• Title/Summary/Keyword: ground surface settlement

Search Result 255, Processing Time 0.026 seconds

Development of Database System for Management of Roadbed Settlement in High Speed Railway (고속철도 노반 침하관리를 위한 DB 개발)

  • Choi, Chan-Yong;Kim, Dae-Sang;Lee, Jin-Wook;Shin, Min-Ho
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.500-504
    • /
    • 2007
  • Database are developed to control measured settlement data under construction in Gyungbu High Speed Railway from Daegu to Busan. This means that data having different type at different site could be managed in a unified way. The database includes algorithm to evaluate embankment settlement with settlement data at the surface of embankment and ground settlement data. And also, it has a function to analyse the causes of large settlement over allowable level and high settlement speed based on the log data, embankment specification, physical characteristics of embankment materials.

  • PDF

Evaluation of Influencing Factors on Settlement Behavior of Very Soft Ground with Reinforced Surface (표층처리공법으로 개량된 초연약지반의 침하거동에 미치는 영향인자 분석)

  • You, Seung-Kyong;Lee, Jong-Sun;Ham, Tae-Gew;Yang, Kee-Suk;Cho, Sam-Deok;Choi, Hang-Seok
    • Journal of the Korean Geotechnical Society
    • /
    • v.24 no.12
    • /
    • pp.85-92
    • /
    • 2008
  • It is necessary to develop a rational design method for surface reinforcement of very soft ground because most current design works rely on merely crude empirical correlations. In this paper, the mechanical behavior of very soft ground that is surficially reinforced was investigated with the aid of a series of numerical analyses. Several material properties of each dredged soft ground, reinforcement and backfill sand mat have been exercised in the numerical analysis. The result of numerical analysis was compared with those of the laboratory model test. Through the matching process between the numerical and experimental result, it is possible to determine representative material properties of the dredged soft ground, reinforcements and backfill sand mat. These verified material properties permit to evaluate the effect of the stiffness of reinforcement and the thickness of sand mat on the overall deformation of the reinforced soft ground.

A study of settlement safety for existing ground with twin tunnel progressing (쌍굴굴착으로 인한 인근지반의 침하 안전에 관한 연구)

  • 정대석
    • Journal of the Korean Society of Safety
    • /
    • v.7 no.4
    • /
    • pp.55-61
    • /
    • 1992
  • An engineer designing a tunnel in an urban area should be to predict the magnitude and distribution of ground movements which are important to Investigate the potential damage to the existing structures around tunnel. The present study examines available theories and emprical equations, and tries to investigate quantativily ground movements around tunnel with tunnel progressing. Approcaches to the problem of ground movements associated with twin tunnel was and elasto - plastic finite element method. Typical section in Seoul Subway were selected in numerical study. The analysis and study was done with respect. to surface, subsurface and crown settlements with varying ground conditions, tunnel geommetry and construction conditions.

  • PDF

A case study of ground subsidence analysis using the InSAR technique (InSAR 기술을 이용한 지반침하분석 사례연구)

  • Moon, Joon-Shik;Oh, Hyoung-seok
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.2
    • /
    • pp.171-182
    • /
    • 2022
  • InSAR (Interferometry SAR) technique is a technique that uses complex data to obtain phase difference information from two or more SAR image data, and enables high-resolution image extraction, surface change detection, elevation measurement, and glacial change observation. In many countries, research on the InSAR technique is being conducted in various fields of study such as volcanic activity detection, glacier observation in Antarctica, and ground subsidence analysis. In this study, a case of large ground settlement due to groundwater level drawdown during tunnelling was introduced, and ground settlement analyses using InSAR technique and numerical analysis method were compared. The maximum settlement and influence radius estimated by the InSAR technique and numerical method were found to be quite similar, which confirms the reliability of the InSAR technique. Through this case study, it was found that the InSAR technique reliable to use for estimating ground settlement and can be used as a key technology to identify the long-term ground settlement history in the absence of measurement data.

