• Title/Summary/Keyword: in-line system

Search Result 11,279, Processing Time 0.046 seconds

Stability of Solar Power System on the Control Modes of a Forced-Commutated Inverter and a Line-Commutated Inverter (Solar Power System의 인버터 토폴로지 및 제어 모드에 따른 안정도 연구)

  • Lee, Seung-Hyun;Chung, Gyo-Bum;Cho, Bo-Hyung
    • Proceedings of the KIEE Conference
    • /
    • 1997.11a
    • /
    • pp.534-537
    • /
    • 1997
  • Solar power systems have become popular in the modem electric energy system. In order to supply the DC power, generated by solar cells, to the electric power system, the solar power system requires DC-to-AC power conversion. A line-commutated inverter or a forced-commutated inverter can be used in the DC-to-AC power conversion. Because of the nonlinear V-I characteristics of the solar cells, multiple operating points determined by the control mode of the inverter exist in the DC V-I state plane of the solar power system. In this paper, the stability of utility-interactive solar power system with a line-commutated inverter is analyzed at various operating points, using the eigenvalue method and the state-plane analysis technique. The stability of a forced-commutated inverter case is also anaiyzed and compared to that of the line-commutated inverter case.

  • PDF

Development of Online 3D Wrinkle Measurement System (실시간 3 차원 링클 측정 시스템)

  • Hoang, Huu Phuong;To, Hoang Minh;Ko, Sung-Lim
    • Proceedings of the KSME Conference
    • /
    • 2008.11a
    • /
    • pp.1255-1258
    • /
    • 2008
  • Roll to roll (R2R) system, known as 'web processing', is the process of producing these electronic devices on a roll of flexible plastic. With the need of improved performance and productivity in R2R industry, effective control and on-line supervision for web quality is essential. In this report, we present a system for on-line measurement of wrinkles, one of defects incurring due to compressive stresses developed in the web. This system is able to capture an image generated when a well defined line shape laser beam passes through a transparent web. The system calculates 3D shape information, including the height of the wrinkle on the web, and displays the images for the shape information of the web in real time. By using area scan camera and machine vision laser, this system takes more advantages of setting up as a simple and low cost system compared to the line scan camera systems that widely used in web manufacturing. Specific calibration method and analysis on the achievable accuracy will be discussed.

  • PDF

Pressure Control of a Pneumatic Conrol system with a long Transmission Line (긴 전달관로를 갖는 공압제어계의 압력 제어)

  • Jang, Ji-Seong;Lee, Kwang-Kuk;Choi, Myung-Soo
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.27 no.4
    • /
    • pp.567-576
    • /
    • 2003
  • In this study, a robust controller to control pressure in a pneumatic pressure vessel with a long transmission line is proposed. Frequency response of transmission line using compressible fluid is changed by the flowing state of the fluid. So, it a fixed gain controller designed based on a model supposed the flowing state to a specific state, the performance of the control system could be degraded because of the modelling error. The controller designed in this study is composed of two parts. One is a feedback controller to improve a feedback characteristics and to compensate the influence of the variation of transfer characteristics of a transmission line owing to the change of flowing state and the other is a feedforward controller to regulate command fallowing performance. The experimental results with the designed controller show that the robustness of the control system is achieved regardless of the change of the model or the transmission line. Therefore, the designed controller can be utilized for the Performance improvement of a Pressure control system with a long transmission line using compressible fluid.

