• Title/Summary/Keyword: ground fault

Search Result 738, Processing Time 0.028 seconds

Insulation Reinforcement of the Electrical Power Cable Degradated by the Water Tree Using Silicon (실리콘을 이용한 수트리 열화된 전력 케이블의 절연 보강)

  • Kang, Hyeong-Gon;Park, Jun-Chae;Ko, Seok-Cheol;Lim, Sung-Hun;Lee, C.H.;Hanh, Y.B.;Han, B.S.
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2003.07a
    • /
    • pp.468-471
    • /
    • 2003
  • Fault of under ground power cable occurs usually from the water tree such as the vented tree, the bow tree and the water-rich halo. The water tree penetrates to the polyethylene cable insulations. Sometimes, the water tree also diffuses to mother cable in the substation. In this paper, instead of replacement of the faulty cable, we tried to cure an electrical power cable degraded by the water trees with silicon injection method. And measured the results with the isothermal relaxation current analysis method. After cable cure, Chonil line was improved from 2.27 to 1.96 in a phase, from 2.148 to 2.020 in b phase, and from badness to 2.192 in c phase. And Keumam line was also improved from 2.419 to 1.920 in a phase, from 2.301 to 2.000 in b phase, and from badness to 1.957 in c phase.

  • PDF

A Study on Development of Scaled-down HVDC Model (HVDC의 축소형 모델 개발에 관한 연구)

  • Ahn, Jong-Bo;Yun, Jae-Young;Kim, Kook-Hun;Lee, Jong-Moo;Kim, Jong-Moon;Lee, Ki-Do
    • Proceedings of the KIEE Conference
    • /
    • 1999.11b
    • /
    • pp.219-221
    • /
    • 1999
  • HVDC(High Voltage Direct Current) transmission system was constructed between Cheju island and mainland Haenam and has been operating commercially since 1998. But research activities in this area are not so much. That is caused by the facts that HVDC is large scale system and it is not so easy to implement and to test. Though such simulation tools as RTDS(Real Time Digital Simulator) and EMTDC can be useful, these have limitations for actual control and protective system design. Therefore scaled-down HVDC model was developed for the purpose of researches at operating technique, control and protection methods. The design of this model was based on real Cheju-Haenam HVDC system. And additionally faults simulator such as ground fault, short-circuit and change of impedance in transmission line is equipped for analysis of these faults. Control system of the model was implemented fully digitally. So it is very easy for the researchers to develope control and protection algorithm and to test the performance.

  • PDF

Application of GPR Technology for Detecting Bedrock under Conductive Overburden and Geological Survey (전도성 충적지반의 지질 및 하부 기반암 조사를 위한 지하레이다(GPR)의 적용)

  • 윤운상;배성호;김병철;김학수
    • Tunnel and Underground Space
    • /
    • v.5 no.2
    • /
    • pp.114-122
    • /
    • 1995
  • The principle and applications of GPR(Ground Penetrating Radear) are familiar to engineering geologists and geophsicists as very attractive technique for continuous high resolution images of the subsurface. However, the main limitation of GPR is obviously related to presence of clayey or silty conductive soils, resulting in complete attenuation of radar signals. This difficulty gives hesitation for the exploration of the deeper targets for example detecting bedrock, particularly in Korean situation that most regions have conductive overburden. In order to prove usefulness of geological survey with GPR in that situation, the technique was tried to investigate depth of bedrock under thick conductive overburden and the other geolocgical informations for the constructionof foundation in the Dongbu apartment site, Kimhae. The reflection patterns on the processed GPR sections are well correlated with the geotechnical units-bedrock, alluvium, landfill unit and their internal layer-boundaries of boring data before GPR survey, except upper contact of bedrock. The isopach maps of the geotechnical units for the 3-D interpretations are made from GPR sections. The maps provided useful geological information that bedrock was distributed as plain and valley with 22~27m depth under alluvium unit (this depth is 5~8 m deeper than drill log) and sedimentary layers subsided and bended along growth fault with NNE strike/15$^{\circ}$SE dip in alluvium unit.

