DOI QR코드

DOI QR Code

Construction Projects Productivity in West African country of Benin: Case of Ground Earthworks

  • Akogbe, Romuald Kokou (Faculty of Infrastructure Engineering, Dalian University of Technology) ;
  • Feng, Xin (Faculty of Infrastructure Engineering, Dalian University of Technology) ;
  • Zhou, Jing (Faculty of Infrastructure Engineering, Dalian University of Technology)
  • 발행 : 2015.06.01

초록

In this paper, a survey related to excavation construction activities among national and international construction companies was conducted to evaluate site productivity in construction industry. To analyze the respective productivity levels of each construction company, a benchmarking measures analysis that featured calculations of the performance ratio (PR) and performance management index (PMI) was performed. As a result of these analyses, it has been found that the work performed by local companies was marked by lower productivity and that of international companies was characterized by good productivity. Further analysis of construction workforce resources P% revealed that a construction company's productivity is largely dependent on production capacity and consumption resources, which means that the retention of skilled workers and utilization of high-quality resources yields the highest level of productivity. These results suggest that for a local construction company to be competitive in the construction work market, it must retrain skilled craftspeople, foremen, engineers, and project managers, and strengthen its building capability by leveraging new equipment and technologies.

키워드

참고문헌

  1. Hanna A.S., Taylor C.S., Sullivan K.T., Impact of extended overtime on construction labor, Journal of Construction Engineering and Management JCEM, 131(6), 734-739, 2005 https://doi.org/10.1061/(ASCE)0733-9364(2005)131:6(734)
  2. Koskela L., Vrijhoef R., Is the current theory of construction a hindrance to innovation, Building Research & Information, 29(3) 197-207, 2001 https://doi.org/10.1080/09613210110039266
  3. Willis C.J. and Rankin J.H., The construction industry macro maturity model (CIM3): theoretical underpinnings, International Journal of Productivity and Performance management, 61(4), 382-402, 2012 https://doi.org/10.1108/17410401211212652
  4. Shouke C., Zhuobin W. and Jie L., Comprehensive evaluation for construction performance concurrent engineering environment, International Journal of Project Management, 28(7), 708-718, 2010 https://doi.org/10.1016/j.ijproman.2009.11.004
  5. Sahay B.S., Multi-factor productivity measurement model for service organization, International Journal of Productivity and Performance Management, 54(1), 7-22, 2005 https://doi.org/10.1108/17410400510571419
  6. Stewart R. A. and Spencer C.A., Six-sigma as a strategy for process improvement on construction projects: a case study, Construction Management and Economics, 24(4), 339-348, 2006 https://doi.org/10.1080/01446190500521082
  7. Hewage K.N. and Ruwanpura J.Y., Carpentry worker issues and efficiencies related to construction productivity in commercial construction projects in Alberta, Canadian Journal of Civil Engineering, 33(8), 1075-1089, 2006 https://doi.org/10.1139/l06-050
  8. Zhai D., Goodrum P.M., Haas C.T., Caldas C.H., Relation between automation and integration of construction information systems and labor productivity, Journal of Construction Engineering and Management, 135 (8), 746-753, 2009 https://doi.org/10.1061/(ASCE)CO.1943-7862.0000024
  9. Abdel-Razek R.H., AbdElshakour H.M., Abdel-Hamid M., Labor productivity: Benchmarking and variability in Egyptian projects, International Journal of Project Management, 25(2), 189-197, 2007 https://doi.org/10.1016/j.ijproman.2006.06.001
  10. Mojahed S., Aghazadeh F., Major factors influencing productivity of water and wastewater treatment plant construction: Evidence from the deep south USA, International Journal of Project Management, 26(2008) 195-202, 2008 https://doi.org/10.1016/j.ijproman.2007.06.003
