It shows a tendency to increase rapidly underground of the city due to the build up of the large residential districts with industrial development, so there is required the development of the connection device for underground low voltage cable with high quality & convenient for use with consideration for installation condition of the underground. Hence, We will have the development of the connection device for underground low voltage cable, which is made waterproof perfectly under the flood of the underground for the long time, is convenient for use in spite of narrow area such as manhole or handhole, and can be able to prevent the release by the vibration.
This paper presents compact low frequency ultra-wide band (UWB) sensor design and study of the partial discharge diagnosis by sensing electromagnetic pulse emitted from the partial discharge source with the newly designed UWB sensor. In this study, we designed a new type of compact low frequency UWB sensor based on microstrip antenna technology to detect both the low frequency and high frequency band of the partial discharge signal. Experiments of offline PD testing on medium voltage (22.9kV) underground cable mention the comparative results with the traditional HFCT as a reference sensor in the laboratory. In the series of comparative tests, the calibration signal injection test provided with the conventional IEC 60270 method and high voltage injection testing are included.
This paper presents an algorithm for electric field analysis which is essential to insulation design of extra-high voltage oil-filled cable accessories using finite element method. Governing equation is induced by electromagnetic equation. Variational method is adopted for FEN formulation. Automatic mesh generation which saves time and labor is introduced for the input data. The application results of proposed algorithms were used for insulation design to develop 345kV cable joint.
This paper describes the construction scheme of new distribution system using HTS(High Temperature Superconducting) power equipments such as cable, transformer and FCL(fault current limiter). At present, one of the most serious problems in distribution power system, especially for metropolitan complex city, is to obtain the ROW for cable line routes, space for downtown substations and satisfy the environmental protection caused by NIMBY phenomena. Unfortunately, it is expected that this situation will get more and more worse. As the HTS technology to apply in power system Is developed, HTS cable utilizing mass-capacity characteristic can be a useful countermeasure to overcome this problem. This paper describes the application methodology of 22.9kV HTS cable with low-voltage, mass-capacity characteristics replacing the 154kV conventional cable. By applying 22.9kV HTS cable, the HTS transformer with higher capacity for the reduction of space and transformer numbers of downtown substation is necessary. Also, if the leakage Impedance of HTS transformer is same as or lower than that of conventional transformer, the fault current of 22.9kV bus will increase because the HTS transformer capacity is larger than that of the conventional transformer. This means the parallel application of HTS-FCL to reduce the fault current in addition to the HTS cable and transformer can be necessary. With the basic construction scheme of new distribution system, this paper describes the future study points to realize this new distribution system using HTS equipments.
Proceedings of the Korea Institute of Applied Superconductivity and Cryogenics Conference
/
2002.02a
/
pp.211-214
/
2002
It becomes difficult and high in cost to construct new ducts and/or tunnels for power cable in Metropolitan area. This paper presents the possible application of a HTS superconducting power cable for transmitting electric power in metropolitan areas, reflecting its important distinction such as compactness for installation in underground ducts and considerably economical efficiency comparable to present underground cables. In this paper, review of transmission capacity and voltage class of compact HTS cable which should be applied to existing ducts was performed.
HVDC Light는 300MW에 이르는 전력을 가지고 있는 아불 성형된 DC Cable과 Voltage Source 컨버터에 기반을 둔 가장 최근의 HVDC 기술이다. HVDC Light 컨버터는 IGBT(Insulated Gate bi-polar Transistor)와 유효전력과 무효전력 사이의 고속 컨트롤을 위한 PWM(펄스 폭 변조)의 기능을 가지고 있다. HVDC Light 케이블은 압출 성형된 폴리머의 절연을 가진 케이블이며 직류 전압을 위해 특별히 개조되었다. 전력 범위 내에서 HVDC Light 컨버터와 케이블은 지중 또는 해저 송전 등에서도 송전전력을 위해 훌륭하게 조합될 수 있었다. 본 원고는 실제의 케이스로부터 얻은 경험지식으로, HVDC Light 기술의 조합을 사용해 해결된 문제점을 소개하고, HVDC Light의 장점을 설명하였다.
KIEE International Transactions on Power Engineering
/
v.5A
no.1
/
pp.22-30
/
2005
The PWM inverter drive may cause an over voltage at the motor terminal, which imposes severe electric stresses on the inter-turn insulation of motor windings. Unlike low-voltage induction motors, high-voltage induction motors have a stator type of form-wound coil for insulation and are insulated to the slot and the coil. So, this paper presents a PWM 3-level inverter, H-Bridge cascaded 7-level inverter and High-voltage induction motor model. It then analyzes the voltage that generates at the input terminal of the high-voltage induction motor fed by each inverter. Also, in order to examine a factor that influences the switching surge voltage, this paper proposes the system equivalent model and performs the case studies using EMTP.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.20
no.3
/
pp.45-52
/
2006
In this paper, we analyze on the effect of LCR filter to mitigate transient overvoltage on the high voltage induction motor fed by H-bridge cascaded 7-level inverter. The switching surge voltage that it was occurred in inverter appears transient overvoltage at the motor input terminal. the transient overvoltage becomes the major cause to occur the insulation failure by serious voltage stress in the stator winding of high voltage induction motor. The effect of transient overvoltage appears more serious in high voltage induction motor than low voltage induction motor. We selected LCR filter for reduction of the transient overvoltage. Consequently, we demonstrated that the LCR filter connected to the invertor output terminals greatly reduces the transient voltage stress and ringing. The results of simulation show the suppression of transient overvoltage at the motor end of a long cable. using EMTP
The factors affecting the accuracy of lightning current measuring system are figured out the materials and length of down-conductor, and impedance matching between grounding resistance and characteristic impedance of cable. The cable with the low characteristic impedance used to transfer the lightning current from the top of the tower is too long to measure the waveform of lightning current, exactly. Especially, the height of the tower can cause the change of front time and magnitude of lightning stroke current. Basically, in this experiment. It was found that the magnitude and rise time of the lightning current are extremely dependant in the length of down-conductor in lightning current measuring system.
Journal of the Korea Academia-Industrial cooperation Society
/
v.21
no.8
/
pp.593-602
/
2020
Power cables installed in domestic factories or underground can cause accidents depending on the manufacturing process, installation, and environmental conditions during use. When an accident occurs in a power cable, it can cause enormous economic loss and social confusion. Hence, the importance of preventive management of the cable through diagnosis is increasing to prevent it. Therefore, in this paper, a diagnostic sample cable was produced by simulating a part that could be a problem due to the installation, manufacturing defects, or deterioration of cables that can occur in the field. Dielectric loss Tangent (tan 𝛿; TD), and Partial Discharge(PD) tests were performed. Partial discharge and AC (60Hz) withstand voltage equipment using High-Frequency Current Transformer (HFCT) were applied After applying a VLF (Very Low Frequency) power supply with a frequency of 0.1Hz was applied. As a result, B and C phase defect samples at a 2.0U0 voltage through the VLF could measure the internal partial discharge in the A-phase normal sample cable from the noise at a 0.5U0 to 2.0U0 voltage. In addition, the 1.5U0 voltage was measured through the AC (60Hz) withstand voltage equipment of the commercial frequency to verify its effectiveness. Partial discharge in the run-off state was measured at a voltage of 1.0U0, and there was a risk when installing the equipment. AC power equipment showed a difficulty of movement by volume or weight. The diagnostic method, through the VLF of the quadrant state, revealed its safety and effectiveness.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.