• 제목/요약/키워드: key schedule

Search Result 130, Processing Time 0.028 seconds

A Chosen Plaintext Linear Attack On Block Cipher Cipher CIKS-1 (CIKS-1 블록 암호에 대한 선택 평문 선형 공격)

  • 이창훈;홍득조;이성재;이상진;양형진;임종인
    • Journal of the Korea Institute of Information Security & Cryptology
    • /
    • v.13 no.1
    • /
    • pp.47-57
    • /
    • 2003
  • In this paper, we firstly evaluate the resistance of the reduced 5-round version of the block cipher CIKS-1 against linear cryptanalysis(LC) and show that we can attack full-round CIKS-1 with \ulcorner56-bit key through the canonical extension of our attack. A feature of the CIKS-1 is the use of both Data-Dependent permutations(DDP) and internal key scheduling which consist in data dependent transformation of the round subkeys. Taking into accout the structure of CIKS-1 we investigate linear approximation. That is, we consider 16 linear approximations with p=3/4 for 16 parallel modulo $2^2$ additions to construct one-round linear approximation and derive one-round linear approximation with the probability P=1/2+$2^{-17}$ by Piling-up lemma. Then we present 3-round linear approximation with 1/2+$2^{-17}$ using this one-round approximation and attack the reduced 5-round CIKS-1 with 64-bit block by LC. In conclusion we present that our attack requires $2^{38}$chosen plaintexts with a probability of success of 99.9% and about $2^{67-7}$encryption times to recover the last round key.(But, for the full-round CIKS-1, our attack requires about $2^{166}$encryption times)

A Study on the Application of MOEs, MOPs, TPMs for the Integrated Logistics Support (종합군수지원에서의 MOEs, MOPs, TPMs 적용방안에 대한 연구)

  • Seo, Yang Woo;Oh, Young Il;Park, Eun Shim;Lim, Seong Jun;Lee, Seung Sang
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.15 no.2
    • /
    • pp.47-56
    • /
    • 2019
  • Although the weapon systems are becoming more diverse and complex, they are progressing in a short development period and a longer test and evaluation period. The more difficult the given environment is, the more efforts and performance of quantitative target values can be made by development agencies to carry out stable projects. However, these target values of the Integrated Logistics Support are not specified in the requirements and being set during the system development phase. In this paper, application of MOEs, MOPs and TPMs for ILS are presented and provided the basis for carrying out systematic Verification & Validation activities. As a result that MOEs of the ILS were chosen as Availability and MOPs as Mission Reliability, Logistics Reliability, Maintainability and Supportability and TPMs as MTBF, MTBCF, MTTR and so on. In particular, it is appropriate tailoring and apply the TPMs considering the cost, schedule, scope of work and characteristics of the project.

A case study on the vibration by fluid induced instability at large steam turbine-generator (대형 터빈-발전기에서의 유체 불안정진동 해소사례)

  • Han, Seung-Woo;Noh, Chel-Woo;Kim, In-Chul;Joo, In-Gouk;Kim, Myong-Shik
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2007.11a
    • /
    • pp.1066-1071
    • /
    • 2007
  • This case study refers to turbine-generator with retrofitted turbine rotor. Vibration problem occurring after the retrofit was mainly due to high vibration from exciter side. However, repeated test run and operation during scheduled maintenance caused high vibration from generator bearing, and post-overhaul test run before turbine vibration correction caused oil whip on the bearing. This case study shows how to analyze vibration condition of high turbine generator vibration detected during the post-overhaul test run and vibration condition of offline and online data to reflect it on establishing maintenance schedule and overhaul correction procedure. Vibration data could be acquired during steady load operation or even with varying speed and load. Each data is important for machinery condition evaluation. This case study shows that the vibration data during extreme condition is the key factor in analysis, which helps to find the machinery problem.

