• Title/Summary/Keyword: high-speed railway system

Search Result 1,178, Processing Time 0.03 seconds

Reducing Harmonics of the Next-generation High-speed Railway Inverter System by Random Pulse Position Modulation Technique based on Space Vector Modulation (Random Pulse Position PWM 방식을 적용한 IPMSM 기반 차세대 고속전철 구동 인버터 시스템의 고조파 저감)

  • Lee, Sang-Hyun;Jin, Kang-Hwan;Kim, Sung-Je;Kno, Ae-Sook;Kim, Yoon-Ho
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.26 no.6
    • /
    • pp.94-101
    • /
    • 2012
  • In this paper, The Next Generation High Speed Railway inverter system based on IPMSM drives using Random Pulse Position Modulation is proposed to reduce electromagnetic noise. To verify the validity of study, the simulator for the proposed system is designed and impplemented. Simulation program is developed using Matlab/Simulink. The simulation results of the proposed system was compared with the system using conventional method. The results show that the voltage and current harmonics of the proposed Next Generation High Speed Railway Inverter system. significantly decrease and spread into wide band area by the proposed Random Pulse Position modulation technique based on Space Vector Modulation method.

Applying Hybrid Type Energy Storage System in AC High Speed Railway (하이브리드 타입 에너지 저장장치의 교류 고속철도 적용)

  • Jeon, Yong-Joo;Kang, Byoung-Wook;Chai, Hui-Seok;Kim, Jae-Chul
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.28 no.9
    • /
    • pp.60-66
    • /
    • 2014
  • In case of DC railway, value of ESS(Energy Storage System) is already approved. Whereas AC railway system, there are a lot of differences such as system design and operation pattern. Therefore there is doubt about AC ESS usefulness. Especially, regenerative energy can return to the source. So in case of AC 25kV system, it is necessary to consider different operation algorithm compare to DC railway system. In this paper ESS which is installed in AC high-speed railway was introduced. Power consumption pattern of High speed trains were analyzed, proper storage material was reviewed and operation algorithm was suggested. Super capacitor and Battery was used with hybrid type. Super capacitor was used to handle short term energy movement because of its prompt response and battery was used to handle long term energy movement because of its high energy density. Also in case of operation algorithm, phase control method was upgraded compare to voltage magnitude detection method.

A Study on Fault Diagnosis and Performance Evaluation of Propulsion Equipment (추진장치의 고장진단과 성능특성에 관한 연구)

  • Han, Young-Jae
    • Journal of the Korean Institute of Electrical and Electronic Material Engineers
    • /
    • v.18 no.2
    • /
    • pp.153-158
    • /
    • 2005
  • Recently, as the feasibility study shows that trans-Korea railway and trans-continental railway are advantageous, interest in high-speed railway system is increasing. Because railway vehicle is environment-friendly and safe compared with airplane and ship, its market-sharing increases gradually. KHST(Korean High Speed Train) has been developed by KRRI (Korea Railroad Research Institute) for last 6 years to satisfy the need. An electric railway system is composed of high-tech subsystems, among which main electric equipment such as transformers and converter are critical components determining the performance of rolling stock. We developed a measurement system for on-line test and evaluation of performances of KHST. The measurement system is composed of software part and hardware part. Perfect interface between multi-users is possible. A now method to measure temperature was applied to the measurement system. By using the system, fault diagnosis and performance evaluation of electric equipment in Korean High Speed Train was conducted during test running.

Precast Full Span Construction of Continuous PSC Box Girder Bridge for High Speed Railway (고속철도 PSC 박스거더 연속고의 프리캐스트 경간 일괄 가설)

  • Park Jeong Wha;Kim Kwang Soo;Sim Chungwook;Yoon Chul-Soo
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.1168-1173
    • /
    • 2004
  • Bridges and tunnels mainly compose the structural system of Kyung-bu high-speed railway in Korea and the prestressed concrete box girder bridges are applied for the most part of bridge structures. Precast full span construction method was practiced in the construction of many prestressed concrete box girder bridges in Kyung-bu high speed railway for the high quality, great construction speed, low construction cost and construction safety. However, there have been no application of this method in continuous bridges until now. Therefore, a new advanced precast full span construction method is developed using pre-tensioning for precast and post-tensioning in alternating the simple span into a continuous bridge system. since the high-speed railway trains can cause dynamic problems in a continuous bridge. This study shows the structural behavior and the construction process of the new advance method.

  • PDF

Analysis on Voltage Rise of Rail in High speed Railway System (고속철도 시스템의 레일 전위 상승 해석)

  • 이종우
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.52 no.8
    • /
    • pp.481-485
    • /
    • 2003
  • In electric railway system, potential of rail has been risen, for return-current flows through rail. The magnitude of rising voltage is different to railway feed system, ground admittance of rail and the load current. If rising voltage of rail is large, electric shock can be occurred to passengers and maintenance- worker, In this paper, we estimate the rising voltage of rail in high speed railway system and check the safety to human beings.

