유연흐름 생산시스템에서의 시뮬레이션을 이용한 동적일정계획 연구 (The dynamic production scheduling on flexible flowshop systems using simulation)

  • 우훈식
    • 한국시뮬레이션학회논문지
    • /
    • 제5권2호
    • /
    • pp.1-12
    • /
    • 1996
  • Utilizing the simulation approaches, the dynamic production scheduling system FOLS(Flexible flowshop On-Line Simulation) is developed under the flexible flowshop environment. When an interruption such as machine failure/recovery is occurred at the shop floor, the FOLS system performs evaluations for job selection rule oriented alternatives, and generates a dynamic production schedule based on the collected current shop floor data. For the case study, the FOLS system is applied to the printed circuit card assembly(PCCA) line and simulation results are reported.

  • PDF

Multi-factors Bidding method for Job Dispatching in Hybrid Shop Floor Control System

  • Lee, Seok--Hee;Park, Kyung-Hyun;Bae, Chang-Hyun
    • International Journal of Precision Engineering and Manufacturing
    • /
    • 제1권2호
    • /
    • pp.124-131
    • /
    • 2000
  • A shop floor can be considered as and importand level to develop a Computer Integrated Manufacturing system (CIMs). The shop foor is a dynamic environment where unexpected events contrinuously occur, and impose changes to planned activities. The shop floor should adopt an appropriate control system that is responsible for scheduling coordination and moving the manufacturing material and information flow. In this paper, the architecture of the hybrid control model identifies three levels; i.e., the shop floor controller (SFC), the cell controller(CC) and the equipment controller (EC). The methodology for developing these controller is employ an object-oriented approach for static models and IDEF0 for function models for dispatching a job. SFC and CC are coordinated by employing a multi-factors bidding and an adapted Analytic Hierarchy Process(AHP) prove applicability of the suggested method. Test experiment has been conducted by with the shopfloor, consisting of six manufacturing cells.

  • PDF

Customer Order Scheduling Problems on Parallel Machines with Job Capacity Restriction

  • Yang, Jaehwan
    • Management Science and Financial Engineering
    • /
    • 제9권2호
    • /
    • pp.47-68
    • /
    • 2003
  • We consider the customer order scheduling problem with job capacity restriction where the number of jobs in the shop at the same time is fixed. In the customer order scheduling problem, each job is part of some batch (customer order) and the composition of the jobs (product) in the batch is pre-specified. The objective function is associated with the completion time of the batches instead of the completion time of the jobs. We first summarize the known results for the general customer order scheduling problems. Then, we establish some new properties for the problems with job capacity restriction. For the case of unit processing time with the objective of minimizing makespan, we develop a polynomial-time optimal procedure for the two machine case. For the same problem with a variation of no batch alternation, we also develop a polynomial-time optimal procedure. Then, we show that the problems with the objectives of minimizing makespan and minimizing average batch completion time become NP-hard when there exist arbitrary number of machines. Finally, We propose optimal solution procedures for some special cases.

FMC에 계층적 스케쥴링 전략의 적용 (Application of the hierarchical scheduling policy to FMC)

  • 여용기;유준
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 1991년도 한국자동제어학술회의논문집(국내학술편); KOEX, Seoul; 22-24 Oct. 1991
    • /
    • pp.482-487
    • /
    • 1991
  • The scheduling algorithm based on the hierarchical scheduling policy is presented for the Job Shop type FMC control, and the simulation results using this hierarchical scheduling policy are with the results which are based on the heuristic scheduling policy. The results show that the hierarchical ling policy is more efficient than the heuristic scheduling policy in either case that there exist machine failures in the FMC or not.

  • PDF

2단계 혼합흐름공정에서 납기 지연 작업수의 최소화를 위한 분지한계 알고리듬 (A Branch and Bound Algorithm for Two-Stage Hybrid Flow Shop Scheduling : Minimizing the Number of Tardy Jobs)

  • 최현선;이동호
    • 대한산업공학회지
    • /
    • 제33권2호
    • /
    • pp.213-220
    • /
    • 2007
  • This paper considers a two-stage hybrid flow shop scheduling problem for the objective of minimizing the number of tardy jobs. Each job is processed through the two production stages in stages, each of which has multiple identical parallel machines. The problem is to determine the allocation and sequence of jobs at each stage. A branch and bound algorithm that gives the optimal solutions is suggested that incorporates the methods to obtain the lower and upper bounds. Dominance properties are also suggested to reduce the search space. To show the performance of the algorithm, computational experiments are done on randomly generated problems, and the results are reported.

A High Quality Solution Constructive Heuristic for No-Wait Flow Shop Scheduling Problem

  • Nagano, Marcelo Seido;Miyata, Hugo Hissashi
    • Industrial Engineering and Management Systems
    • /
    • 제15권3호
    • /
    • pp.206-214
    • /
    • 2016
  • This paper deals with the no-wait flow shop scheduling problem in order to minimize the total time to complete the schedule or makespan. It is introduced a constructive heuristic which builds the production schedule from job partial sequences by using an appropriate mechanism of insertion. An extensive computational experiment has been performed to evaluate the performance of proposed heuristic. Experimental results have clearly shown that the presented heuristic provides better solutions than those from the best heuristics existing.

FMC에서의 일정계획 시스템의 설계 (Design of Scheduling System for Flexible Manufacturing Cells)

  • 신대혁;이상완
    • 산업경영시스템학회지
    • /
    • 제17권32호
    • /
    • pp.63-71
    • /
    • 1994
  • The purpose of this paper is to describe an effective cell scheduling system for flexible manufacturing cells. Based on the FMC characteristics, cell scheduling can be defined as a dynamic modified flow shop working in a real-time system. This paper attempt to find the optimal cell scheduling when minimizing the mean flow time for n-job/m-machine problems in static and dynamic environments. Real-time scheduling in an FMC environment requires rapid computation of the schedule.

  • PDF

A Flexible Branch and Bound Method for the Job Shop Scheduling Problem

  • Morikawa, Katsumi;Takahashi, Katsuhiko
    • Industrial Engineering and Management Systems
    • /
    • 제8권4호
    • /
    • pp.239-246
    • /
    • 2009
  • This paper deals with the makespan minimization problem of job shops. The problem is known as one of hard problems to optimize, and therefore, many heuristic methods have been proposed by many researchers. The aim of this study is also to propose a heuristic scheduling method for the problem. However, the difference between the proposed method and many other heuristics is that the proposed method is based on depth-first branch and bound, and thus it is possible to find an optimal solution at least in principle. To accelerate the search, when a node is judged hopeless in the search tree, the proposed flexible branch and bound method can indicate a higher backtracking node. The unexplored nodes are stored and may be explored later to realize the strict optimization. Two methods are proposed to generate the backtracking point based on the critical path of the current best feasible schedule, and the minimum lower bound for the makespan in the unexplored sub-problems. Schedules are generated based on Giffler and Thompson's active schedule generation algorithm. Acceleration of the search by the flexible branch and bound is confirmed by numerical experiment.