• 제목/요약/키워드: integrated facility

검색결과 475건 처리시간 0.026초

Design considerations for teleoperation systems operating in gas-tight argon cells

  • Yu, Seungnam;Lee, Jongkwang;Park, Byungsuk;Cho, Ilje;Lee, Hyojik
    • Nuclear Engineering and Technology
    • /
    • 제49권8호
    • /
    • pp.1717-1726
    • /
    • 2017
  • In the nuclear industry, mechanical engineers spend a significant portion of their time designing equipment such as manipulators, bogies, mechanical grippers, and so on. Some customized designs can be considered as standard mechanical equipment in this area, although it is not unusual to find that an existing design cannot simply be copied from one project to another. Varied performance requirements can dictate that redesign, often quite extensive redesign, is required. However, if something similar has been done before, engineers could use that as a starting point for the new project. In this regard, this study presents several guidelines inspired by previous design knowledge for similar development cases. Moreover, this study presents more detailed suggestions such as design guidelines for an argon-based hot cell atmosphere and design experience for a large-scale practical hot cell facility. Design considerations and case studies dealt with in this study are dedicated to teleoperation manipulators that are used at a large-scale argon cell facility for pyroprocess integrated inactive demonstration (PRIDE), at the Korea Atomic Energy Research Institute. In particular, for case studies to support the suggested recommendations, a fabricated telemanipulator system for PRIDE is introduced, and several kinds of experimental results associated with it are presented.

경쟁 기반의 부품 생산과 협업 기반의 완성품 생산 시스템에서 생산과 수요 통제의 통합적 고찰 (Integrated Demand and Production Control for the Competition-based Component and Cooperation-based End Item)

  • 김은갑
    • 산업공학
    • /
    • 제22권4호
    • /
    • pp.368-375
    • /
    • 2009
  • This paper considers a two-stage supply system consisting of two make-to-stock facilities. The facility in the first stage produces a single type of component in anticipation of future demands from the market and the end item production while the facility in the second stage produces the end item in anticipation of future demands from the OEM customers. The facility in the first stage has the option of to accept or reject each incoming demand from the market. In this paper, we address the problem of how to control the exogenous component demand and how to manage the production of the end item and the component so as to maximize the system's profit subject to the system costs. In this paper, we present a heuristic policy that is the base-stock production policy combined with a linear switching curve for component demand control. Numerical study is implemented under different operating conditions of the system and it shows that the performance of the heuristic is very promising compared to that of the optimal policy for the Markov model.

국내외 공공임대주택 커뮤니티 시설의 사회통합적 계획 특성 - 영국, 싱가포르, 한국 사례를 중심으로 - (A Study on the Social Integrative Planning Characteristics of Community Facility in Foreign and Domestic Public Rental Housings - In Cases of England, Singapore and Korea -)

  • 신유진;이희진;조승연;이연숙
    • 대한건축학회논문집:계획계
    • /
    • 제35권7호
    • /
    • pp.3-14
    • /
    • 2019
  • This study is to analyze the social integration plan characteristics of public rental housing community facilities in England, Singapore and Korea. The purpose of this study is to present the direction of social integrated community facility planning and management system for the revitalization of the Korean public rental housing community. To this end, similarities and dissimilarities are derived by comparing cases of community facilities in apartments. Methods of this study include literature survey, analyzed government web sites in overseas cases. Also domestic cases are analyzed qualitatively through field visits, expert interviews, and internal data review. The results of this study are as follows: First, various community facilities plans are needed to accommodate the role of private and public spaces. Second, activate the professional community facilities operation system with public-private cooperation. Third, Community facilities should be planned as local infrastructure.

Development of a Full-Scope Human Machine Simulator for Human Factors Experiments

  • Sim, R.S.;Oh, I.S.;Cheon, S.W.;Park, G.O.;Lee, H.C.;Cha, K.H.;Kim, D.K.;Son, S.W.;Sabri, M.;Paris, H.
    • 한국원자력학회:학술대회논문집
    • /
    • 한국원자력학회 1997년도 춘계학술발표회논문집(1)
    • /
    • pp.219-226
    • /
    • 1997
  • This paper presents the development of an Integrated Test Facility (ITF) that consists of a full-scope Human Machine Simulator (HMS) and some experimental measurement systems. This facility is aimed to experiment with tile design of the control room environment and the human interaction as it relates to the control of advanced nuclear power plants.

  • PDF

Development of Flexible Manufacturing System using Virtual Manufacturing Paradigm

  • Kim, Sung-Chung;Park, Kyung-Hyun
    • International Journal of Precision Engineering and Manufacturing
    • /
    • 제1권1호
    • /
    • pp.84-90
    • /
    • 2000
  • The importance of Virtual Manufacturing System is increasing in the area of developing new manufacturing processes, implementing automated workcells, designing plant facility layouts and workplace ergonomics. Virtual manufacturing system is a computer system that can generate the same information about manufacturing system structure, states, and behaviors as is observed in a real manufacturing. In this research, a virtual manufacturing system for flexible manufacturing cells (VFMC), (which is a useful tool for building Computer Integrated Manufacturing (CIM), has been developed using object-oriented paradigm, and implemented with software QUEST/IGRIP. Three object models used in the system are the product model, the facility model, and the process model. The concrete behaviors of a flexible manufacturing cell are re[presented by the task-oriented description diagram, TIC. An example simulation is executed to evaluate applicability of the developed models, and to prove the potential value of virtual manufacturing paradigm.

