• Title/Summary/Keyword: harbor construction

Search Result 239, Processing Time 0.023 seconds

Development of Offshore Piles with Enlarged Upper Section (상부단면 확대형 해상 말뚝의 개발)

  • Kwon, O-Soon;Jang, In-Sung;Kwon, Young-Ho;Ki, Min-Joo
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.21 no.6
    • /
    • pp.427-436
    • /
    • 2009
  • In this study, new type of pile foundation was introduced for the better performance of lateral resistance than conventional piles by adopting enlarged upper section, because offshore structure design is subjected to the lateral loading. The numerical simulations were peformed in order to find out the lateral behaviour of the proposed pile. The economical efficiency of new pile system was also analyzed by considering the construction characteristics and material costs as well as the real field condition of harbor sites in Korea. From the study, it was revealed that the lateral resistance of piles with enlarged upper section is increased compared to conventional steel pile, and the construction costs would be reduced to about 62~80% of previous methods.

A Study on the Estimation of Total Amounts of Blasted Rock by Detonator Volume used in the Blasting (뇌관당 파쇄암량을 고려한 발파작업수량 산정 연구)

  • 김민규;안명석
    • Explosives and Blasting
    • /
    • v.21 no.1
    • /
    • pp.41-47
    • /
    • 2003
  • A large scale blasting is necessary for the construction or road, harbor or ground foundation of building and it is common that the blasting work is performed by a specialist subcontracted from the construction company who is originally responsible for the project. Sometimes the latter do not agree with the former in total amount of blasted rock. They try to find out real work amount as precisely as possible. The estimation is sometimes carried out by an entrusted person when it is impossible to come to an agreement with each other. There are several methods in estimating the blasted rock volume; a calculation by prescribed equivalents of explosive before construction, a calculation by specific charge per unit volume of rock, and a calculation by rock volume per detonator. In this study, the last method is reviewed and recommended as most reliable one.

Impact Analyses for the Safety Checks of Used Wave Dissipation Concrete Block Considering Construction Phases (사용된 소파블록의 안전성 검토를 위한 시공단계별 충돌해석)

  • Huh, Taik-Nyung;Choi, Chang-Ho
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.10
    • /
    • pp.640-647
    • /
    • 2018
  • Many harbor structures have been constructed, and some structures are now under construction in Korea, which is a peninsular state and a logistics hub in Northeast Asia. Expansions and extensions of existing harbors are also being planned to meet increasing natural disaster threats. Wave-dissipation concrete blocks are recycled or discarded based on the personal experience of engineers only, and there are no safety checks or criteria. To check the safety of used blocks, material evaluations were done by visual inspection of blocks on the ground and under water and from 20 non-destructive measurements of the rebound hardness test and 3 concrete core samples. Wave-dissipation blocks are sometimes fully or partially damaged in the process of transferring and mounting them or during construction. Therefore, a safety check is essential for recycling blocks with an evaluation of materials while considering the construction phases. To do this, a block was modeled with a 3D finite element method using ADINA, and impact analyses were done according to the transfer, mounting, and construction phases. From the results of the impact analyses and material evaluation, the safety checks and reasonable evaluation of used blocks were examined, and detailed construction methods are proposed. The methods are expected to maximize the reuse of used wave-dissipation blocks from an economical point of view.

A Study on Techniques of the construction and Space Structure of Nam-hea city walls (남해읍성의 공간구성과 축조기법에 관한 연구)