A Case Study on Failure and Analysis of Air Over Hydraulic Brake Line (공기 유압식 브레이크 라인 파손 사례 및 파손 분석 연구)

  • Park, Jeongman;Park, Jongjin
    • Journal of Auto-vehicle Safety Association
    • /
    • v.12 no.2
    • /
    • pp.47-55
    • /
    • 2020
  • In this case study, the brake line failure of air over hydraulic(AOH) brake system is described. AOH brake system is applied to commercial vehicles between 5 to 8 tons. It consists of a hydraulic system using compressed air and operates the air master to form hydraulic pressure to transfer braking power to the wheels. When the brake lines of the system applied to vehicles with high load capacity are damaged, the braking force of one shaft is lost, and the braking distance increases rapidly, leading to a big accident. Failure of the brake line occurs due to various causes such as road surface fragmentation, corrosion of the line, and aged deterioration of air brake hose. The braking force could be decreased even when a very small break in the form of a pin-hole occurs. However, it is difficult to find a part where the thickness of the line is thin due to stone pecking or corrosion generated in the pin-hole formed on the brake line located under the lower part of the vehicle by the sensory evaluation or the conventional braking force test. Accordingly, it is necessary to analyze the condition and cause of the failure of the brake line more precisely when the accident investigation of the heavy vehicles, and also to examine the necessity of the advanced test for the aged brake line.

Study for trial project of Intelligent Train Control System (MBS) at Korail Bundang Line (분당선 지능형열차제어시스템 (MBS) 시범설비구축 사업에 관한 고찰)

  • Kim, Yun-Bae;Yoon, Ho-Sok
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.339-342
    • /
    • 2008
  • In this paper, the lessons and learns are introduced from the result of the trial project which is the first CBTC(Communication Based Train Control System) at Korail Bundang Line. This project has started end of 2002 and finished recently by Samsung SDS. The main purpose of this project was that new technology was seek for next generation of railway signal control system adapted in Korea. In 2002, there was no any revenue service system using Radio Frequency CBTC in the world at that time. Just a few trial project was on going in USA and EU. In well developed cities, the metro system have been built and old enough therefore they have to be considering re-signalling their existing system with advanced system for increasing availabilities of line usage and safety. This Bundang Line Trial Project was the first Korean CBTC project for above reasons. Most sub systems have been developed using local technology such as Electronics Controlled Interlocking System and Track Circuit Systems etc. Specially, in this project the RF-Communication devices are developed by local technology using DSSS(Direct Sequency Spread Spectrum) instead of FHSS(Frequency Hopping Spread Spectrum). This project has lasted for more than five years originally planned for three years because it was only accessible only night time in the main line from Ori to Suseo about 20km long. Each night only 2 and half hours are available to use the main line. Now the trial project has been done successfully with meet the customer's requirement, therefore the upgrade the mainline of Bundang line and another extension area up to Wangsipli to make revenue service using this new technology. This paper shows this result of the trial project and the strategy of upgrade and extension project as well.

  • PDF

A Mathematical Model for Converting Conveyor Assembly Line to Cellular Manufacturing

  • Kaku, Ikou;Gong, Jun;Tang, Jiafu;Yin, Yong
    • Industrial Engineering and Management Systems
    • /
    • v.7 no.2
    • /
    • pp.160-170
    • /
    • 2008
  • This paper proposes a mathematical model for converting conveyor assembly line to cellular manufacturing in complex production environments. Complex production environments refer to the situations with multi-products, variant demand, different batch sizes and the worker abilities varying with work stations and products respectively. The model proposed in this paper aims to determine (1) how many cells should be formatted; (2) how many workers should be assigned in each cell; (3) and how many workers should be rested in shortened conveyor line when a conveyor assembly line should be converted, in order to optimize system performances which are defined as the total throughput time and total labor power. We refer the model to a new production system. Such model can be used as an evaluation tool in the cases of (i) when a company wants to change its production system (usually a belt conveyor line) to a new one (including cell manufacturing); (ii) when a company wants to evaluate the performance of its converted system. Simulation experiments based on the data collected from the previous documents are used to estimate the marginal impact that each factor change has had on the estimated performance improvement resulting from the conversion.

