a disassembly jig is devised. The proposed methodology is also applied to a real product and its work time is improved 42% form 31 to 13 seconds.

A novel method for cell counting of Microcystis colonies in water resources using a digital imaging flow cytometer and microscope

  • Park, Jungsu;Kim, Yongje;Kim, Minjae;Lee, Woo Hyoung
    • Environmental Engineering Research
    • /
    • v.24 no.3
    • /
    • pp.397-403
    • /
    • 2019
  • Microcystis sp. is one of the most common harmful cyanobacteria that release toxic substances. Counting algal cells is often used for effective control of harmful algal blooms. However, Microcystis sp. is commonly observed as a colony, so counting individual cells is challenging, as it requires significant time and labor. It is urgent to develop an accurate, simple, and rapid method for counting algal cells for regulatory purposes, estimating the status of blooms, and practicing proper management of water resources. The flow cytometer and microscope (FlowCAM), which is a dynamic imaging particle analyzer, can provide a promising alternative for rapid and simple cell counting. However, there is no accurate method for counting individual cells within a Microcystis colony. Furthermore, cell counting based on two-dimensional images may yield inaccurate results and underestimate the number of algal cells in a colony. In this study, a three-dimensional cell counting approach using a novel model algorithm was developed for counting individual cells in a Microcystis colony using a FlowCAM. The developed model algorithm showed satisfactory performance for Microcystis sp. cell counting in water samples collected from two rivers, and can be used for algal management in fresh water systems.

Resource and Sequence Optimization Using Constraint Programming in Construction Projects

  • Kim, Junyoung;Park, Moonseo;Ahn, Changbum;Jung, Minhyuk;Joo, Seonu;Yoon, Inseok
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.608-615
    • /
    • 2022
  • Construction projects are large-scale projects that require extensive construction costs and resources. Especially, scheduling is considered as one of the essential issues for project success. However, the schedule and resource management are challenging to conduct in high-tech construction projects including complex design of MEP and architectural finishing which has to be constructed within a limited workspace and duration. In order to deal with such a problem, this study suggests resource and sequence optimization using constraint programming in construction projects. The optimization model consists of two modules. The first module is the data structure of the schedule model, which consists of parameters for optimization such as labor, task, workspace, and the work interference rate. The second module is the optimization module, which is for optimizing resources and sequences based on Constraint Programming (CP) methodology. For model validation, actual data of plumbing works were collected from a construction project using a five-minute rate (FMR) method. By comparing actual data and optimized results, this study shows the possibility of reducing the duration of plumbing works in construction projects. This study shows decreased overall project duration by eliminating work interference by optimizing resources and sequences within limited workspaces.

  • PDF

A Study on the Working Unit of Forestry Management Cooperatives (산림경영협업체작업단(山林經營協業體作業團)에 관(關)한 연구(硏究))

  • An, Jong Man;Kang, Hag Mo
    • Journal of Korean Society of Forest Science
    • /
    • v.85 no.2
    • /
    • pp.180-194
    • /
    • 1996
  • The Working Unit of Forestry Management Cooperatives has been organized by the training and extention service center since 1984 so as to take charge of forestry work of Forestry Management Cooperatives, and this study has been carried out in order to find the problem of Working Unit of Forestry Management Cooperatives, and to show how to solve it in the future. We analyzed a material gained by the immediate questionnaires to 33 members of 4 Working Unit of Forestry Management Cooperatives in Ulsan-Kun, and 10 members of Working Unit of Forestry Management Cooperatives in Jinan-Kun between July and August in 1993. Later, we found that there was an almost inactive Working Unit caused by the insufficient work amount, which resulted in inefficient skill and forestry work due to leave of the skilled forestry worker. Though the government concentrates on bringing up the Working Unit centered by the specialized laborer, it is concluded that bringing up the Working Unit should consider local labor market, organization of agriculture and forestry, organization of labor, level of wage, and the amount of forestry work.

  • PDF

Comparison of Flower Thinning Efficiency of Lime-sulfur on Korean Major Pear (Pyrus pyrifolia Nakai) Cultivars (석회유황합제 처리에 의한 국내 주요 배 품종별 적화 반응 비교)

  • Byeong Hyeon Yun;Ji Hae Jun;Il-Sheob Shin;Hyun Ran Kim;Kang Hee Cho;Jae Hoon Jeong;Se Hee Kim;Sang-Yun Cho;Sewon Oh
    • Korean Journal of Plant Resources
    • /
    • v.37 no.1
    • /
    • pp.62-70
    • /
    • 2024
  • Fruit thinning rate and characteristics were investigated for three years on seven promising pear (Pyrus pyrifolia Nakai) cultivars, which were treated by lime-sulfur as an eco-chemical thinning substance. Lime-sulfur was treated twice at the second and third days after full bloom by cultivar. Most of pear cultivars were significantly thinned by lime-sulfur compounds. Especially 'Whangkeumbae', 'Supergold' and 'Hanareum' exhibited high flower thinning rates, 41.5%, 40.1% and 39.9%, respectively. As weather conditions at the lime-sulfur treatment, insolation and cloud amount were correlated with flower thinning rate but not significant (r = 0.49 and r = -0.45, respectively). These results suggest that lime-sulfur is suitable for reducing labor force for flower thinning of Korean pears but flower thinning effects of lime-sulfur can vary depending on other factors such as environmental conditions. This information will provide useful data for low labor force cultivation of Korean pear cultivars.