• 제목/요약/키워드: improvement method

검색결과 14,198건 처리시간 0.04초

노후 단독주택의 난방에너지 효율 개선을 위한 대안 선정 방법에 관한 연구 (Alternative Selection Method for Energy Efficiency Improvement of Old Detached House)

  • 황석호
    • 한국태양에너지학회 논문집
    • /
    • 제39권2호
    • /
    • pp.45-55
    • /
    • 2019
  • More than 76% of the detached houses in Korea are over 20 years old. These old detached houses have poor energy efficiency. According to the 2017 Housing Census (Statistics Korea), more than 50% of low-income families live in detached houses. Therefore, the improvement of energy efficiency in old detached houses is needed from the viewpoint of energy welfare. The general method of building energy modelling for the verification of energy efficiency is based on the construction year data of "Building Design Criteria for Energy Saving" due to the cost and time involved in collecting the thermal performance data of buildings. There is poor accuracy with the deterioration of long-term aging of building materials. Also, the selection of alternatives for energy performance improvement is based on the items to be applied, not a performance improvement goal. It is difficult to calculate energy performance that reflects variations in various parameters with dynamic energy simulations. In this study, the influence of long-term aging is used to accurately predict the energy performance of old detached houses. The building energy modelling method is called ENERGY#, which is a static analysis method based on ISO13790. Energy performance is evaluated by a combination of input variables including building orientation, insulation of walls and roof, thermal performance of windows and window/wall ratio, and infiltration rate. Finally, this study provides a way to determine alternatives that meet energy performance improvement goals.

제조공정계획의 품질개선기법에 관한 연구 (A Study on Quality Improvement Method for Manufacturing Process Plan)

  • 김인호
    • 한국CDE학회논문집
    • /
    • 제13권3호
    • /
    • pp.235-242
    • /
    • 2008
  • This paper proposes a method for improving the process plan quality by use of dimensional tolerances. Dimensioning and tolerancing plays a key role in manufacturing process plan because the final part must ensure conformance with the dimensions and tolerances in its drawing. As a first step for the improvement of process plan quality, two resultant tolerances in design and process plan should be compared each other, and so a tolerance chart is used for acquisition and comparison of the two tolerances. In addition to two kinds of design and manufacturing tolerances, operational sequences or paths for the resultant dimension and tolerance are additionally recognized for measuring the quality of process plan quantitatively. Rooted tree is applied to find the related paths for the manufacturing resultant tolerances. A quality coefficient is defined by the components of two tolerances and their relations, the paths related to manufacturing resultant tolerances and the difficulty of an operation. In order to improve the quality of manufacturing process plan, the paths that two kinds of tolerances are the same or different in the rooted tree are recognized respectively and a method for tolerance rearrangement is developed. A procedure for improving the quality is suggested by combining the coefficient and the tolerance rearrangement method. A case study is applied to illustrate the efficiency of improvement method.

Eigen - Environment 잡음 보상 방법을 이용한 강인한 음성인식 (Robust Speech Recognition using Noise Compensation Method Based on Eigen - Environment)

  • 송화전;김형순
    • 대한음성학회지:말소리
    • /
    • 제52호
    • /
    • pp.145-160
    • /
    • 2004
  • In this paper, a new noise compensation method based on the eigenvoice framework in feature space is proposed to reduce the mismatch between training and testing environments. The difference between clean and noisy environments is represented by the linear combination of K eigenvectors that represent the variation among environments. In the proposed method, the performance improvement of speech recognition systems is largely affected by how to construct the noisy models and the bias vector set. In this paper, two methods, the one based on MAP adaptation method and the other using stereo DB, are proposed to construct the noisy models. In experiments using Aurora 2 DB, we obtained 44.86% relative improvement with eigen-environment method in comparison with baseline system. Especially, in clean condition training mode, our proposed method yielded 66.74% relative improvement, which is better performance than several methods previously proposed in Aurora project.

  • PDF

CGS공법에 의한 해성점토 및 준설매립지반의 기초보강 사례 (Case Study for Improvement of Marine Clay and Dredgedfill Ground by CGS Method)

  • 신은철;정덕교;서귀창;이명신
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2010년도 춘계 학술발표회
    • /
    • pp.480-488
    • /
    • 2010
  • The CGS method is non-discharge replacement method improving ground stiffness by the effect of static compaction with injecting very low slump mortar into ground, and is applied for increasing bearing capacity and filling ground cavity by lifting or restoring differential settled structures and preventing differential settlement. This paper suggests design of ground improvement and construction case history for civil engineering structures by CGS method. This method can be used for reinforcing soft ground and liquefaction of loose sandy soil. This method was used in SongDo area in Incheon Economic Free Zone due to its low vibration of ground while it can improve the soft soil where underground structures(subway and box culvert) are already existed.

  • PDF

센서방식 태양광 발전시스템의 효율개선을 위한 새로운 추적알고리즘 개발 (Development of a novel tracking for efficiency improvement of PV system with sensor method)

  • 장미금;고재섭;최정식;강성준;백정우;정동화
    • 한국조명전기설비학회:학술대회논문집
    • /
    • 한국조명전기설비학회 2009년도 춘계학술대회 논문집
    • /
    • pp.424-427
    • /
    • 2009
  • This paper reposes a novel tracking algerian for efficiency improvement of photovoltaic(PV) system using sensor method PV system of sensor method is exactly impossible to track a sun position when insolation is low or rapidly changed by the clouds and fogs. Also, in this case, tracking device is occurred energy consumption by unnecessary operating. This statement of reason, real power of PV system is not increased than fixed PV system in specified location. Therefore, this paper proposes a novel ticking algorithm considered insolation for efficiency improvement of PV system using sensor method And this paper analyzes the generation volume and proves the validity of proposed algorithm as compared with the conventional PV tracking system using sensor method.