A Study on the Stress Distribution beneath Loaded Ground Surface Area of Double Strata Ground on Soft Clay Layers (연약점토층위 이층지반 지표면 재하시 지중응력 특성연구)

  • Lim, Jong-Seok;Lee, In-Hyung
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2005.10a
    • /
    • pp.423-428
    • /
    • 2005
  • If the load of constructing vehicles during the construction work acts on the road or the ground surface on the soft ground, due to the excess stresses in soils the trafficability of the vehicles influences the constructing efficiency, constructing period and so on. Stress distribution in soils is the very important element to design and to solve the problems of settlement, safety of foundations and trafficability of constructing vehicle in civil engineering. This research represents the comparative estimation of the actual and theoretical measurement on the underground stress of outer layer for each soil after the observation of each top soil layer for its vertical and horizontal stress in (1)homogeneous sand ground (2) weak stratum with the sand soil (3) weak stratum with gravel of the soil model, and it also investigates the effect of subsidence of ground by the repeated load. The underground stress turn out to be different in the value of theoretical and actual measurement after the trial examination of model.

  • PDF

Structure damage estimation due to tunnel excavation based on indoor model test

  • Nam, Kyoungmin;Kim, Jungjoo;Kwak, Dongyoup;Rehman, Hafeezur;Yoo, Hankyu
    • Geomechanics and Engineering
    • /
    • v.21 no.2
    • /
    • pp.95-102
    • /
    • 2020
  • Population concentration in urban areas has led traffic management a central issue. To mitigate traffic congestions, the government has planned to construct large-cross-section tunnels deep underground. This study focuses on estimating the damage caused to frame structures owing to tunnel excavation. When constructing a tunnel network deep underground, it is necessary to divide the main tunnel and connect the divergence tunnel to the ground surface. Ground settlement is caused by excavation of the adjacent divergence tunnel. Therefore, predicting ground settlement using diverse variables is necessary before performing damage estimation. We used the volume loss and cover-tunnel diameter ratio as the variables in this study. Applying the ground settlement values to the settlement induction device, we measured the extent of damage to frame structures due to displacement at specific points. The vertical and horizontal displacements that occur at these points were measured using preattached LVDT (Linear variable differential transformer), and the lateral strain and angular distortion were calculated using these displacements. The lateral strain and angular distortion are key parameters for structural damage estimation. A damage assessment chart comprises the "Negligible", "Very Slight Damage", "Slight Damage", "Moderate to Severe Damage", and "Severe to Very Severe Damage" categories was developed. This table was applied to steel frame and concrete frame structures for comparison.

Centrifuge Model Tests on Trafficability of Very Soft Ground Treated with Geotextile and Sand Mat (토목섬유와 모래로 처리된 초연약지반의 장비주행성에 대한 원심모형실험)

  • Jun, Sang-Hyun;Lee, Jong-Ho;Yoo, Nam-Jae
    • Journal of the Korean Geotechnical Society
    • /
    • v.26 no.3
    • /
    • pp.13-23
    • /
    • 2010
  • In this study, centrifuge model tests with 50 g gravitational condition were performed to evaluate the bearing capacity of very soft ground, improved by spreading geotextile and sand on the surface of ground, for the heavy machinery to be able to access. For undrained shear strength of ground model, prepared with the clay sampled from the field, being in the range of 3.1~11.7 kPa, bearing capacity tests were performed with the model footing and the loading system built to simulate the heavy machinery on the ground model treated with geotextile and sand. Test results were compared with theoretically and numerically evaluated ones. Test results about load-settlement curves showed that the bearing capacity increases with the increase of the undrained shear strength of ground. Punching shear or local shear failure was also observed. For a relatively low undrained shear strength of ground, settlement behavior is found to be crucial to evaluating the trafficability of machinery whereas bearing capacity becomes a dominant factor with the increase of undrained shear strength of ground. The method for assessing the bearing capacity of the ground related to trafficability of machinery is presented by acquiring the regression relationship between the contact pressure of machinery and settlements using load-settlement curves with the change of the undrained shear strength. Furthermore, results of numerical analyses about load-settlement relation are in relatively good agreement with those of centrifuge model test.