  • PDF

Joint Optimal Production-Delivery Policy for Multiple Products with a Single Production Facility

  • Kim Taebok;Hong Yushin
    • 한국경영과학회:학술대회논문집
    • /
    • 한국경영과학회/대한산업공학회 2003년도 춘계공동학술대회
    • /
    • pp.537-541
    • /
    • 2003
  • The synchronization of production-delivery artivities is one of crucial factors to get competitive collaboration benefits between the manufacturer and the retailor(s). There were several researches to study on He optimal delivery policy to minimize the total cost of integrated system of both manufacturer and retailor(s). In this research, we investigate the joint optimal shipment policy in case that a manufacturer produces multiple products sharing a single production facility in the manufacturer side and retailor(s) deploys JIT delivery pattern with equal-size shipment policy. We formulate this problem as a form of 'Common Cycle Approach' in classical ELSP (Economic Lot Scheduling Problem) and provide simple optimal solution procedure.

  • PDF

건설원전 형상관리를 위한 통합변경프로세스 연구 (Research Integrated Change Process for Configuration Management of Construction Nuclear Power Plant)

  • 박유진
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 춘계 학술논문 발표대회
    • /
    • pp.231-232
    • /
    • 2016
  • Configuration Management (CM) is a process of identifying and documenting the characteristics of a Structures, Systems and Components (SSCs), and of ensuring that changes to these characteristics are properly assessed, approved, issued, implemented and verified. There are requirement management, change control, facility configuration information management for CM activities. In order to improve safety of Nuclear Power Plant(NPP), it is necessary to manage change item systematically. Existing CM concept is focused on the NPP in operation. On the other hand, NPP under construction is difficult to efficiently manage the change because of different change process from varoius stake-holders. This research considers method of consolidation change process for NPP to ensure that approved changes are accurately reflected in the design requirements, facility configuration information, and the physical configuration.

  • PDF

컨테이너 터미널의 자원관리를 위한 정보시스템의 분석 및 설계에 관한 연구 (A Study on Analysis and Design Method for Resource Management Information System in Container Terminal)

  • 김헌종;송재성;서만승
    • 한국정보시스템학회:학술대회논문집
    • /
    • 한국정보시스템학회 2000년도 추계학술대회
    • /
    • pp.12-15
    • /
    • 2000
  • An SADT-based methodology is presented for systematically analyzing the container working process in container terminal, as well as an object-oriented design method for an integrated information system for container terminal resource planning and management. Our design architecture is composed of four levels, activity interface, activity PDCA control, human resource management, and facility resource management. Especially, the consideration of the human resource management level makes it possible to support cooperative tasks, to make the authority and responsibility on a task clear, and to extremely promote the balance between human and facility resources. Finally, The system architecture is suggested for Virtual Container Terminal, in which a planned container working process is simulated for previous feasibility check, work orders are transferred to control real devices, and to manage the entire process and related data.

  • PDF

농촌지역 학교시설의 재구성에 대한 사례 연구 -의성군을 중심으로- (A Case Study on the Reorganization of School Facilities in the Rural Area -Focused on Uiseong-gun-)

  • 양금석
    • 한국농촌건축학회논문집
    • /
    • 제13권3호
    • /
    • pp.37-44
    • /
    • 2011
  • This study is to clarify the actual conditions of school facilities in the rural area. The purpose of this paper is to present the direction for reorganization of school facilities. Surbey area was Uiseong, Gyeongbuk, the number of students decreased rapidly. And elementary, middle and high school facilities were surveyed. The results are as the follows; 1)After consider living zone, commuting distance, opinions of residents, it is advisable that the small size school(the number of students under 60) will be combined stronghold school. 2)Reorganization of school facilities should be considered that the characteristics of living zone, exchanging educational program between elementary and middle schools and an integrated use of the facility.

철도시스템의 종합시험운행을 통한 철도안전 확보방안 (A Railway Safety Proposal with Full System Commissioning)

  • 김정주;이희성;문대섭
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2005년도 추계학술대회 논문집
    • /
    • pp.522-527
    • /
    • 2005
  • Rail network authority have to do the safety ensuring activities including the maintenance of railway facility, integrated performance verification between the facilities and related rolling stock and safety inspections, etc. When constructing the new lines or revising the conventional lines, full system commissioning should be done before the revenue service with railway operator. To develop the optimal full system commissioning model, the status of domestic and foreign railway facility and railway accidents are analysed and the problems of the safety management are derived. As one of countermeasures for the problems, the procedures and criteria for the full system commissioning are developed.

  • PDF