  • PDF

Orbit Ephemeris Failure Detection in a GNSS Regional Application

  • Ahn, Jongsun;Lee, Young Jae;Won, Dae Hee;Jun, Hyang-Sig;Yeom, Chanhong;Sung, Sangkyung;Lee, Jeong-Oog
    • International Journal of Aeronautical and Space Sciences
    • /
    • v.16 no.1
    • /
    • pp.89-101
    • /
    • 2015
  • To satisfy civil aviation requirements using the Global Navigation Satellite System (GNSS), it is important to guarantee system integrity. In this work, we propose a fault detection algorithm for GNSS ephemeris anomalies. The basic principle concerns baseline length estimation with GNSS measurements (pseudorange, broadcasted ephemerides). The estimated baseline length is subtracted from the true baseline length, computed using the exact surveyed ground antenna positions. If this subtracted value differs by more than a given threshold, this indicates that an ephemeris anomaly has been detected. This algorithm is suitable for detecting Type A ephemeris failure, and more advantageous for use with multiple stations with various long baseline vectors. The principles of the algorithm, sensitivity analysis, minimum detectable error (MDE), and protection level derivation are described and we verify the sensitivity analysis and algorithm availability based on real GPS data in Korea. Consequently, this algorithm is appropriate for GNSS regional implementation.

Problems and Inprovement Method of Grounding System in Electrical Facilities (건축전기설비에 적용되는 접지시스템 문제점과 개선방안)

  • Chung, Young-Ki;Kwak, Hee-Ro;Shin, Hyo-Sub;Chung, Chun-Byoung;Nam, Taik-Joo
    • Electric Engineers Magazine
    • /
    • v.228 no.8
    • /
    • pp.52-57
    • /
    • 2001
  • Presently the Korean grounding system uses TN system, multi-grounding method with IT independent grounding method. Nevertheless TN system can't exist with TT system in the technological terms. If they coexist, it causes ground-fault circuit not to operate, and brings about different electrical potential rise by customer system. It brings about serious problems for safety. This paper aims for improving method of grounding system based on the technical analysis on instances in foreign countries and Korea. Almost standards and construction manner were apt to be internationalized after WTO/TBT agreement was concluded. The internal grounding systems should meet the international criteria and reliability for safety, and be provided with technologically impeccable standards.

  • PDF

A Simultaneous Perturbation Stochastic Approximation (SPSA)-Based Model Approximation and its Application for Power System Stabilizers

  • Ko, Hee-Sang;Lee, Kwang-Y.;Kim, Ho-Chan
    • International Journal of Control, Automation, and Systems
    • /
    • v.6 no.4
    • /
    • pp.506-514
    • /
    • 2008
  • This paper presents an intelligent model; named as free model, approach for a closed-loop system identification using input and output data and its application to design a power system stabilizer (PSS). The free model concept is introduced as an alternative intelligent system technique to design a controller for such dynamic system, which is complex, difficult to know, or unknown, with input and output data only, and it does not require the detail knowledge of mathematical model for the system. In the free model, the data used has incremental forms using backward difference operators. The parameters of the free model can be obtained by simultaneous perturbation stochastic approximation (SPSA) method. A linear transformation is introduced to convert the free model into a linear model so that a conventional linear controller design method can be applied. In this paper, the feasibility of the proposed method is demonstrated in a one-machine infinite bus power system. The linear quadratic regulator (LQR) method is applied to the free model to design a PSS for the system, and compared with the conventional PSS. The proposed SPSA-based LQR controller is robust in different loading conditions and system failures such as the outage of a major transmission line or a three phase to ground fault which causes the change of the system structure.