Preliminary Design of mooring line in floating wave energy farm (부유식 파력발전단지 조성을 위한 계류선 초기설계)

  • Jung, DongHo;Song, JaeHa;Shin, SeungHo
    • Journal of Ocean Engineering and Technology
    • /
    • v.27 no.6
    • /
    • pp.16-21
    • /
    • 2013
  • In this paper, the mooring system for a floating wave energy farm is designed based on a two-dimensional analysis. The mooring system uses an anchorless mooring line linking two floaters in a floating wave energy farm. The basic equation to determine the length of the mooring line between the two floaters is proposed. The other properties such as the diameter and pretension are taken from the mooring line for a single floater. The dynamic behavior and safety of the designed mooring system under extreme ocean conditions are analyzed with the commercial software Orcaflex. A numerical study shows the stability and high safety in tension of the designed mooring lines for a floating wave energy farm. The proposed anchorless mooring system for a floating wave energy farm results in a considerable reduction in the length of the mooring line, contributing to the economics of a floating wave energy farm.

Force Control of a Pneumatic Driving System With a Long Transmission Line (전달관로를 고려한 공기압 구동장치의 힘 제어에 관한 연구)

  • Jang, J.S.
    • Transactions of The Korea Fluid Power Systems Society
    • /
    • v.8 no.3
    • /
    • pp.8-13
    • /
    • 2011
  • In the present study, a robust controller has been designed to control force for a pneumatic driving system considering the effect of a transmission line. Transfer characteristics of pneumatic transmission line should be changed according to the velocity of the air going through the transmission line. The designed controller is composed of two parts. The one is a feedback controller, which is composed of a stabilizing filter, a compensating filter of modelling error and a nominal model of the force control system, to compensate the influence of transmission line and improve the feedback characteristics of the control system, and, the other is a feedforward controller to achieve the control performance. Control results with the designed controller show that the robustness and performance of the control system are improved compared to the control results with a fixed gain controller.

Development of the Technical Calculation System for Transmission Line in Myanmar (미얀마 송전선로 설계 기술계산시스템 개발)

  • Baik, Seung-Do;Min, Byeong-Wook;Kim, Jong-Hwa;Shin, Tai-Woo;Kim, Sae-Hyun;Park, Jae-Ung
    • Proceedings of the KIEE Conference
    • /
    • 2005.07a
    • /
    • pp.632-634
    • /
    • 2005
  • Korea takes part in overseas business by use of accumulated advanced technology through construction of the worlds first 765kV double circuit transmission system designed with pure local technology. 'Development Study on the Power System Network Analysis in Myanmar' was received in the year 2001 and was completed in the year 2002. The following project,'Feasibility Study and Basic Designs for the 500kV Transmission System in Myanmar' has been in progress since January, 2004. With regards to this project the master plan for the Myanmar long term power system was submitted in January 2005, and now the basic designs for the 500kV transmission system construction are in progress. Technical data for the design of the transmission line is calculated using a very complex numerical formula that is almost impossible to be completed by hand. So the transmission technical calculation system was developed to calculate and support Myanmar technical data for the design of transmission line with respect to factors such as wind prossure load, tower design data conductor design data and insulator design data on the basis of weather conditions for the Myamar transmission line design area of the Myanmar 500kV trans- mission line construction basic design.

  • PDF

New Technology on Routing and Surveying a 765kV Transmission Line (765kV 송전선로 경과지선정 및 설계측량에 신기술 도입 적용)

  • Lee, Seog-Kyu;Kim, Choon-Gu;Kang, Hee-Kwon;Kim, Jeong-Ho
    • Proceedings of the KIEE Conference
    • /
    • 1997.07c
    • /
    • pp.822-824
    • /
    • 1997
  • The routing and surveying a transmission line should be done in advance of its construction. It is getting more difficult to construct transmission line day by day, due to the rapid increase of people's demand resulting from the recent change of social environment and people's consciousness. In order to solve these complicated conditions actively and rationally, it is necessary to be more scientific, objective and computerizable for the routing and surveying of a transmission line. New technologies on routing and surveying a 765kV transmission line are remote sensing, Global Positioning System and Optimal PowerLine system. Thanks to these technologies, there will be a contribution to making sure of the best quality and developing technolo91r of transmission line.

  • PDF