Modeling the cumulative residual deformation of high-speed railway bridge pier subjected to multiple earthquakes

  • Gou, Hongye;Leng, Dan;Yang, Longcheng;Jia, Hongyu
    • Earthquakes and Structures
    • /
    • v.17 no.3
    • /
    • pp.317-327
    • /
    • 2019
  • High-speed railway bridge piers in seismically active area may be subjected to multiple earthquakes and then produce cumulative residual deformation. To study the cumulative residual deformation of high-speed railway bridge piers under multiple earthquakes, a nonlinear numerical analytical model with multi-DOF (MDOF) system is presented and validated against two shaking table tests in this paper. Based on the presented model, a simple supported beam bridge pier model of high-speed railway is established and used to investigate the cumulative residual deformation of high-speed railway bridge pier under mainshock-aftershock sequences and swarm type seismic sequences. The results show that the cumulative residual deformation of the bridge pier increases with earthquake number, and the increasing rates are different under different earthquake number. The residual deformation of bridge pier subjected to multiple earthquakes is accumulated and may exceed the limit of code.

A Strategy on Penetration of the Korean High-Speed Train into Chinese Market in Trade off the Technology Transfer (기술이전을 연계한 한국형 차세대 고속전철의 중국진출 방안 연구)

  • Song Dahl-Ho
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.907-914
    • /
    • 2005
  • Studied was a strategic plan for the Korean High-Speed Train system to penetrate the Chinese railway market in exchange of the technology of KHST. Firstly, taken was a glance at Chinese Government plans to extend total length of his railway lines and to construct the $Beijing\~Shanghai$ high-speed railway line. Then, disparity of railway technology in Korea and China was reviewed. From the review, SWOT Analysis were carried out to penetrate the foreign markets. Countermeasures to cope with SWOT were also considered. Strategical governmental supports and the establishment of the special organization to be charge of penetration of KHST into foreign markets were proposed. Finally, also proposed was the transfer of KHST technology to Chinese counterparts in exchange of tangible benefits for Korean side, The benefits may include (1) adoption of KHST as the type of rolling stock for the $Beijing\~Shanghai$ line, (2) guarantee of participation in the project and royalty for the KHST technology used for the future high-speed railway line construction. (3) prior written approval and partnership when making its way to third country, and (4) participation of Korean construction companies in Chinese railway construction project. etc. Adoption of KHST in China indeed gives chance to integrate the high-speed railway network after reunification of Korean peninsular, and enhance the economic ties between two countries.

  • PDF

Experimental Evaluation of an Energy Storage Device with High Rotaional Speed (에너지 저장용 고속회전기의 실험적 평가)

  • Lee, Jun-Ho
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2014.10a
    • /
    • pp.193-196
    • /
    • 2014
  • Experimantal evaluation of an energy storage device with high rotational speed to store regenerative energy which might be generated during the braking period of the trains is presented. The proposed ESS is small scale model and has 5kW output power, high rotational speed. In general railway trains generate regenerative energy for 10-20 sec when the train brakes and also high traction energy is needed for very short moment (10 sec) when the train increases the traction force. Considering such characteristics of the railway system energy storage device for the railway should have very fast response property. Among the various energy storage devices flywheel energy storage system has the fastest response property, which means that flywheel ESS is the most suitable for the railway system.

  • PDF

The Standardization of Damage Types of Track Components on High Speed Railway (고속철도 궤도구성품의 손상유형 표준화)

  • Oh, Seoung-Jae;Sung, Deok-Yong;Kim, Jun-Hyung;Park, Yong-Gul
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.1056-1064
    • /
    • 2008
  • It is estimated that the running of locally-developed next generation High Speed Trains with maximum speed of 400km/h will help to deteriorate track components. It was presented rail defect coding system in UIC 712R includes the definitions of damage types of rail, maintenance procedures, and etc to detect and maintain. It is necessary to make a track maintenance manual determining track maintenance periods using the standardization of damage types of track components such as: sleeper, fastener, elastic pad. In this paper, the damage types of high speed track components are investigated by referring domestic and foreign literatures. And then the damage types of rail given in UIC 712R is reclassified more particularly and classified damage types of track components using internal high speed railway. In conclusion, this paper suggests standardization for damage types of track components on internal high speed railway.

  • PDF

A Study on the Establishment of Recovery & Rescue System for the Accident/Incident on High-Speed Railway (고속철도 사고/장애 복구 및 구원체계 확보 방안 연구)

  • 홍선호;왕종배;홍용기;이원순
    • Proceedings of the KSR Conference
    • /
    • 2002.10a
    • /
    • pp.357-366
    • /
    • 2002
  • In this paper the cases on accidents/incidents and the reporting/responding procedures of high-speed rail operating countries will be reviewed and what these suggest us will be identified, and those countries' efforts to secure the prompt rescue system will be reviewed and the plan to secure the more customized rescue and rehabilitation system taking account into circumstances of our high-speed railway accident/incident will be presented.

  • PDF