A Comparative Study on Construction Productivity Trends as Analyzed by Various Measures - South Korea, the U.S., the U.K., and Japan (1995-2015) - (측정지표에 따른 건설생산성 비교 - 한국, 미국, 영국, 일본(1995-2015) -)

  • Lee, Chijoo;Lee, Ghang;Won, Jongsung
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.35 no.4
    • /
    • pp.175-184
    • /
    • 2019
  • To improve productivity in the architecture, construction and engineering industry, it is critical to understand both current and historic trends in construction productivity. This study analyzes and compares construction productivity trends of South Korea, the U.S., the U.K., and Japan 1995 to 2015 using the following three measures: construction labor productivity, construction duration per floor, and construction duration per 1,000 m2 floor area. As the results, the international competitiveness of each country varied according to which measures were used to analyze them. Among the four countries, the construction labor productivity of the U.S. was the highest, followed by that of South Korea. South Korea also had the second highest productivity growth rate, following that of Japan. On the other hand, when analyzed from the perspective of construction duration, the construction productivity in South Korea appeared relatively lower than those of other countries. There were differences in the location of construction competitiveness of each country analyzed by various measures. Therefore, to accurately diagnose and improve the construction competitiveness in South Korea, strategies based on various measures are need to established simultaneously.

COST ANALYSIS OF STRUCTURAL PLAN FOR REDUCING FRAMEWORK CONSTRUCTION DURATION OF REINFORCED CONCRETE RESIDENTIAL BUILDINGS

  • Seon-Woo Joo;Moonseo Park;Hyun-Soo Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.493-498
    • /
    • 2009
  • Recently, the number of complex construction projects, such as high-density development and long-span mega structure construction, has been increasing globally. Therefore, the construction duration has become an even more important factor for success. Nevertheless, in domestic residential construction projects, it usually takes more time than twice as much as North American cases. The long construction duration causes a number of problems, for example growth of financial costs, fall in productivity, and weakness of competitiveness. If the framework construction duration can be shortened to 3 ~ 4 days, then it is also expected to complete the finish work of building in shorter duration, be led to reduce the entire construction duration, and eventually to save a great deal of indirect costs. For shortening the construction duration, previous researches pointed out that the development of simplified plan design should precedes. But, in reality, lack of experience of new design and innovative techniques tends to be the obstacle to wide adoption of the simplified plan design in construction fields. In this paper, a simplified structural plan design is proposed, and the construction cost is quantitatively compared between when traditional construction technique is applied to the traditional plan and when the duration-shortening key technique is applied to the developed plan.

  • PDF

Fatigue Crack Growth Behavior of a Magnesium-Based Composite (마그네슘 금속복합재의 피로균열거동해석)

  • Kim, Doo Hwan;Park, Yong Gul;Kim, Sung Hoon;Han, Suk Kyu
    • Journal of Korean Society of Steel Construction
    • /
    • v.9 no.4 s.33
    • /
    • pp.515-521
    • /
    • 1997
  • The effects of heat treatment and fiber orientation on tensile strength and fatigue behavior were studied in a continuously reinforced. magnesium-based composite Following an earlier TEM investigation, specimens were thermally aged to modified the interfacial zone between the alumina fibers and the magnesium alloy matrix. From the tensile experimental results, the ultimate tensile strength of the aged specimens were lower than that of the as-fabricated due to weak fiber-matrix interfacial strength with chemical reaction during the thermal processing. The fatigue crack growth experiments were conducted with specimens having the fiber orientation normal to the crack growth direction (longitudinal) and also specimens with the fibers oriented parallel to the crack growth direction(transverse). A comparison of the fatigue crack growth behavior indicates that aged longitudinal specimens are more resistant to fatigue crack growth the as-fabricated longitudinal specimens. Conversely, as-fabricated transverse specimens are more resistant to fatigue crack growth than aged transverse specimens.

  • PDF

Effects of Growth Controls on Homebuilding in California Local Jurisdictions: Focusing on the late 1980s (캘리포니아 주내 지방정부의 성장관리 규제가 주택건설에 미치는 영향에 관한 연구: 1980년대말을 중심으로)

  • Pillsung Byun
    • Journal of the Korean Geographical Society
    • /
    • v.38 no.6
    • /
    • pp.906-921
    • /
    • 2003
  • This paper discusses the price effects of local growth controls on the housing markets of California jurisdictions in the late 1980s empirically. Particularly, based on spatial econometric modeling, the study focuses on the homebuilding constrained by growth controls which is one of the price effects. The modeling produces the California-wide generalizable results, differentiates among the individual effects of various growth controls on homebuilding, and covers spatial effects. Thereby, this study intends to supplement the existing work on the price effects of growth controls. The modeling results find that restrictive residential zoning had the effect of significantly restricting housing construction in the late 1980s. On the other hand, urban growth boundaries had the effect of accommodating homebuilding. Population growth or housing permit caps and adequate public facility ordinances had no significant effects on housing construction.