  • Kwon, Soon-Kang;Lee, Ho-Yeol
    • Journal of architectural history
    • /
    • v.18 no.5
    • /
    • pp.59-80
    • /
    • 2009
  • The purpose of this study is to investigate the history, space structures, blueprint, and techniques of the construction of Nam-hea city walls. Nam-hea city walls were relocated in 1439 from Whagumhun-Sansung(火金峴山城) to the present site, nearby Nam-hea Um.(南海邑) The city walls were rebuilt after they were demolished during Japanese invasion on Korea in 1592 and their reconstruction was also done in 1757. At present, the city walls only partially remained due to the urbanization of the areas around them. A plane form of the City wall is a square, and the circumference os approximately 1.3km. According to the literature, the circumference of the castle walls is 2,876尺, the height is 13尺, and the width is 13尺 4寸. Hang-Kyo(鄕校). SaGikDan(社稷壇), YoeDan(厲壇), SunSo(船所) which is a harbor, as well as government and public offices such as Kaek-Sa(客舍) and Dong-Hun(東軒) existed inside the castle walls. Inside the castle walls were one well, five springs, one ditch, and one pond, and in the castle walls, four castle gates, three curved castle walls, and 590 battlements existed. The main government offices inside castle walls were composed of Kaek-Sa, Dong-Hun, and Han-Chung(鄕廳) their arrangements were as follows. Kaek-Sa was situated toward North. Dong-Hun was situated in the center of the west castle walls. The main roads were constructed to connect the North and South castle gate, and subsidiary roads were constructed to connect the East and West castle gate. The measurement used in the blueprint for castle wall was Pobaek-scale(布帛尺:1尺=46.66cm), and one side of it was 700尺. South and North gate were constructed in the center of South and North castle wall, and curved castle walls was situated there. One bastion was in the west of curved castle walls and two bastions were in the east of curved castle walls. The east gate was located in the five eighths of in the east castle wall. Two bastions were situated in the north, on bastion in the south, one bastion in the south, and four bastions in the west castle wall. The castle walls were constructed in the following order: construction of castle field, construction of castle foundation, construction of castle wall, and cover the castle foundation. The techniques used in the construction of the castle walls include timber pile(friction pile), replacement method by excavation.

  • PDF

Evaluation of the Behavior of Dredged Materials in Ocean Dumping Area

  • Lee, Seung-Chul;Kim, Kang-Min;Kim, Hyung-Chul;Lee, Joong-Woo
    • Journal of Navigation and Port Research
    • /
    • v.30 no.9
    • /
    • pp.755-762
    • /
    • 2006
  • When we consider to develop a new harbor, the most important factor, we think, is the lowest water depth of waterway and approaching channel for safe navigation of vessel. The existing harbors have been being dredged to meet the international trend of jumbo sized vessels by adopting the new design criteria. As the dredged materials over the expected at the design level were common and there are still lack of land based reclamation area, we have no choice to discharge the dredged materials in open sea area In this study, we analysed the behavior of discharged materials at the dumping area of offshore, which were collected from the dredging work at the waterway in Busan New Port. We measured the tidal currents and analyzed the waters of dumping site after the dumping work. These were used to evaluate the numerical models. Suspended Solids(SS) were introduced to the diffusion model. Because of the characteristic of the dumping site, the speed of initial diffusion and settle down of the discharged materials was so fast. Therefore, we believe that the dumped materials do not cause a significant impact to the marine environment.

Numerical Study of Wave Prediction Using a Ray Tracing Technique (파향선 추적기법을 이용한 파랑예측에 관한 연구)

  • 조원철
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.8 no.3
    • /
    • pp.236-245
    • /
    • 1996
  • A wave prediction model is used to estimate the wave spectrum at Ulsan Bay. The Wave model includes the refraction of wave rays according to water depth changes in transient and shallow waters. The calculation of wave refraction is performed from three wave directions : east, southeast and south. Three target locations are selected and the wave spectrum at each location is computed for several uniform wind speeds and directions. The computation results of wave spectrum are compared with PNJ(Pierson, Newmann and James) nomogram and Bretschneider nomogram as well. The model could be used in selection of proper harbor site and in construction of coastal facilities, providing fundamental data in design.

  • PDF

Development and Identification of Pneumatic Excavator System (모형 공압굴삭기 시스템 구축)

  • Lee, Hong-Sun;Cheon, Se-Young;Lim, Tae-Hyeong;Kim, Sung-Su;Choi, Jeong-Ju;Yang, Soon-Young
    • Transactions of the Korean Society of Machine Tool Engineers
    • /
    • v.16 no.3
    • /
    • pp.31-36
    • /
    • 2007
  • The excavator is complex machinery which has widely used in the construction site, deck of harbor and deep sea. The one of important issue of excavator system in recent is an automation of it in order to improve a working efficiency, a convenience working circumstance and work satisfaction. However, since there are large nonlinearities of control circuit, actuating cylinder, joiners of hydraulic units and changing loads etc., it is difficult to develope an automatic excavator system. Therefore, in this study, toy scale pneumatic excavator system is constructed and the remote control system is installed on it, before developing the automatic excavator system. In order to design the control system of the developed pneumatic excavator system, the transfer function is obtained using signal processing method and the controller gains of PID are decided based on CDM(coefficient diagram method). The obtained transfer function and the performance of the proposed control system is evaluated through experiments and computer simulation.

