Several drought indices, which indicate the severity of drought in a reservoir or an irrigated area, have been suggested in home and overseas. However, the indices have not been adopted because those were extremely difficult to be understood by the genera
Proceedings of the Korean Society of Agricultural Engineers Conference
/
2003.10a
/
pp.491-494
/
2003
An Automatic Water Level Measurement System has been developed in this study. It has the characteristics that it use lower power and solar power and it has the ability of sending data and remote-controlled by wireless MODEM this system was set up in the experimental site and was tested. Also, the management system for the water level data has been developed and will be used by instruments administrating reservoirs.
This study was carried out to provide the basic information for the water quality management of Boryeong fresh water reservoir watershed. Nine sub-watersheds were delineated and the water quality of the paddy water and paddy soil of the sub-watersheds wer
Proceedings of the Korea Water Resources Association Conference
/
2010.05a
/
pp.837-841
/
2010
농업용 저수지는 주로 관개용수를 공급하는 역할을 해 왔으나 4대강 살리기 사업의 저수지 둑 높이기로 확보한 저수량을 이용하여 하류하천의 유지유량 공급과 홍수조절용량으로 이용하기 위한 저수지의 운영률 설정을 요구하고 있다. 관개용수를 공급하면서 하천유지유량을 상시공급, 유량부족시 공급, 30일, 60일, 90일 집중 공급 등 시나리오별 공급효과와 홍수기 홍수조절용량을 단계별로 설정하여 각 운영효과를 분석해 저수지 운영률을 합리적으로 설정할 수 있는 방법을 검토하였으며, 탑정저수지와 미호저수지에 대해 적용한 사례를 제시하였다.
Magazine of the Korean Society of Agricultural Engineers
/
v.24
no.1
/
pp.44-52
/
1982
Recently, estuary reserovoirs have been actively constructed in Korea and also in Japan there are a large number of estuary reservoirs constructed. But most of the estuary reservoirs are located at the downstream of a river where geographical condition is best for the construction of an enclosing dam. And an effective utilization of water from the estuary reservoir seems to be difficult even if estuary reservoirs are considered to be the water resources the most available for their watershed. Studies on estuary reservoirs so far have been mainly concentrated on the physical and engineering problems of the dam construction itself. The purpose of the present study is to review the estuary reservoir planning in connection with the water resources development and to study a basis of the planning. First, the levels of water use in Korea and Japan were compared with those of other countries in the world. And then, some representative reservoirs were selected to study the roles of a reservoir and water-using conditions in the watershed. Based on the study, a survey was given on the relation between a dam construction upstream and an estuary reservoir construction downstream of a river. Finally, a comprehensive examination was made of the bases of estuary reservoir planning. (1) The estuary reservoir planning is deeply related to the plan for water use develo- pment in the watershed. After the upstream water resources were fully developed up to the most, water reso- urces development by an estuary reservoir should be started. (2) If an estuary lake has a capacity big enough, it can store flood discharge of the watershed without any loss and become a basic facility that will bring about the maxi- mum use of water from the watershed. (3) Estuary reservoirs store water used in the upstream watershed, so recycling of water use is attained by the reservoir. Water in the estuary lake is difficult to be fresh water in its long run. Therefore, estuary reservoir should be located at a place where polluted water is purified and refused. All the planning should be based on the assumption that water in the estuary lake is not fresh but polluted after a long time. (4) The estuary lake can only supply water to the lower basin directly. But the upstream area is benefited from the estuary lake by exchange of irrigation water sources between the lower and the upper area. So a large-scale exchange plan between new and existing water resources is important. By constructing estuary reservoirs and the exchange of water sources between upper and lower areas, the reasonable maximum use of water from the whole watershed is at- tained. (5) The big problem coming from the water resources development by an enclosing estuary is salt water intrusion into the lake. To maintain the estuary lake salt-free, multi-purpose use of the lake should be avoided. It is necessary to take such fundamental measures as abolition of back flow operation of gate, and the closing of the fish port and the fish ladder. The results mentioned above were found in this study and these results of this study could be used for the adequate planning of estuary reservoirs in connection with the maximum water use of the watershed.
Kim, Jin Uk;Jung, Chung Gil;Lee, Ji Wan;Kim, Seong Joon
Journal of Korea Water Resources Association
/
v.51
no.10
/
pp.839-852
/
2018
The purpose of this study is to predict monthly agricultural reservoir storage by developing weather data-based Multiple Linear Regression Model (MLRM) with precipitation, maximum temperature, minimum temperature, average temperature, and average wind speed. Using Naïve-Bayes classification, total 1,559 nationwide reservoirs were classified into 30 clusters based on geomorphological specification (effective storage volume, irrigation area, watershed area, latitude, longitude and frequency of drought). For each cluster, the monthly MLRM was derived using 13 years (2002~2014) meteorological data by KMA (Korea Meteorological Administration) and reservoir storage rate data by KRC (Korea Rural Community). The MLRM for reservoir storage rate showed the determination coefficient ($R^2$) of 0.76, Nash-Sutcliffe efficiency (NSE) of 0.73, and root mean square error (RMSE) of 8.33% respectively. The MLRM was evaluated for 2 years (2015~2016) using 3 months weather forecast data of GloSea5 (GS5) by KMA. The Reservoir Drought Index (RDI) that was represented by present and normal year reservoir storage rate showed that the ROC (Receiver Operating Characteristics) average hit rate was 0.80 using observed data and 0.73 using GS5 data in the MLRM. Using the results of this study, future reservoir storage rates can be predicted and used as decision-making data on stable future agricultural water supply.