  • PDF

센서방식 태양광 발전시스템의 효율개선을 위한 새로운 추적알고리즘 개발 (Development of a Novel Tracking for Efficiency Improvement of PV System with Sensor Method)

  • 최정식;고재섭;정동화
    • 전기학회논문지
    • /
    • 제58권11호
    • /
    • pp.2192-2199
    • /
    • 2009
  • This paper proposes a novel tracking algorithm for efficiency improvement of photovoltaic(PV) system using sensor method. PV system of sensor method is exactly impossible to track a sun position when insolation is low or rapidly changed by the clouds and fogs. Also, in this case, tracking device is occurred energy consumption by unnecessary operating. This statement of reason, real power of PV system is not increased than fixed PV system in specified location. Therefore, this paper proposes a novel tracking algorithm considered insolation for efficiency improvement of PV system using sensor method. And this paper analyzes the generation volume and proves the validity of proposed algorithm as compared with the conventional PV tracking system using sensor method.

공공 IT 프로젝트 수발주 제도의 개선방안 연구 (A Study on the Innovative Scheme of the Public IT Project Ordering and Receiving Systems)

  • 오종우;노규성;김신표
    • 디지털융복합연구
    • /
    • 제4권2호
    • /
    • pp.97-108
    • /
    • 2006
  • The purpose of this study is to generate a proper regulation improvement direction of the public If project contract law through the current four contract methods and three methods of the awarding party of a contract method. The research method for this paper is derived from the written materials of the present public IT project contract law. Two problems have been processed in order to produce the results: the current contract methods and the awarding party of a contract method. The current contract methods consist of a competition contract, a private contract, and a supply methodology contract, The methods of the awarding party of a contract display a qualified evaluation regulation, the 2nd step competition bid, a standard cost separation tender, and a contract by a negotiation. The results exhibit that the general competition contract consists of four improvement items. The contract by a negotiation contains five improvement items. The group private contract has one improvement item. And the private contract includes one improvement item. These results implicate that the current public IT project contract law demands better improvement work for the ubiquitous Korea.

  • PDF

공공IT 프로젝트 수발주 제도의 법제화 방안 연구 (A Study on the Legislation Scheme of the Public IT Project Ordering and Receiving Systems)

  • 오종우;노규성;손동권;김신표;이근배;박영민
    • 한국디지털정책학회:학술대회논문집
    • /
    • 한국디지털정책학회 2006년도 춘계학술대회
    • /
    • pp.319-353
    • /
    • 2006
  • The purpose of this study is to generate a proper regulation improvement direction of the public IT project contract law through the current four contract methods and three methods of the awarding party of a contract method. The research method for this paper is derived from the written materials of the present public IT project contract law. Two problems have been processed in order to produce the results: the current contract methods and the awarding party of a contract method. The current contract methods consist of a competition contract, a private contract, and a supply methodology contract. The methods of the awarding party of a contract display a qualified evaluation regulation, the 2nd step competition bid, a standard cost separation tender, and a contract by a negotiation. The results exhibit that the general competition contract consists of four improvement items. The contract by a negotiation contains five improvement items. The group private contract has one improvement item. And the private contract includes one improvement item. These results implicate that the current public IT project contract law demands better improvement work for the ubiquitous Korea.

  • PDF

다양한 형상의 동일 기종 항공기에 대한 성능개량 최적 구현 방안 연구 (The Study of Optimal Performance Improvement Method for Aircraft of Various Variants within the Same Type)

  • 김영일;안승범;최명석
    • 한국군사과학기술학회지
    • /
    • 제25권3호
    • /
    • pp.311-320
    • /
    • 2022
  • In this paper, we studied the optimal method of improving performance for aircraft having various variants within the same type. The study defined configuration of an entire fleet of aircraft being subject to a performance improvement program. And selected the most complicated aircraft configuration among them as a Standard Aircraft for modification by according to the proposed Aircraft Selection Process for developing an optimal Aircraft Performance Improvement Process. Based on the selected the Standard Aircraft, drew a system integration design result and carried out Evaluation Test and obtained Airworthiness Certification. Created the database with the design data of the Standard Aircraft, Evaluation Test, and Airworthiness Certification results, and applied it to variants of aircraft to complete the performance improvement program with optimized schedules and costs. By applying the proposed method to IFF performance improvement program, drew optimal system integration design and completed the program with minimized schedule.

지하철 고가부 자갈도상 분기기 궤도구조의 생력화 방안(I) (A Study on an improvement of Ballast Track turnout in Subway bridge(I))

  • 성덕룡;최정열;김준형;박용걸
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 춘계학술대회 논문집
    • /
    • pp.325-339
    • /
    • 2007
  • This paper presents the analysis results to evaluate the application of separation sleeper boot of turnout in concrete track in subway. An analysis includes the dynamic load on turnout-bridge and the ballast improvement method of upbound and down line independent girder in servicing line. From the results, the aspect and the property of separation sleeper boot of turnout are evaluated. FE analysis explain the relationship between independent bridge and track behaviour of dynamic loads. The assessment of application based on FE analysis results in a good improvement method of servicing subway line is proposed.

  • PDF