  • PDF

Design of Water Resource Planning System Utilizing Special Features in Mathematical Programming Data Structure (수리계획 모형 자료구조를 활용한 수자원 운영 계획 시스템의 설계)

  • Kim, Jae-Hee;Park, Youngjoon;Kim, Sheung-Kown
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2000.04a
    • /
    • pp.160-163
    • /
    • 2000
  • Due to the complexities of the real-world system, a water resource management program has to deal with various types of data. It appears that management personnel who has to use the program usually suffers from the technical burdens of handling large amount of data and understanding the optimization theory when they try to interpret the results. By combining the capabilities of database technology and modeling technique with optimization procedure we can develop a reliable decision supporting tool for multi-reservoir operation planning, which yields operating schedule for each dam in a river basin. We introduce two special data handling methodology for the real world application. First, by treating dams, hydro-electric power generating facilities and demand sites as separate database tables, the proposed data handling scheme can be applied to general water resource system in Korea. Second, by assigning variable names using predetermined key words, we can save searching time for identifying the moaning of the variables, so that we can quickly save the results of the optimization run to the database.

  • PDF

Electrical Impedance Response Model of Concrete in Setting Process (응결 과정 콘크리트의 전기 임피던스 응답 해석 모델)

  • Shin, Sung Woo;Hwang, Garam;Lee, Chang Joon
    • Journal of the Korean Society of Safety
    • /
    • v.29 no.5
    • /
    • pp.116-122
    • /
    • 2014
  • Assessment of setting process of concrete is important as it provides useful information to schedule concreting work in construction site. Electrical impedance measurement method, which utilizes the change of electrical resistance of concrete, has been applied to assess setting process of cement-based materials. However, the applicability of the method has been demonstrated only for cement paste and mortar. The main purpose of this research is to develop the electrical impedance based setting process assessment for concrete. To this end, electrical impedance response model for concrete should be developed in advance since it is essential to estimate the electrical resistance of concrete from measured impedance response. The electrical resistance of concrete is a key parameter for the setting process assessment. In this study electrical impedance responses of the concrete in setting process are measured and analyzed. Thereby, an electrical impedance response model of the liquid state concrete is developed and schematically validated.

Key Layouts of the 5,000 ton' New Scientific Research Vessel of KIOST (5,000톤급 대형 해양과학연구선 설계 특성)

  • Park, Cheong Kee
    • Ocean and Polar Research
    • /
    • v.37 no.3
    • /
    • pp.235-247
    • /
    • 2015
  • The main purpose of procuring the oceanographic research vessel with state-of-the-art technology is to provide a floating laboratory to conduct field work on the global oceans. The vessel should be properly utilized to locate and evaluate unexplored natural resources as well as to contribute international efforts to better understand and manage global environmental issues. Top priorities in the vessel design are high safety standards, noise and vibration control efficiency, and effective application of research equipment. For the accomplishment of all activities, the vessel length over all should be extended ~100 m with a gross tonnage of ~5,900 ton. In particular, the dynamic positioning system II will essentially operate at sea state 6. The high efficiency emissions reduction system will also be adopted in preparation for entry into force of 3rd exhaust emission control (Tier III). About 130 navigational and scientific instruments will be installed. The final design and model test of the new research vessel were reviewed and completed, respectively, in 2014. Currently, the ship is being built on schedule and expected to be delivered in December 2015. Within the near future, the new vessel will assume the role of carrying out multidisciplinary oceanographic researches of the highest standards in a technologically advanced and environment friendly manner.

A suggestion of health insurance for children (소아 영역의 건강보험제도 개선안)

  • Eun, Baik-Lin
    • Clinical and Experimental Pediatrics
    • /
    • v.51 no.4
    • /
    • pp.339-342
    • /
    • 2008
  • The Korean Health Insurance (KHI) has been introduced since 1977 and it took only 12 years that KHI had accomplished the total coverage of Korean population. The remarkable success of KHI can be compared with other OECD countries which had taken some 30 years to over 100 years to establish the total coverage of the population. Life expectancy at birth and the infant mortality rate in Korea in 2005 both surpassed the average figures of the OECD countries, The main reason for the success of KHI can be delineated with the three characteristics in KHI development; low premiums, low benefits, and low fee-schedule charges. However, these three characteristics of KHI, which had been the key for the rapid development of the system, have become terrible disadvantages for the stable development of KHI. The dissatisfaction and discontent of health care providers are ever increasing. The population is reluctant to pay more premiums though it seems essential for the better care coverage. The health care system has been heavily distorted toward high technology-oriented expensive care. There should be several factors seriously tackled for the secure development of KHI in the future. This paper will review a brief history of KHI development, and I would like to make a suggestion of health insurance for children.