Characteristics of Structure Settlement due to Urban Railway Construction on Reclaimed Land (해안매립지반의 도시철도 시공에 따른 구조물 침하 특성 분석)

  • Shin, Eun-Chul;Rim, Yong-Kwan;Park, Jeong-Jun
    • Journal of the Korean Geosynthetics Society
    • /
    • v.11 no.1
    • /
    • pp.23-33
    • /
    • 2012
  • The stability of urban railway foundation can be a problem due to the excessive settlement. The settlement at the base of railway is monitored by the installed settlement gauges. The piezometer and pore water pressure measurement device are installed to measure the variation of pore water pressure and ground water table during the continuous pullout of sheet piles which were used for the braced cut. The settlement of railway is predicted with using the computer program CAIN RDA. The input data for the numerical analysis are obtained from the field soil exploration data and soil properties. The surcharged load from landscaping over the ground surface and the weight of train are taken into account for the estimation of settlement. As a result of numerical analysis, the range of settlement for six different Sites is from 5.94 cm to 12.77 cm. Thus, the settlement level at Site 2 is occurred 12.77 cm which is higher than the allowable settlement of 10 cm.

Effects of Size and Shape of Drain on Horizontal Vacuum Drain (배수재의 직경과 형상변화가 수평진공배수에 미치는 영향)

  • Yoo, Nam-Jae;Park, Byung-Soo;Jeong, Gil-Soo;Lee, Byung-Kon
    • Journal of Industrial Technology
    • /
    • v.21 no.A
    • /
    • pp.293-301
    • /
    • 2001
  • This paper is experimental results of investigating the efficiency of horizontal vacuum drainage system. Effects of size and shape of drain on horizontal vacuum drainage were studied. Model tests in the laboratory with soft marine clay were carried out with drain pipe of having three different diameters and PBD (Plastic Board Drain) of strip shape so that consolidation settlement of soft clay due to applied vacuum pressure, amount of discharge, ground settlement and distributions of pore pressure and undrained shear strength were measured during testing. From results of model test, amount of discharge due to vacuum pressure was increased with the diameter of pipe drain whereas the drain efficiency of pipe in per unit area of drain surface was decreased with diameter of pipe. The rate of discharge per unit time was reduced very fast with diameter of pipe. Settlement of ground surface with time was increased with diameter of pipe as a result of increase of discharge to drain pipe.

  • PDF

Study on Ground Surface settlement of a 3-Arch-shaped Tunnel (3아치터널의 지표면 침하에 관한 연구)

  • Shin Kang Ho;Park Tu Sung;Park O Sung;Kim Jae Kwon
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.1007-1013
    • /
    • 2004
  • A three-arch NATM tunnel with a total length of 53.5m has been constructed for a metropolitan subway station in Daejon, Korea. The tunnel, whose crown is located 22m below the ground, crosses the old Daejon station underneath. Since the tunnel comprises a very large section (10${\times}$28 m; largest in Korea), it shows complicated mechanical behaviors, especially near portal, due to its short length relative to width. As far as its construction step is concerned, the center tunnel is excavated with pre-excavated pilot tunnel, which is a unique feature of this tunnel (first in Korea) to secure safety during construction and prevent excessive settlements. The both side tunnels are then excavated along with the center tunnel. Since significant amount of settlement was predictable from the design stage, extensive monitoring was performed during construction. During excavation of the side tunnels, unexpected large settlements up to ${\~}$140mm (estimated 41.8 mm at design stage) was measured at the center tunnel. In this paper, we study the causes of this unusually large ground settlement. We believe that the extra-wide tunnel excavation increases the stress influence zone of portal in longitudinal direction and consequently add more settlements to the existing due to excavation and consolidation.

  • PDF