• Title/Summary/Keyword: integration of construction

Search Result 846, Processing Time 0.026 seconds

Ontology-based Facility Maintenance Information Integration Model using IFC-based BIM data

  • Kim, Karam;Yu, Jungho
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.280-283
    • /
    • 2015
  • Many construction projects have used the building information modeling (BIM) extensively considering data interoperability throughout the projects' lifecycles. However, the current approach, which is to collect the data required to support facility maintenance system (FMS) has a significant shortcoming in that there are various individual pieces of information to represent the performance of the facility and the condition of each of the elements of the facility. Since a heterogeneous external database could be used to manage a construction project, all of the conditions related to the building cannot be included in an integrated BIM-based building model for data exchange. In this paper, we proposed an ontology-based facility maintenance information model to integrate multiple, related pieces of information on the construction project using industry foundation classesbased (IFC-based) BIM data. The proposed process will enable the engineers who are responsible for facility management to use a BIM-based model directly in the FMS-based work process without having to do additional data input. The proposed process can help ensure that the management of FMS information is more accurate and reliable.

  • PDF

A Study on Integration of Schedule Management and Risk Management (공정관리와 리스크관리의 통합을 위한 기초연구)

  • Jang, Myung-Houn;Youn, You-Sang;Suh, Sang-Wook
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.105-110
    • /
    • 2006
  • It is more effective and more efficient to manage schedule and risk at a same time because many risks occur in construction phase in building construction projects. The objective of this paper is to propose a tool that manages risks in a project management software. The tool is implemented by VBA in Microsoft Project, and enables field managers of a construction project to make schedules and to help to predict risks.

  • PDF

Development on Extension Contents of Construction Information Classification for Containing BIM Elements (건설정보 분류체계의 BIM 수용을 위한 확장목록 개발)

  • Cho, Geun-Ha;Ju, Ki-Beom
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.7
    • /
    • pp.4942-4949
    • /
    • 2015
  • The construction information classification which developed for the purpose of adapting informatization in construction industry suggests construction information with standardization. Currently, standardization of construction information is highly necessary for BIM that is main background of alteration as construction industry informatization. The authors suggest improvement of construction information classification. Particularly, extension contents for each facets are suggested to contain BIM. In case of applying extended classification to BIM, interoperability of information will be enhanced and it is effective to integrate information in phase of using BIM.

The Extension of IFC Model Schema for Geometry Part of Road Drainage Facility (도로 배수시설의 형상정보 표현을 위한 IFC 정보모델 확장 방안)

  • Cho, Geun-Ha;Won, Ji-Sun;Kim, Jin-Uk
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.11
    • /
    • pp.5987-5992
    • /
    • 2013
  • The authors suggest the extension IFC schema of drainage facilities for the purpose of establishment the information model standard for the roads. IFC entities, types and properties for drainage facilities are defined by the analysis of road design documents for extraction physical component and design information IFC schema is able to be extended through the result of this research. Futhermore, IFC for additional road facilities is able to be used as construction process control, quantity take off, and simulation applications with the interoperability of the IFC.

GIS Application for Planning Roadway Construction (도로 공사의 시공계획을 위한 GIS의 적용)

  • Kang Sang-Hyeok;Seo Jong-Won
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.565-568
    • /
    • 2003
  • Roadway construction planning processes involve a large amount of information on design, construction methods, quantities, unit costs, and production rates. GIS (Geographic Information System) is a strong tool for integration and managing various types of information such as spatial and non-spatial data required for roadway construction planning. This paper proposes a GIS-based system for improving roadway construction planning with its 'Spatial Analysis' and 'Visualization' functions. The proposed system cail help construction planner make a proper decision in a unique way by integrating design information and construction information within the system and creating design element modules for space scheduling purposes in real-time with its 'Interactive Planning' function.