Seismic Performance Analysis of RC Bridge Piers with 3.5 Aspect Ratio depending on Testing Methods (형상비 3.5 RC교각의 실험 방법에 의한 내진성능 분석)

  • Hong, Hyun-Ki;Park, Chang-Young;Chung, Young-Soo
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.04a
    • /
    • pp.93-96
    • /
    • 2008
  • This paper deals with the shaking table test(STT), the Quasi-Static Test(QST), and the Pseudo-Dynamic Test(PDT) to evaluate the seismic performance of RC bridge piers under near fault ground motion. Five scaled specimens were constructed the weight of the superstructure was applied through the prestressing strand at the centroid of the column section during the QST and PDT. However, the STT was simulated. The lateral inertia force of the superstructure by the mass frame which was linked with the pier because of the limited payload of shaking table. Particularly for the STT, friction underneath the mass frame was minimized by special details and it was verified by a series of pre-load test. Scale factor of the RC piers was 4.25.

  • PDF

A Case Study on the Field Monitoring of the Deep Rock Excavation Site in Urban Area (도심지 대심도 암반 굴착현장에서의 Face Mapping 적용사례)

  • Kim, Tae-Seob;Kim, Hyung-Min;Jo, Choong-Sick;Kang, Tae-Seong
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.1307-1316
    • /
    • 2009
  • In this case, powerfulness quorum of destruction side which we have expected are supposed general limit value for rock floor when retaining of earth on the section of rock floor in the urban area. For digging in the urban area, there are a lot of dislocations to be disadvantage for safety of digging ants. The displacement of the pondside didn't converged with the phase of the excavation. Also, the speed of displacement got higher than the percentages of risk in the construction. So, we put into operation Face mapping for checking special quality of dislocations which appear on the digging ants. This results were used to decide a destruction in the case of the final excavation by analyzing with other results. It was possible to know the unstable distribution of a fault line in Face Mapping and to get powerful lens of a surface of discontinuity by tests indoors and outdoors. The results were also used to make a solution. Therefore, It's a successful example using the Partial TopDown for stable digging. And it is important that Face Mapping have to be practiced for solving the uncertainty of ground organization when digging design in the urban city.

  • PDF

A Study on the Development of a Remote Monitoring Equipment for Ground Fault Current by Lightning Strike (낙뢰에 의한 지락전류 원격 감시장치에 관한 연구)

  • Pyo, Se Young;Kim, Tag Yong;Kim, Kee Hwan
    • The Journal of the Convergence on Culture Technology
    • /
    • v.6 no.4
    • /
    • pp.783-788
    • /
    • 2020
  • Surges generated by direct strike or induction of lightning, frequent opening and closing of power system breakers, etc. cause excessive overvoltage, which can interfere with normal operation of transformers, circuit breakers, and power equipment. In order to prevent such phenomena, this study goes further from the method of establishing countermeasures by installing lightning arresters on power equipment or lines in parallel, and furthermore, remotely checking the condition of the lightning arrester and preparing immediate countermeasures when an event occurs. The purpose of the study is to prevent damage in advance.

A Study on Degradation Pattern of GIS Using Clustering Methode (군집화 기법을 이용한 GIS 열화 패턴 연구)

  • Lee, Deok Jin
    • Journal of the Korean Institute of Electrical and Electronic Material Engineers
    • /
    • v.31 no.4
    • /
    • pp.255-260
    • /
    • 2018
  • In recent years, increasing electricity use has led to considerable interest in green energy. In order to effectively supply, cut off, and operate an electric power system, many electric power facilities such as gas insulation switch (GIS), cable, and large substation facilities with higher densities are being developed to meet demand. However, because of the increased use of aging electric power facilities, safety problems are emerging. Electromagnetic wave and leakage current detection are mainly used as sensing methods to detect live-line partial discharges. Although electromagnetic sensors are excellent at providing an initial diagnosis and very reliable, it is difficult to precisely determine the fault point, while leakage current sensors require a connection to the ground line and are very vulnerable to line noise. The partial discharge characteristic in particular is accompanied by statistical irregularity, and it has been reported that proper statistical processing of data is very important. Therefore, in this paper, we present the results of analyzing ${\Phi}-q-n$ cluster distributions of partial discharge characteristics by using K-means clustering to develop an expert partial discharge diagnosis system generated in a GIS facility.