• 제목/요약/키워드: heuristic

검색결과 2,715건 처리시간 0.029초

대규모 기업집단의 순환출자 해소를 위한 휴리스틱 기법 (A Heuristic Method for Resolving Circular Shareholdings of Korean Large Business Groups)

  • 박찬규
    • 한국경영과학회지
    • /
    • 제38권4호
    • /
    • pp.65-78
    • /
    • 2013
  • Circular shareholding is established when at least three member firms in a business group hold stock in other member firms and form a series of ownership in a circular way. Although there have been many studies which investigated a negative effect of circular shareholding on firm's value, few studies have discussed how to resolve the problem given complicated ownership structures of large business groups. This paper is based on a mixed integer programming model, which was proposed in the author's previous research and can identify the ownership share divested in order to resolve circular shareholding. Since the optimization model becomes too complicated for large business groups and requires a sophisticated software to solve it, we propose a simple heuristic method that can find a good approximate solution to the model. Its applications to twelve Korean large business groups show that the heuristic method is not just computationally attractive but also provides near-optimal solutions in most cases.

무게와 부피를 고려하는 경험적 공동수송 흔적 알고리듬의 성능분석 (Performance Analysis of Heuristic Algorithms for Consolidated Transportation with Weight and Volume Constraints)

  • 임석철;유영진
    • 대한산업공학회지
    • /
    • 제28권1호
    • /
    • pp.105-111
    • /
    • 2002
  • When transporting multiple items by trucks of various size, one needs to assign a group of items to each truck so as to minimize the total cost, while meeting the weight and volume constraint of each truck. In this paper, we formulate the problem as an integer programming problem and propose four heuristic algorithms for the problem. Computer simulation is used to evaluate the average performance of the four heuristic algorithms for the consolidated transportation problem.

준비시간(準備時間)이 종속인 다단계(多段階) 생산(生産) 시스템의 집단일정계획(集団日程計劃) (Group Scheduling Problem in Multi - Stage Manufacturing Systems with Dependent Setup time)

  • 노인규;남희열
    • 대한산업공학회지
    • /
    • 제12권2호
    • /
    • pp.33-44
    • /
    • 1986
  • This research is concerned with group scheduling problems in multi-stage manufacturing system with dependent setup time. The objective of the research is to develop and evaluate a heuristic algorithm for determining group sequence and job sequence within each group to minimize total tardiness in multi-stage manufacturing systems with sequence dependent group setup time. The group scheduling heuristic algorithm is developed and evaluated by comparisons with twenty-seven problems with the known optimum solutions and 144,000 random schedules of a large variety problems. The results indicate that the proposed heuristic algorithm gets the same optimum solutions for the problems and also provides the good solutions in comparison with the random schedules of the large variety problems. A numerical example is given to illustrate the heuristic algorithm.

  • PDF

Heuristic Approach for Lot Sizing and Scheduling Problem with State Dependent Setup Time

  • Han, Jung-Hee
    • Industrial Engineering and Management Systems
    • /
    • 제10권1호
    • /
    • pp.74-83
    • /
    • 2011
  • In this paper, we consider a new lot-sizing and scheduling problem (LSSP) that minimizes the sum of production cost, setup cost and inventory cost. Setup carry-over, setup overlapping, state dependent setup time as well as demand splitting are considered. For this LSSP, we develop a mixed integer programming (MIP) model, of which the size does not increase even if we divide a time period into a number of micro time periods. Also, we develop an efficient heuristic algorithm by combining a decomposition scheme with a local search procedure. Test results show that the developed heuristic algorithm finds a good quality (in practice, even better) feasible solution using far less computation time compared with the CPLEX, a competitive MIP solver.

Heuristic Algorithms for Parallel Machine Scheduling Problems with Dividable Jobs

  • Tsai, Chi-Yang;Chen, You-Ren
    • Industrial Engineering and Management Systems
    • /
    • 제10권1호
    • /
    • pp.15-23
    • /
    • 2011
  • This research considers scheduling problems with jobs which can be divided into sub-jobs and do not required to be processed immediately following one another. Heuristic algorithms considering how to divide jobs are proposed in an attempt to find near-optimal solutions within reasonable run time. The algorithms contain two phases which are executed recursively. Phase 1 of the algorithm determines how jobs should be divided while phase 2 solves the scheduling problem given the sub-jobs established in phase 1. Simulated annealing and genetic algorithms are applied for the two phases and four heuristic algorithms are established. Numerical experiment is conducted to determine the best parameter values for the heuristic algorithms. Examples with different sizes and levels of complexity are generated. Performance of the proposed algorithms is evaluated. It is shown that the proposed algorithms are able to efficiently and effectively solve the considered problems.