Development of Time-Cost Models for Building Construction Projects in Bangladesh

  • Rahman, MD. Mizanur;Lee, Young Dai;Ha, Duy Khanh;Chun, Yong Hyun
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.3
    • /
    • pp.13-20
    • /
    • 2014
  • Estimating time and cost is an important mission in the early phase of a construction project, especially in feasibility study. It provides a foundation for making decision whether or not the project is performed on schedule and within budget. Thus, reliability of this estimate plays a key role in measuring the success of a project. This study was carried out to investigate the time-cost relationship in building construction projects in Bangladesh. The mathematical equation used in this study is based on Bromilow's equation. The research data were collected from sixty-three completed building projects through questionnaire survey. Type of clients, type of projects, and tender methods are the project characteristics considered in this study. The results of analysis indicated that the Bromilow's time-cost (BTC) models developed for each project characteristic are appropriate due to quite high coefficient of determination and relatively small mean percent errors. Among them, the forecasted model for time and cost according to tender methods is the best fit model. It is concluded that the BTC model could be applied in building construction project to predict its time and cost in Bangladesh. Four different regression models were also developed in this study. The results of BTC model between some selected countries were compared to gain the comprehensive view.

An Analysis of the Strengths and Weaknesses of Seoul Fashion Week with a Focus on Organisational Issues

  • Kim, Hye Eun
    • Fashion & Textile Research Journal
    • /
    • v.17 no.6
    • /
    • pp.895-906
    • /
    • 2015
  • Seoul Fashion Week aims to be the world’s fifth Fashion Week from the year after 2000. This has involved significant labour and investment, not all of which has been successful. This study analyses the strengths and weaknesses of SFW based on the London Fashion Week as a successful model. By identifying its obvious and less obvious characteristics, this analysis aims to diagnose SFW’s current status in order to upgrade the event at an international level. Key factors are organisational body, designers, visitors, sponsors, schedule, venue, main events and supportive events. The following points have emerged from the research: the success of Seoul Fashion Week was based on the combination of separate collections, an appropriate fashion show venue, and the active role of new designers. The problems were: lack of an independent organisation, non-professional staff, lack of diverse visitors, exclusive governmental funding, late timing, excessive distance from the main European and American fashion markets, lack of sustainability of the main events, a limited variety of supportive events, the absence of online promotion and, last but not least, no distinctive features. The study concludes that Seoul Fashion Week has great potential with its fast growth and young designers. This should be complemented with an independent organisation and effective administration and strategy.

On determining a non-periodic preventive maintenance schedule using the failure rate threshold for a repairable system

  • Lee, Juhyun;Park, Jihyun;Ahn, Suneung
    • Smart Structures and Systems
    • /
    • v.22 no.2
    • /
    • pp.151-159
    • /
    • 2018
  • Maintenance activities are regarded as a key part of the repairable deteriorating system because they maintain the equipment in good condition. In practice, many maintenance policies are used in engineering fields to reduce unexpected failures and slow down the deterioration of the system. However, in traditional maintenance policies, maintenance activities have often been assumed to be performed at the same time interval, which may result in higher operational costs and more system failures. Thus, this study presents two non-periodic preventive maintenance (PM) policies for repairable deteriorating systems, employing the failure rate of the system as a conditional variable. In the proposed PM models, the failure rate of the system was restored via the failure rate reduction factors after imperfect PM activities. Operational costs were also considered, which increased along with the operating time of the system and the frequency of PM activities to reflect the deterioration process of the system. A numerical example was provided to illustrate the proposed PM policy. The results showed that PM activities performed at a low failure rate threshold slowed down the degradation of the system and thus extended the system lifetime. Moreover, when the operational cost was considered in the proposed maintenance scheme, the system replacement was more cost-effective than frequent PM activities in the severely degraded system.