The Near-field Behavior of Effluent discharged from Confined Disposal Facility (제한투기시설에서 배출되는 여수의 근역거동)

  • 정대득;이중우
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2000.11a
    • /
    • pp.95-107
    • /
    • 2000
  • The primary purpose of dredging work is to maintain navigational readiness and to increase environmental amenity, so that the dredging project which is composed of excavating, removing, transporting, storing and disposing dredged material must be carefully managed to insure that dredging works are completed in a cost-effective and environmentally safe manner. The most important point in dumping operations is an estimating and reducing the impacts of discharges at the dumping area. One of the most effective method for the reduction of ecological impacts at dumping area is using the schematic process composed of the sophisticated plan, precise work and predicting/reducing the impacts based on the numerical model and field observation. In this study, the numerical model is used to predict the near-field spatial fate and begavior of effluent discharged from Confined Dumping Facility(CDF) located near coastal area. To to this purpose, reappearing of tidal current was preceded. The model is then applied to Mokpo harbor, where capital dredging and maintenance dredging are conducted simultaneously and the CDF is under construction;. In the series of model case study, we found that the near-field behavior of effluent discharged from CDF was governed by the receiving water condition, outfall geometry, characteristics of efflent and CDF operating conditions.

  • PDF

A Study on the Characteristic of Sea Wave (불규칙파(不規則波)의 특성(特性)에 관한(關) 연구(硏究))

  • Choi, Han-Kuy;Yun, Kang-Hun
    • Journal of Industrial Technology
    • /
    • v.5
    • /
    • pp.59-64
    • /
    • 1985
  • The remarkable economic growth achived during 1960-1980 in Korea inevitablely demanded the expansion and maintenance of the harbors and their auxiliary seashore facilities. One of the most important elements in the basic besign for the expasion of a harbor and its auxiliary facilities is, of course, the proper determination of the design wave which reflects the major characteristics of the seashore under consideration. In this study, the parameters of significant waves for the industrial harbors on East Coast, Muck-Ho and Po-Hang, are first computed by means of computer programming using S.M.B and P.N.J methods, respectively. Then the design waves with the return periods of 5-200 years were estimated by frequency analysis of the significant waves. A comparison of the design waves with the observed wave data during the past 10 years made it possible to determine the optimum value of design wave at the two harbors. The important results of this study can be summarized as follows; 1) It seems appropriate to take the design wave hieghts with the return period of 50 years at Muck-Ho and Po-Hang as 6.9 and 5.8 meters respectively. 2) It was found that for the determination of design waves on East Coast of Korean Peninsula P.N.J method works better than S.M.B method in predicting the significant wave, and the Log-Normal distribution fits best to the wave data which were put to frequency analysis.

  • PDF

Undrained Shear Strength of Marine Clays of Shihwa Region Obtained from CPTu (CPTu로부터 구한 시화지구 해성점토의 비배수 전단강도)

  • Jang, In-Sung;Kim, Bum-Sang
    • Ocean and Polar Research
    • /
    • v.25 no.spc3
    • /
    • pp.353-360
    • /
    • 2003
  • Estimation of undrained shear strength $(S_u)$ of clayey soils from piezocone penetration test (CPTu), which has widely been known as one of very promising in situ test methods, requires piezocone factors. Empirical correlations are generally utilized to derive piezocone factors, but previous studies on the empirical piezocone factors are site-specific and in some cases need engineering characteristics, which should be obtained from additional laboratory tests. In this study, empirical cone factors were evaluated by comparing 6 CPTu results at Shihwa region in Korea with reference $S_u$ values obtained from field vane test (FVT). From previous CPTu results of other regions in Korea as well as the results herein, the correlations between piezocone factor, $N_{kT}$ and CPTu results were investigated and three simplified evaluation methods of $S_u$ using only CPTu results were presented. The $S_u$ values estimated by $(q_T-{\sigma}_v)/{\sigma}'_v$ method shows better matches with those obtained from laboratory tests for marine clays at Shihwa region.