• Title/Summary/Keyword: high building

Search Result 6,781, Processing Time 0.029 seconds

Seismic Retrofit of High-Rise Building with Deformation-Dependent Oil Dampers against Long-Period Ground Motions

  • Aono, Hideshi;Hosozawa, Osamu;Shinozaki, Yozo;Kimura, Yuichi
    • International Journal of High-Rise Buildings
    • /
    • v.5 no.3
    • /
    • pp.177-186
    • /
    • 2016
  • Along the subduction-zone of the western Japanese islands, large earthquakes are expected occur around the middle of this century, and long-period ground motions will reach major urban areas, shaking high-rise buildings violently. Since some old high-rise buildings were designed without considering long-period ground motions, reinforcing such buildings is an important issue. An effective method to reinforce existing high-rise buildings is installing additional dampers. However, a problem with ordinary dampers is that they require reinforcement of surrounding columns and girders to support large reaction forces generated during earthquake ground motion. To solve this problem, a deformation-dependent oil damper was developed. The most attractive feature of this damper is to reduce the damping force at the moment when the frame deformation comes close to its maximum value. Due to this feature, the reinforcement of columns, girders, and foundations are no longer required. The authors applied seismic retrofitting with a deformation-dependent oil damper to an existing 54-story office building (Shinjuku Center Building) located in Shinjuku ward, Tokyo, in 2009 to suppress vibration under the long period earthquake ground motions. The seismic responses were observed in the 2011 Tohoku Earthquake, and it is clarified that the damping ratio was higher and the response lower by 20% as compared to the building without dampers.

Research on Relationship between Natural Vibration Periods and Structural Heights for High-rise Buildings and Its Reference Range in China

  • Xu, Peifu;Xiao, Congzhen;Li, Jianhui
    • International Journal of High-Rise Buildings
    • /
    • v.3 no.1
    • /
    • pp.49-64
    • /
    • 2014
  • Natural vibration period is an important parameter for high-rise building, Based on 414 high-rise buildings completed or passed over-limit approval in China, the distribution law of natural vibration periods is analyzied. In order to satisfy the design requirements, such as global stability, story drift limit and minimum shear-gravity ratio, the reference ranges of fundamental periods $T_1$ are $0.3{\sqrt{H}}{\sim}0.4{\sqrt{H}}$ when the structural heights $H{\geq}250m$, when 150 m ${\leq}$ H < 250m, $T_1=0.25{\sqrt{H}}{\sim}0.4{\sqrt{H}}$, when 100 m ${\leq}$ H < 150 m, $T_1=0.2{\sqrt{H}}{\sim}0.35{\sqrt{H}}$, when 50 m $ {\leq}$ H < 100m, $T_1=0.15{\sqrt{H}}{\sim}0.3{\sqrt{H}}$. These can provide reference data for controlling mass and rigidity of high-rise buildings.

A Study on Factors Affecting the Effects of High Building Disaster Administration System -Focused on Seoul Fire Fighters' Realization- (고층건물 재난관리체제 효과성에 미치는 영향요인 연구-서울특별시 소방공무원의 인식을 중심으로-)

  • Kim, Jinkeun;Park, Chanseok
    • Journal of the Society of Disaster Information
    • /
    • v.11 no.1
    • /
    • pp.149-162
    • /
    • 2015
  • Today, necessity of high building is increasing for security and information intensive type city development of urban space. At the same time, interest of high building disaster among human made - disaster is rising because importance of high building safety is embossed more. Therefore, the purpose of this study will present what main factors will affect high building disaster administration system that can be prevented or prepared.

Future of Super Tall Building in Korea (우리나라 초고층 건축물의 미래)

  • Yoo, Byoung-Eok
    • Journal of the Korean Professional Engineers Association
    • /
    • v.38 no.1
    • /
    • pp.52-54
    • /
    • 2005
  • Korean metropolises are choked by lack of green space to attain the limit of horizontal expansion. The alternative plan is trying total expansion that the green zone and road are made from the rest site by high-rise buildings. And high-rise building can solve indiscriminate development to attain the limit situation. The building of landmark can be the image of the nation and the pride of the citizen. The relaxing the height restriction of government can be whole nation's interests. Appearing high-rise building in overpopulated city is the subject of a generation and this trend cannot be avoided.