Proceedings of the Korea Water Resources Association Conference
/
2023.05a
/
pp.30-30
/
2023
This study aims to establish the multi-reservoir operation system model in the Upper Mun River Basin which includes 5 main dams namely, Mun Bon (MB), Lamchae (LC), Lam Takhong (LTK), Lam Phraphoeng (LPP), and Lower Lam Chiengkrai (LLCK) Dams. The knowledge and AI technology were applied aiming to develop innovative prototype for SMART dam-reservoir operation in future. Two different sorts of reservoir operation system model namely, Fuzzy Logic (FL) and Constraint Programming (CP) as well as the development of rainfall and reservoir inflow prediction models using Machine Learning (ML) technique were made to help specify the right amount of daily reservoir releases for the Royal Irrigation Department (RID). The model could also provide the essential information particularly for the Office of National Water Resource of Thailand (ONWR) to determine the short-term and long-term water resource management plan and strengthen water security against flood and drought in this region. The simulated results of base case scenario for reservoir operation in the Upper Mun from 2008 to 2021 indicated that in the same circumstances, FL and CP models could specify the new release schemes to increase the reservoir water storages at the beginning of dry season of approximately 125.25 and 142.20 MCM per year. This means that supplying the agricultural water to farmers in dry season could be well managed. In other words, water scarcity problem could substantially be moderated at some extent in case of incapability to control the expansion of cultivated area size properly. Moreover, using AI technology to determine the new reservoir release schemes plays important role in reducing the actual volume of water shortfall in the basin although the drought situation at LTK and LLCK Dams were still existed in some periods of time. Meanwhile, considering the predicted inflow and hydrologic factors downstream of 5 main dams by FL model and minimizing the flood volume by CP model could ensure that flood risk was considerably minimized as a result of new release schemes.
Magazine of the Korean Society of Agricultural Engineers
/
v.13
no.1
/
pp.2191-2205
/
1971
In this research, Nong-rim No. 6 was adopted as a test variety of rice. Rice seedlings were transplanted on June 14, 1970. Roots were settled into soil on June 20 and a total number of days irrigated of $21cm{\times}21cm$ and an area of $9.9m^2$ for a test plot were accepted, planting 70 stumps of rice in a test plot. The soil in test plots are classified by soil test as oam, and its chemical contents are as shown in Table 3. Irrigation water was secured by pumping from the Sudun stream that originates at the Suho reservoir. Accordingly, the qualities of irrigation. water are considered to be the same as those of water stored in the Suho reservoir. There were 54 days of intermittent rainfalls in total during the whole 110-day period of irrigation. As a result, it is likely that the growth of rice plants was influenced by rainfall at a comparatively great degree. In order to measure the amounts of water consumption, infiltrometers, measuring devices for the decreases of water depths and lycimeters were provided. As a result of measurements, an average daily rate of infiltration was observed to be 14mm/day. It is expected from this research that the effect of increased yield will be secured by supplying optimum amounts of water for irrigation on proper times, and that the amounts of water consumption for irrigation can be saved by applying suitable irrigation methods. The test results obtained are summarized as follows: 1. Yields produced in the test plots of continuous irrigation are lower than those in the test plots of rotational irrigation, i.e., yields produced at the test plots irrigatied once in a period of 8 days are higher by 27% in average than those produced at test plots of continuous irrigation. 2. The amounts of irrigation water for test plots, which have a clay layer of 9cm in thickness and vynil diaphragm without holes, are saved by about 52% in comparison with ordinary test plots. 3. Ears are sprouted 5 days earlier at continuous irrigation plots as compared with other test plots. 4. It seems that there are growing stages of rice plants such as those of forming and sprouting of ears, in which the amounts of irrigation water are consumed more in comparison with the other stages. Therefore, it may be possible to increase of decrease the amount of irrigation water, according to the growing stage of rice plant, so as to save irrigation water.
Jeong, Han Seok;Park, Ji Hoon;Seong, Choung Hyun;Jang, Tae Il;Kang, Moon Seong;Park, Seung Woo
Journal of The Korean Society of Agricultural Engineers
/
v.55
no.3
/
pp.91-104
/
2013
The objectives of this study were to monitor and assess the environmental impacts of indirect wastewater reuse on water quality and soil in paddy fields. Yongin monitoring site (YI) irrigated from agricultural reservoir and Osan monitoring site (OS) irrigated with treated wastewater diluted with stream water were selected as control and treatment, respectively. Monitoring results for irrigation water quality showed a significant statistical difference in salinity, exchangeable cation and nutrients. Pond water quality showed a similar tendency with irrigation water except for the decreased difference in nutrients due to the fertilization impact. Soil chemical properties mainly influenced by fertilization activity such as T-N, T-P, and $P_2O_5$ were changed similarly in soil profiles of both monitoring sites, while the properties, EC, Ca, Mg, and Na, mainly effected by irrigation water quality showed a considerable change with time and soil depth in treatment plots. Heavy metal contents in paddy soil of both control and treatment did not exceed the soil contamination warning standards. This study could contribute to suggest the irrigation water quality standards and proper agricultural practices including fertilization for indirect wastewater reuse, although long-term monitoring is needed to get more scientific results.
The coastal alluvial plain, sand dune, tidal nat might be the most prominent coastal landscape in western coast of Korea. The purpose of this paper is to examine the irrigation and drainage systems of the alluvial plain in the tidal coast. This study is concerned on the geomorphological and cultural landscapes of the alluvial plain in the western coast of the South Jeolla Province. The alluvial deposits have developed mainly by the actions of tidal currents, rather than transporting sediments by stream. The transformation of plain has been affected by human agency since 1920's. Dwellers have constructed the reservoir, banks, dammed pools, lock gates, and tide-dykes for the reclamation, irrigation, and drainage on the alluvial plain, coastal sanddune, and tidal flats.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.