  • PDF

Simultaneous and Sequential Integration by Cre/loxP Site-Specific Recombination in Saccharomyces cerevisiae

  • Choi, Ho-Jung;Kim, Yeon-Hee
    • Journal of Microbiology and Biotechnology
    • /
    • v.28 no.5
    • /
    • pp.826-830
    • /
    • 2018
  • A Cre/loxP-${\delta}$-integration system was developed to allow sequential and simultaneous integration of a multiple gene expression cassette in Saccharomyces cerevisiae. To allow repeated integrations, the reusable Candida glabrata MARKER (CgMARKER) carrying loxP sequences was used, and the integrated CgMARKER was efficiently removed by inducing Cre recombinase. The XYLP and XYLB genes encoding endoxylanase and ${\beta}$-xylosidase, respectively, were used as model genes for xylan metabolism in this system, and the copy number of these genes was increased to 15.8 and 16.9 copies/cell, respectively, by repeated integration. This integration system is a promising approach for the easy construction of yeast strains with enhanced metabolic pathways through multicopy gene expression.

IMPACT OF TECHNOLOGY UTILIZATION ON PROJECT OWNER SATISFACTION

  • Li-Ren Yang;Chung-Fah Huang
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.754-757
    • /
    • 2005
  • Construction firms attempt to improve project performance by adopting technology. However, the advantages gained from technology utilization are still not clear. Lack of information regarding technology benefits has resulted in industry reluctance to implement new technology. Therefore, there are needs for studies that quantify the impacts of technology utilization on project performance. An industry-wide survey was used to collect project data from 70 capital facility projects on the issue of technology usage and project owner satisfaction parameter. This paper reports on integration/automation technology usage in the Taiwanese construction industry and associated impacts on project owner satisfaction. In addition, integration and automation technology findings are presented by project phase. The analyses indicate that projects with owner satisfaction have, on average, higher levels of technology utilization than projects with owner dissatisfaction for all technology usage metrics analyzed.

  • PDF

A Study on the Efficient Integration Program between ISO 9000 and ISO 14000 (ISO 9000과 ISO 14000의 효율적인 통합방안에 관한 연구-건설업체 문서체계를 중심으로)

  • 이재훈;강창욱
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.20 no.43
    • /
    • pp.211-218
    • /
    • 1997
  • Since Industrial Revolution, the sudden industrialization and population explosion have brought about a serious environmental pollution on the air of the earth, the quality of water and the soil, and the greenhouse effect by the destruction of the ozone layer and the greenhouse gas, the organism diversity decline, the desertification by the ruining of woods and the overall global environmental pollution such as the contamination of the ocean and rivers have been come to the front. So the new recognition on the environment is being spreaded in construction business and the efforts for certification acquisition of ISO 14000 being followed by ISO 9000 are progressing, Accordingly, with an example of H Company where integration system is built so that it can minimize the efforts and cost at the construction of the management system, operation and management after the fact, this paper shall suggest the practical scheme of 3 steps through a study to integrate both existing quality management system and new environmental management system. As the integration system of the quality and environment which is constructed by this method is executed, the number of the established and managed document is cut by about a third and so the disorder to encounter between these documents is prevented and unnecessary efforts is reduced in constructing a system, consequently the efficiency of the system is accomplished. Also as the dualization of quality management system and environmental management system additionally needs more men and money after certification acquisition, the non-construction of the integration system may give rise to a cause to aggravate the burden of the company and hereafter when a new system is imported, it may be very difficult to integrate the system. This system integration enables a efficient and effective system to be constructed , operated , and managed after the fact.

  • PDF

A Basic Study for Accumulation of IFC-based Schedule Information (IFC 기반의 공정정보 축적을 위한 기초연구)

  • Song, Jong-Kwan;Choi, Won-Sik;Won, Ji-Sun;Kim, Nam-Gon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.11
    • /
    • pp.5890-5896
    • /
    • 2013
  • This Study aimed at suggesting the plan for accumulating and utilizing schedule information of IFC file in BIM-based delivery system. For this Propose, First, literature review is conducted for analyzing utilization plan of schedule information and the IFC standard. Second, Schedule Planning process is analyzed to draw Schedule elements, and schedule information items is derived by analyzing schedule process and commercial software. Also, schedule elements in the IFC schema is derived by analyzing IFC schema through drawn schedule information. Finally, this study suggests a concept model accumulating and utilizing Schedule information included in IFC schema, and a conceptual delivery process of BIM model by analyzing BIM Application Guideline for Facility Project by PPS (Public Procurement Service) for accumulating IFC delivery files This study will expects to contribute to accumulate information of BIM model at the point of nationally introducing BIM.