  • PDF

The Program of progress control and quality control for the high-rise compound building (초고층 주상복합건물의 수장공사 공정관리 및 품질관리 방안)

  • Jung, Eul-Kyu;Lim, Chil-Soon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.3 no.4
    • /
    • pp.111-117
    • /
    • 2003
  • Recently SAMWOO EMC received order and built interior walls which was used the day process in several high-rise compound buildings. On the way to build, this process was brought about several matter according to the progress and qualify control. So, this study is the improving way of the dry process from experiences on those constructions

A Study on the Overseas Case Analysis of Evacuation Guidance System for High-rise and Underground Complexes (초고층 및 지하연계 복합건축물 피난유도 시스템의 국외 사례 분석 연구)

  • Choi, Byeong-Yun;Kim, Dong-Oh;Seo, Jeong-Wan;Kang, Boo-Seong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.11a
    • /
    • pp.117-118
    • /
    • 2023
  • This study is a basic research study to establish an effective evacuation guidance system in case of fire in high-rise and underground-linked complex buildings. As a result of the analysis of overseas cases, it is judged that it is necessary to develop an evacuation guidance system using artificial intelligence.

  • PDF

Developing the Construction Guideline for ZEB Based on Air-tightness of Public Buildings in Korea (국내 비주거용 건물의 기밀성능 측정 결과를 통한 기밀 시공 가이드라인 개발)

  • Bae, Minjung;Choi, Gyeongseok
    • Land and Housing Review
    • /
    • v.11 no.3
    • /
    • pp.69-74
    • /
    • 2020
  • Since the design Standard for Energy Conservation in Building was implemented in 2008 for the first time, building elements such as window and door should satisfy the minimum criteria to apply for a building. Though its regulation does not cover the whole building yet, recent demand to reduce energy consumption in building sector grows rapidly year by year and also draws a lot of interest to ensure the whole building level. For example, a Zero energy building, one of low-energy buildings, requires a customized solution to resolve the air leakage issue to meet the standards in achieving the high level of air tightness. In this study, six non-residential buildings were tested by fan pressurization method to observe the air tightness of whole building to suggest the construction guideline for air tightness of low-energy building. Five out of six tested buildings showed 0.27 to 1.16 h-1 of number of air changes except one community center. These buildings were carefully constructed not only for building planning but also for parts where there was a concern of air leakage, thereby securing high levels of air-tightness. The construction skills were developed as a checklist to manage and supervise the construction site. It is our suggestion to use this checklist at construction sites for ZEB with the high level of air-tightness.

A Semi-automated Method to Extract 3D Building Structure

  • Javzandulam, Tsend-Ayush;Kim, Tae-Jung;Kim, Kyung-Ok
    • Korean Journal of Remote Sensing
    • /
    • v.23 no.3
    • /
    • pp.211-219
    • /
    • 2007
  • Building extraction is one of the essential issues for 3D city modelling. In recent years, high-resolution satellite imagery has become widely available and it brings new methodology for urban mapping. In this paper, we have developed a semi-automatic algorithm to determine building heights from monoscopic high-resolution satellite data. The algorithm is based on the analysis of the projected shadow and actual shadow of a building. Once two roof comer points are measured manually, the algorithm detects (rectangular) roof boundary automatically. Then it estimates a building height automatically by projecting building shadow onto the image for a given building height, counting overlapping pixels between the projected shadow and actual shadow, and finding the height that maximizes the number of overlapping pixels. Once the height and roof boundary are available, the footprint and a 3D wireframe model of a building can be determined. The proposed algorithm is tested with IKONOS images over Deajeon city and the result is compared with the building height determined by stereo analysis. The accuracy of building height extraction is examined using standard error of estimate.

A Study on the Design Elements and Tectonics for High-Rise Building Space Planning (초고층 공간계획의 디자인 요소와 구축에 관한 연구)

  • Cho, Jong-Soo
    • Korean Institute of Interior Design Journal
    • /
    • v.19 no.1
    • /
    • pp.3-15
    • /
    • 2010
  • The high-rise building is a dramatic phenomenon and a powerful expression of architecture in the modern civilization. The architecture of these high-rise buildings has been developed with mutual contributions of architectural aesthetic form and advanced technologies. Architecturally the significant evolution of tall buildings from ancient towers is a "change of function" from some religious symbols to a commercial concept that has aesthetically become acceptable with the changing of modern society and culture driven by a technological evolution. Generally, this commercial function in the evolution of high-rise building is office where high-rise working style is simply a necessity to meet quantitative market demands since this style in major cities around world has been changed from low-rise to high-rise during the last several decades in influenced of the modern industrial society. To achieve optimum spaces with architectural aesthetics in the high-rise building, the design has become collaborative, requiring the input of architects, engineers, economists, and other consultants. Hence, architects must deeply understand the basic planning theories of high-rise buildings and try to find optimum planning between architectural aesthetics and other issues. For the approach, we can firstly start with measurement and analysis of the planning use situation for major planning issues of high-rise buildings in practice. Therefore, this study is to analysis Design Elements and to find commonly used planning strategies, tectonic, of high-rise building in practice. It will give a chance to confirm commonly used planning and then becomes the starting point of the planning development of high-rise buildings based on practical planning issues.