대단위 부품-기계 군집 문제를 위한 Look-ahead 휴리스틱 알고리듬 (A Look-ahead Heuristic Algorithm for Large-scale Part-Machine Grouping Problems)

  • 백종관;백준걸;김창욱
    • 한국경영과학회지
    • /
    • 제30권3호
    • /
    • pp.41-54
    • /
    • 2005
  • In this paper, we consider a multi-objective machine cell formation problem. This problem Is characterized as determining part route families and machine cells such that total sum of inter-ceil part movements and maximum machine workload imbalance are simultaneously minimized. Together with the objective function, alternative part routes and the machine sequences of part routes are considered In grouping Part route families. Due to the complexity of the problem, a two-phase heuristic algorithm is proposed. And we developed an n-stage look-ahead heuristic algorithm that generalizes the roll-out algorithm. Computational experiments were conducted to verify the performance of the algorithm.

반도체 생산 배취공정에서의 배취 크기의 결정 (Batch Sizing Heuristic for Batch Processing Workstations in Semiconductor Manufacturing)

  • 천길웅;홍유신
    • 대한산업공학회지
    • /
    • 제22권2호
    • /
    • pp.231-245
    • /
    • 1996
  • Semiconductor manufacturing line includes several batch processes which are to be controlled effectively to enhance the productivity of the line. The key problem in batch processes is a dynamic batch sizing problem which determines number of lots processed simultaneously in a single botch. The batch sizing problem in semiconductor manufacturing has to consider delay of lots, setup cost of the process, machine utilization and so on. However, an optimal solution cannot be attainable due to dynamic arrival pattern of lots, and difficulties in forecasting future arrival times of lots of the process. This paper proposes an efficient batch sizing heuristic, which considers delay cost, setup cost, and effect of the forecast errors in determining the botch size dynamically. Extensive numerical experiments through simulation are carried out to investigate the effectiveness of the proposed heuristic in four key performance criteria: average delay, variance of delay, overage lot size and total cost. The results show that the proposed heuristic works effectively and efficiently.

  • PDF

복합 휴리스틱 알고리즘을 이용한 지대공 유도무기 최적배치 모형 : 항공기 방어를 중심으로 (The Optimal Allocation Model for SAM Using Multi-Heuristic Algorithm : Focused on Aircraft Defense)

  • 곽기훈;이재영;정치영
    • 한국경영과학회지
    • /
    • 제34권4호
    • /
    • pp.43-56
    • /
    • 2009
  • In korean peninsular, aircraft defense with SAM (Surface-to-Air Missile) is very important because of short range of combat space in depth. Effective and successful defense operation largely depends on two factors, SAM's location and the number of SAM for each target based on missile's availability in each SAM's location. However, most previous papers have handled only the former. In this paper, we developed Set covering model which can handle both factors simultaneously and Multi-heuristic algorithm for solving allocation problem of the batteries and missile assignment problem in each battery. Genetic algorithm is used to decide optimal location of the batteries. To determine the number of SAM, a heuristic algorithm is applied for solving missile assignment problem. If the proposed model is applied to allocation of SAM, it will improve the effectiveness of air defense operations.

휴리스틱 방법을 이용한 N정책과 준비기간을 갖는 휴가형 $Geo^x/G/1$ 모형의 평균대기시간 분석 (Heuristic Approach to the Mean Waiting Time of $Geo^x/G/1$ Vacation Queues with N-policy and Setup Time)

  • 이성희;김성진;채경철
    • 한국경영과학회지
    • /
    • 제32권1호
    • /
    • pp.53-60
    • /
    • 2007
  • We consider the discrete-time $Geo^x/G/1$ queues under N-policy with multiple vacations (a single vacation) and setup time. In this queueing system, the server takes multiple vacations (a single vacation) whenever the system becomes empty, and he begins to serve the customers after setup time only if the queue length is at least a predetermined threshold value N. Using the heuristic approach, we derive the mean waiting time for both vacation models. We demonstrate that the heuristic approach is also useful for the discrete-time queues.

이종병렬기계로 구성된 변압기 권선공정의 생산일정계획 (A Heuristic Scheduling Algorithm for Transformer Winding Process with Non-identical Parallel Machines)

  • 박창권;장길상;이동현
    • 산업경영시스템학회지
    • /
    • 제26권2호
    • /
    • pp.35-41
    • /
    • 2003
  • This paper proposes a heuristic scheduling algorithm to satisfy the customer's due date in the production process under make to order environment. The goal is to achieve the machine scheduling in the transformer winding process, in which consists of parallel machines with different machine performances. The winding is important production process in the transformer manufacturing company. The efficiency of the winding machines is different according to the voltage capacity and the winding type. This paper introduces a heuristic approach in the transformer winding process where the objective function is to minimize the total tardiness of jobs over due dates. The numerical experiment is illustrated to evaluate the performance.