Quaranta, Giuseppe;Mollaioli, Fabrizio;Monti, Giorgio
Earthquakes and Structures
/
v.10
no.1
/
pp.239-260
/
2016
Tuned mass dampers (TMDs) have been frequently proposed to mitigate the detrimental effects of dynamic loadings in structural systems. The effectiveness of this protection strategy has been demonstrated for wind-induced vibrations and, to some extent, for seismic loadings. Within this framework, recent numerical studies have shown that beneficial effects can be achieved by placing a linear TMD on the roof of linear elastic structural systems subjected to pulse-like ground motions. Motivated by these positive outcomes, closed-form design formulations have been also proposed to optimize the device's parameters. For structural systems that undergo a near-fault pulse-like ground motion, however, it is unlikely that their dynamic response be linear elastic. Hence, it is very important to understand whether such strategy is effective for inelastic structural systems. In order to provide new useful insights about this issue, the paper presents statistical results obtained from a numerical study conducted for three shear-type hysteretic (softening-type) systems having 4, 8 and 16 stories equipped with a linear elastic TMD. The effectiveness of two design procedures is discussed by examining the performances of the protected systems subjected to 124 natural pulse-like earthquakes.
Kim, Sang-Ok;Seo, In-Yong;Lee, Heung-Ho;Rho, Dae-Seok
Journal of the Korea Society for Simulation
/
v.22
no.1
/
pp.1-8
/
2013
A higher penetration of renewable energy sources and adoption of renewable portfolio standard(RPS), the penetration of distributed generators(DGs) into power distribution network is becoming a threat for the safe operation of distribution network. The ground fault current of DGs can cause parasitic trip and mal-trip of protective device in the power distribution network. KEPRI has developed a simulation program for current setting of protective devices in DGs connected distribution network. In this study, we analyzed fault currents of a sample network in two cases, i.e. case 1 is for no DG connection, case 2 for a DG connection. We performed protection coordination for relays installed in the network and analyzed the contribution of a DG.
Journal of the Korea Academia-Industrial cooperation Society
/
v.19
no.5
/
pp.17-26
/
2018
If a photovoltaic (PV) system is installed in a primary feeder interconnected with the PV system, bi-directional power flow can occur, and then, the magnitude and direction of the fault current can change, depending on the fault location and point of common coupling (PCC) of the PV system, and the time current curve (TCC) cannot be properly coordinated between protection devices. Also, it is difficult to obtain a proper time interval for protection devices because the conventional setting approach is applied, even though the PV system is installed and operating. Therefore, this paper presents three operation modes considering the operational conditions of the PV system to obtain setting values for protection devices. Based on the mode, this paper proposes an algorithm to calculate the optimal protection coordination time interval according to the introduction capacity of the PV system. In addition, this paper performs modelling of a distribution system with the PV system and protection devices by using Off-DAS S/W, and analyzes the characteristics of the time interval between the protection devices, such as substation relays, reclosers, customer relays, and PV customer relays. The simulation results confirmed that the proposed operational modes and setting-value algorithms are useful and effective for protection coordination in a distribution system for a PV system.
This paper presents the final configuration of test field and test items for the application of IEC 60364-4-44 in Korea. IEC 60364-4-44 provides rules for the protection against the effects of conducted and radiated disturbances on electrical installations. Especially this standard deals with the protection of low voltage facility against the ground fault in the high voltage side of power distribution system. Many countries define the regulations on the use of electrical facilities based on their own power system and technical references which are considered to be suitable for them. The background of circuit of IEC 60364-4-44 is based on the ungrounded system as most of European countries. However, domestic electric power distribution system is based on multi-grounding system different from European system. Therefore, it is necessary to evaluate or prove the effect of the IEC 60364-4-44 for introducing and applying it to the domestic grounding system as a national standard. The authors with KEA(Korea Electric Association) carried out a project on the application of IEC 60364-4-44 to Korean electrical installations of buildings sponsored by Korean ministry of commerce, industry and energy for three years(2004.4.1$\sim$2007.3.31). The test field is established in K.E.R.I.(Korea Electrotechnology Research Institute), which is the purpose of evaluating the formula to calculate touch voltage and stress voltage in the IEC standards. This paper presents some considerations and final configuration of test field to evaluate and introduce the IEC 60364-4-44 applicable to domestic rule for the protection against ground fault.
