• Title/Summary/Keyword: hydrologic model

Search Result 782, Processing Time 0.026 seconds

Design Parameters of Small Hydro Power Sites for River Systems(II) (소수력발전입지의 수계별 설계변수 특성(II))

  • Park, Wan-Soon;Lee, Chul-Hyung
    • Journal of the Korean Solar Energy Society
    • /
    • v.31 no.3
    • /
    • pp.42-47
    • /
    • 2011
  • Small hydropower resources for five major river systems have been studied. The model, which can predict flow duration characteristic of stream, was developed to analyze the variation of inflow caused from rainfall condition. And another model to predict hydrologic performance for small hydropower(SHP) plants is established. Monthly inflow data measured at Andong dam were analyzed. The predicted results from the developed models in this study show that the data were in good agreement with measured results of long term inflow at Andong dam. It was found that the models developed in this study can be used to predict the available potential and technical potential of SHP sites effectively. Based on the models developed in this study, the hydrologic performance for small hydropower sites located in river systems have been analyzed. The results show that the hydrologic performance characteristics of SHP sites had some difference between the river systems. Especially, the specific design flow and specific output of SHP sites located on North Han river and Nakdong river systems had large difference compared with other river systems.

Operational Improvement of Small Urban Storm Water Pumping Station (1) - Simulation of Flood Hydrograph using GIS-based Hydrologic Model (도시 소유역 배수펌프장 운영개선 방안 연구 (1) - GIS 기반 수문모형에 의한 홍수유출수문곡선의 재현)

  • Gil, Kyung-Ik;Han, Jong-Ok;Kim, Goo-Hyun
    • Journal of Korean Society on Water Environment
    • /
    • v.21 no.6
    • /
    • pp.682-686
    • /
    • 2005
  • Recently some urban areas have been flooded due to heavy storm rainfalls. Though major causes of these floodings may be attributed to localized heavy rainfalls, other factors are related to urban flooding including deficiency of storm sewer network capacity, change of surface runoff due to covered open channels, and operational problems of storm drainage pump stations. In this study, hydrologic and hydraulic analysis of Sutak basin in Guri city were carried out to evaluate flooding problems occurred during the heavy storm in July, 2001. ArcView, a world most widely used GIS tool, was used to extract required data for the hydrologic analysis including basin characteristics data, concentration times, channel routing data, land use data, soil distribution data and SCS runoff curve number generation from digital maps. HEC-HMS, a GIS-based runoff simulation model, was successfully used to simulate the flood inflow hydrograph to Sutak pumping station.

Characteristic Analysis of Small Hydro Power Resources for River System (수계별 소수력자원의 특성 분석)

  • Park, Wan-Soon;Lee, Chul-Hyung
    • 한국태양에너지학회:학술대회논문집
    • /
    • 2011.04a
    • /
    • pp.235-240
    • /
    • 2011
  • Small hydropower resources for five major river systems have been studied. The model, which can predict flow duration characteristic of stream, was developed to analyze the variation of inflow caused from rainfall condition. And another model to predict hydrologic performance for small hydropower(SHP) plants is established. Monthly inflow data measured at Andong dam were analyzed. The predicted results from the developed models in this study showed that the data were in good agreement with measured results of long term inflow at Andong darn. It was found that the models developed in this study can be used to predict the available potential and technical potential of SHP sites effectively. Based on the models developed in this study, the hydrologic performance for small hydropower sites located in river systems have been analyzed. The results show that the hydrologic performance characteristics of SHP sites have some difference between the river systems. Especially, the specific design flowrate and specific output of SHP sites located on North Han river and Nakdong river systems have large difference compared with other river systems.

  • PDF

Development of a Cell-based Long-term Hydrologic Model Using Geographic Information System(I) -Cell-based Long-term Hydrologic Modeling- (지리정보시스템을 이용한 장기유출모형의 개발(I) -장기유출의 격자 모형화-)

  • 최진용;정하우
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.39 no.1
    • /
    • pp.64-74
    • /
    • 1997
  • A CELTHYM(CEll-based Long-term HYdrologic Model), a pre-processor and a post-processor that can be integrated with geographic information system(GIS) were developed to predict the stream flow from the small agricultural watershed on the daily basis. The CELTHYM calculates the direct runoff from a grid using SCS curve number method and then sum up all of cells with respect to a sub-catchment area belonged to a stream grid and integrated to an outlet. Base flow of a watershed outlet was computed by integrating of the base flow of each stream grid that was averaged the sub-catchment deep-percolation and calculated with the release rate. Two kind of water budget equation were used to compute the water balance in a grid that was classified into not paddy field and paddy field. One of the two equation is a soil water balance equation to account the soil moisture of the upland, forest and excluding paddy field grid. The other is a paddy water balance equation for the paddy field, calculating the ponding depth, the effective rainfall, the deep percolation and the evapotranspiration.