  11. Tabassi A.A., Ramli M., Abu Bakar A.H., Effect of training and motivation practices on teamwork improvement and task efficiency: The case of construction firms, International Journal of Project Management, 30(2), 213-224, 2012 https://doi.org/10.1016/j.ijproman.2011.05.009
  12. Hwang S., Liu L. Y., 2010, Contemporaneous time series and forecasting methodologies for predicting short-term productivity, Journal of Construction Engineering and Management, 136 (9), 1047-1055, 2010 https://doi.org/10.1061/(ASCE)CO.1943-7862.0000183
  13. Mojahed S., Aghazadeh F., Major factors influencing productivity of water and wastewater treatment plant construction: Evidence from the deep south USA, International Journal of Project Management, 26(2008) 195-202, 2008 https://doi.org/10.1016/j.ijproman.2007.06.003
  14. Ng S. T., Skitmore, R.M., Lam, C.K., Poon, A.W.C., Demotivating factors influencing the productivity of civil engineering projects, International Journal of Project Management,22(2), 139-146, 2004 https://doi.org/10.1016/S0263-7863(03)00061-9
  15. Nasirzadeh F., Nodejehi P., Dynamic modeling of labor productivity in construction projects, International Journal of Project Management, (2012), http:dx.doi.org/10.1016/j.ijproman.2012.11.003
  16. Khoramshahi F., Dehghan R., Mortaheb M.M., Factors influencing construction productivity. Proceedings of the 10th EASEC, 2006; p. 269-274. Bangkok. Thailand.
  17. Enshassi A., Mohamed S., Mustafa Z.A., Mayer P.E., Factors affecting labor productivity in building projects in the Gaza Strip, Journal of Civil Engineering and Management, 13(4) 245-254, 2007
  18. Alinaitwe H.M., Mwakali J.A., Hansson B., Factors affecting the productivity of building craftmen-studies of Uganda, Journal of Civil Engineering and Management, 13(3), 169-176, 2007
  19. Weng-Tat C., A systems perspective of construction productivity improvement efforts, Proceeding of the 1st International Conference of European Asian Civil Engineering Forum, Jakarta-Indonesia, p. E43-E50, 2007
  20. Hanna A. S., Chang C. K., Sullivan K. T., Lackney J. A., Impact of shift work on labor productivity for labor intensive contractor, Journal of Construction Engineering and Management, 134 (3) 197-204, 2008 https://doi.org/10.1061/(ASCE)0733-9364(2008)134:3(197)
  21. Kazaz A., Manisali E., Ulubeyli S., Effect of basic motivational factors on construction workforce productivity in Turkey, Journal of Civil Engineering and Management, 14(2), 95-106, 2008 https://doi.org/10.3846/1392-3730.2008.14.4
  22. Dansoh, A. Strategic planning practice of construction firms in Ghana, Construction Management and Economics, 23(2), 163-168, 2005 https://doi.org/10.1080/0144619042000241435
  23. Ameh, O.J., & Odusami, K.T. Factors affecting labour productivity in Nigerian Construction Industry: A case study of indigenous contracting organizations in Lagos, The Quantity Surveyor, 40(3), 14-18, 2002
  24. Kaliba C, Muya M, and Mumba K. Cost escalation and schedule delays in road construction projects in Zambia, International Journal of Project Management, 27(5):522-531, 2009 https://doi.org/10.1016/j.ijproman.2008.07.003
  25. Mutijwaa P, and Rwelamila D. Project Management Competence in Public Sector Infrastructure Organisation, Construction Management and Economics, 25(1):55- 66, 2007 https://doi.org/10.1080/01446190601099210
  26. Elattar S. M. S., Automation and Robotics in Construction: Opportunities and Challenges, Emirates Journal for Engineering Research, 13(2), 21-26, 2008
  27. Yang L. R., Impacts of automation technology on quality of project deliverables in the Taiwanese construction industry, Canadian Journal of Civil Engineering, 36(3), 402-421, 2009 https://doi.org/10.1139/L08-072
  28. Corke P., Winstanley G., Dunlin M., Robert J., Dragline Automation: Experimental Evaluation through Productivity Trial, In: Advances inTele-Robotics, Siciliano, B; Khatib, O. & Groen, F. (Ed.), pp. 459-468, Springer, 2006; ISBN: 78-3-540-32801-8, Berlin.