Ji, Sungho;Song, Bangwoon;Kim, Byungki;Rho, Daeseok
Journal of the Korea Academia-Industrial cooperation Society
/
v.14
no.6
/
pp.2971-2978
/
2013
Recently, with the world-wide issues about global warming and CO2 reduction, a number of distributed generations(DGs) such as photovoltaic(PV) and wind power(WP), are interconnected with the distribution systems. However, DGs can change the direction of the power flow from one-direction to bi-direction, and also change the direction and amount of fault current of existing distribution systems. Therefore, it may cause the critical problems on the power quality and protection coordination. This paper proposes an operation algorithm for bi-directional protection coordination using and apply it for the evaluation system for protection coordination. From the simulation results It is found that the proposed method is more effective and convenient than existing method.
The Transactions of the Korean Institute of Electrical Engineers A
/
v.52
no.7
/
pp.421-428
/
2003
After the cable is installed, many geometric factors, such as bowing types of the cable and the length difference of the cable between each minor section will cause the impedance unbalance between cables. The impedance unbalance will increase or decrease the sheath circulating currents, which are critical to human safety and sustaining the capabilities of electric power. Accordingly, in this paper, a new method is also proposed to reduce the sheath circulating currents and an reduction equipment according to the theory of the new method is developed. The reduction equipment is tested when the cable is on service. The test results show that it can reduce the sheath circulating currents by up to 97.8[%]. This confirms the validation of the new method and the reduction equipment, and assures the safe operation of the transmission cables. In order to illustrate the safe operation of the cable with new current reduction equipment at transient state due to lightning and single line-to-ground fault, extensive simulations have been made. Then the protection scheme of sheath circulating currents reduction equipment is proposed by adopting the new device of RDP(Reduction Device Protector).
HVDC(High Voltage Direct Current) transmission system was constructed between Cheju island and mainland Haenam and has been operating commercially since 1998. But research activities in this area are not so much. That is caused by the facts that HVDC is large scale system and it is not so easy to implement and to test. Though such simulation tools as RTDS(Real Time Digital Simulator) and EMTDC can be useful, these have limitations for actual control and protective system design. Therefore scaled-down HVDC model was developed for the purpose of researches at operating technique, control and protection methods. The design of this model was based on real Cheju-Haenam HVDC system. And additionally faults simulator such as ground fault, short-circuit and change of impedance in transmission line is equipped for analysis of these faults. Control system of the model was implemented fully digitally. So it is very easy for the researchers to develope control and protection algorithm and to test the performance.
This paper analyses the transient phenomena against single line to ground fault and lightning surge between Korea and Japan on underground power cable systems. For analysis, find proper earthing resistance of neutral grounding system adopted in Japan. This paper is expected to contribute the establishment of proper protection methods against transients on underground power cable systems.
6.6KV 고전압 위험으로 접지계기용변압기(GPT)와 영상변류기(ZCT)의 2차측에 전압 전류 시험 유입방식으로는 해당 지락보호계전기의 정.부동작이 정확한지 검증이 되지 않아 안전사고 발생의 우려성이 존재하고 있었으며, 이의 해결을 위하여 6.6KV 고압측에 인공지락시험을 통하여 국내외 일부 계전기의 동작 전압 전류 극성이 사양과 상이한 것을 발견하여 실계통에 합당하도록 시정함과 동시에 감전시 인체 저항을 감안한 지락보호계전기(OVGR, SGR) 정정값을 도출하여 인명을 보호하게 하기 위한 지락보호계전 시스템에 대한 연구이다.
This paper deals with the analysis of field condition for earth leakage current alarming system in the stage lighting, stage sound stage machinery installation. These analyses of field condition were carried out in accordance with investigating an installation of earth leakage current alarming system with respect to a main line of power source, dimmer, sound equipment, machinery mobile unit equipment and so on. As a result of analyses. The earth leakage current alarming system has been installed only a part of the main line of power source and the probability of places which were installed was less than 50(%). Therefore, it is desirable that the earth leakage current alarming system is installed at places which are suitable, for example, dimmer, each kind machinery etc. in order to prevent electrical hazard.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.