  • PDF

Analysis of Performance Characteristic for Small Scale Hydro Power Plant with Long Term Inflow Condition Change (장기유입량 변화에 의한 소수력발전소 성능특성분석)

  • Park, Wan-Soon;Lee, Chul-Hyung
    • New & Renewable Energy
    • /
    • v.5 no.4
    • /
    • pp.39-43
    • /
    • 2009
  • The variation of inflow at stream and hydrologic performance for small scale hydro power(SSHP) plants due to climate change have been studied. The model, which can predict flow duration characteristic of stream, was developed to analyze the variation of inflow caused from rainfall condition. And another model to predict hydrologic performance for SSHP plants is established. Monthly inflow data measured at Andong dam for 32 years were analyzed. The existing SSHP plant located in upstream of Andong dam was selected and analyzed hydrologic performance characteristics. The predicted results from the developed models show that the data were in good agreement with measured results of long term inflow at Andong dam and the existing SSHP plant. Inflow and ideal hydro power potential had increased greatly in recent years, however, these did not lead annual energy production increment of existing SSHP plant. As a results, it was found that the models represented in this study can be used to predict the primary design specifications and inflow of SSHP plants effectively.

  • PDF

Effects of subbasin spatial scale on runoff simulation using SWAT

  • Tegegne, Getachew;Kim, Youngil;Seo, Seung Beom
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2018.05a
    • /
    • pp.156-156
    • /
    • 2018
  • The subbasin spatial scale can affect a hydrological simulation result. The objective of this study was to investigate an appropriate subbasin spatial scale for reproducing the different flow phases with the Soil and Water Assessment Tool (SWAT). Moreover, this study addressed the total hydrologic model uncertainty using the Generalized Likelihood Uncertainty Estimation (GLUE) method. The hydrologic modelling uncertainty analysis revealed that the courser subbasin spatial scale provided a relatively better coverage of most of the observations by the 95PPU. On the other hand, the finer subbasin spatial scale produced the best single simulation output closer to the observation. Moreover, most of the observed high flows were enveloped by the 95PPU while this did not happen for the low flows. The overall average performance improvement through an appropriate subbasin spatial scale for reproducing the different flow phases in the Yongdam and Gilgelabay watersheds were found to be 36% and 53%, respectively. It is, therefore, a worth that to put more effort in reproducing the different flow phases by investigating an appropriate subbasin spatial scale to improve our understanding about the frequency and magnitude of the different flow phases.

  • PDF

Application of Storm Runoff Model on Small Watershed by Finite Element Method (유한요소법에 의한 소유역 유출모형의 적용)

  • 최진규;손재권
    • Water for future
    • /
    • v.25 no.3
    • /
    • pp.97-104
    • /
    • 1992
  • The distributed hydrologic models are widely applied to estimate the storm-runoff with spatial variability in watershed characteristics and rainfall pattern. This study was aimed to introduce the event-oriented storm runoff model using finite element method, and to try it's applicability on small watershed. Yeonwha watershed was selected and 14 storm events in 1991 were used for the finite element model, and the simulation results were compared with hydrologic quantities.

  • PDF

Assessment of the Impacts of the Impervious Surface Change in the Farm Region on Watershed Hydrology (농경지 불투수면 변화에 따른 유역 수문 영향 분석)

  • Kim, Hak-Kwan;Lee, Eun-Jeong;Park, Seung-Woo;Kang, Moon-Seong
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.51 no.6
    • /
    • pp.17-23
    • /
    • 2009
  • The Soil and Water Assessment Tool (SWAT) model was used in this study to evaluate the hydrologic impacts by the impervious surface change in the farm region. The model was calibrated and validated by using four years (1999-2002) of measured data for the Gyeongancheon watershed in Korea. The simulation results agreed well with observed values during the calibration and validation periods. Land use scenarios including various changes of the plastic film house area in the farm region were applied to assess their effects on watershed hydrology. The results indicated that the surface direct (5.6%~14.0%) and total runoff (0.8%~1.5%) increased, but the groundwater discharge (10.7%~27.7%) and evapotranspiration (1.5%~3.3%) decreased as the plastic film house area (5.7%~12.4%) increased.

Development of a Cell-based Long-term Hydrologic Model Using Geographic Information System(III) - Data Construction and Model Application - (지리정보시스템을 이용한 장기유출모형의 개발(III) -자료의 구축 및 모형의 적용-)

  • 정하우;최진용;김대식
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.39 no.3
    • /
    • pp.52-63
    • /
    • 1997
  • A CELTHYM(CEll-based Long-Term HYdrologic Model), a pre-processor and a post processor that can be integrated with geographic information system ( GIS) were developed to predict the stream flow of the small watershed. The CELTHYM was calibrated and verified with measured runoff data at the WS # 1 and WS # 3 that are testing water sheds of Seoul Nat' 1 Univ., dept. of agricultural engineering, in Ansan city, Kyunggi province, South Korea. The results of tests are in good agreement with measured data and usable for other application, but the component of direct runoff and water balance on paddy fields need more study.

  • PDF