A Research on the Construction Market of the Democratic Republic of the Congo(DRC) and Investment Strategy of Korean Construction Enterprise (콩고민주공화국 건설시장 현황과 진출방안)

  • Lee, Jong-Gwang
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.115-118
    • /
    • 2008
  • The promotion of overseas projects by construction enterprises has appeared as a way to overcome the current business difficulties of the Korean construction industry, which largely caused by the slow growth of the domestic market and the intensified competition among construction companies. The government has also shown considerable interests in the strategic approach of promoting construction projects by private companies in natural resource-rich countries, which helps the internationalization of Korean companies and the acouisition of natural resources. In this regard, this research examines the status of the construction market in the Democratic Republic of the Congo(DRC) whose potential economic growth is considered as significant, while exploring the appropriate Investment strategies of Korean construction enterprise. Since little appears to be known about the construction market and economic conditions of the DRC, after a documented review of the development trajectory of the country, a field investigation was preformed in June 2008 for obtaining information on the subjects. This research finds that the road construction is the area to fulfill the several important criteria of implementing construction projects in developing regions, including the safety/reliability for gaining investment profits, the possibility of implementing construction projects on the gradual basis, the possibility of using the facilities after the project completion, and the linkage between payment and the construction stages. In regard to the current economic situation of the DRC and the policies of the DRC government, a package deal approach, which contains the exchange of the infrastructure construction by the Korean companies and the provision of natural resources by the DRC government, is the most feasible method for Korean companies to promote their businesses in the DRC's construction market.

  • PDF

A Review on the Decision-making Process for Calculating Land and Construction Costs in the Early Stages of the Project - Focusing on the Housing Vonstruction Project in Jeju Island - (사업초기단계에서 토지비 및 건축공사비 산정을 위한 의사결정프로세스에 관한 고찰 - 제주도 내 주택건설사업 중심으로 -)

  • Jo, Seong-Min;Cho, Sung-Hee;Jeon, SangHoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.321-322
    • /
    • 2021
  • This study is to develop a non-contact construction project management solution that can reduce cost and construction period through on-site information sharing, minimizing contact with others by COVID19, and improving the productivity of the construction industry. Decisions, checklists, and execution rates of construction costs can be checked with smart devices through sharing on-site photos and videos, exchanging opinions. Details and checklist data stored on cloud servers of sites that apply non-face-to-face construction project management solutions will be used as data for analyzing amounts and construction periods depending on the size of the construction. Real-time field information sharing will reduce expected problems and waste factors, expand communication channels with users to prevent or minimize construction disputes and claims, and contribute to the expansion and growth of new research industry markets in construction technology.

  • PDF

Development of Non-Contact Construction Management Supporting System For Cost Reduction and Duration Reduction By Real-Time Data Sharing (건설공사에서 실시간 현장 정보 공유에 의한 원가절감, 공기단축을 위한 비대면 건설사업관리 솔루션 개발)

  • Kang, Sang-Chan;Kim, Min-Jin;Jang, Myunghoun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.323-324
    • /
    • 2021
  • This study is to develop a non-contact construction project management solution that can reduce cost and construction period through on-site information sharing, minimizing contact with others by COVID19, and improving the productivity of the construction industry. Decisions, checklists, and execution rates of construction costs can be checked with smart devices through sharing on-site photos and videos, exchanging opinions. Details and checklist data stored on cloud servers of sites that apply non-face-to-face construction project management solutions will be used as data for analyzing amounts and construction periods depending on the size of the construction. Real-time field information sharing will reduce expected problems and waste factors, expand communication channels with users to prevent or minimize construction disputes and claims, and contribute to the expansion and growth of new research industry markets in construction technology.

  • PDF

The Development of Automated Building Equipment Design Process System Using 3D CAD (3차원 CAD정보를 활용한 건축설비설계 프로세스 시스템 개발방향)

  • Lee, Dong-Hyun;Jung, Woo-Shin;Kim, Young-Don;Song, Kyoo-Dong
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2008.04a
    • /
    • pp.269-274
    • /
    • 2008
  • It is attempted that the standardization of the construction, globalization of the engineering construction and an information oriented construction spread by setting a goal of the advanced construction industry and productivity increase of human resources within the country. Hence, it has been brought in the information oriented construction of BIM based technology for the field of construction and equipment of Korea. The current study that examines the possibility of application of 3D ; that is BIM based programs of building equipment, and make better the problems of 3D building equipment system through the Pilot Test, indicates the way of growth development about the construction of building equipment process system.

  • PDF

A study on design development and construction application of precast concrete modular house (프리캐스트 콘크리트 모듈러 단독주택 설계 개발 및 시공 적용에 관한 연구)

  • Seo, Dong-Won;Jeon, Sang-Hoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.230-231
    • /
    • 2021
  • In this study, Dr. Bae Kyu-woong of the Korea Institute of Construction Technology developed a concrete module that was lightweighted to 1700kN with KC modules and met housing performance standards. It solves Construction lifts problem that was the limit of the PC module, and is an innovative model that greatly improves Construction period and economics with boxed modules, and is manufactured in the factory by extruded molding in vibration, noise, fireproofing standards, etc., and has the advantage of excellent precision and high strength. Therefore, if the framing house of a precast concretecan only be standardized in construction, its potential for growth will be endless. To do this, standardization, standardization, and modularization of the design are essential.

  • PDF