• Title/Summary/Keyword: geotechnical instrumentation

Search Result 91, Processing Time 0.019 seconds

Sedimentation & Consolidation Behaviour of Dredged Clay Fill (준설매립 점토지반의 침강 . 압밀거동)

  • 이승원;지성현;유석준;이영남
    • Journal of the Korean Geotechnical Society
    • /
    • v.16 no.4
    • /
    • pp.149-156
    • /
    • 2000
  • Sedimentation and self-weight consolidation tests in cylinder and large model tank and field measurement such as settlement and pore water pressure at each layer by wireless automatic instrumentation system were carried out to investigate the behaviour of dredged marine clay fill. The consolidation behaviour for each reclaimed layer was analyzed from these measured data and numerical analysis result using finite strain consolidation theory. It was fond from this study that the consolidation behaviour of dredged clay fill is heavily dependent on the filling process.

  • PDF

The Hammer Energy Delivered to the Drilling Rod in the SPT 1 (표준관입시험시 롯드에 전달되는 해머의 낙하에너지 평가 1)

  • 조성민;정종홍;김동수;이우진
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2001.03a
    • /
    • pp.469-476
    • /
    • 2001
  • The Ν-value in the standard penetration test(SPT) is affected by the magnitude of the rod penetration energy transmitted from the falling hammer as well as the geotechnical characteristics of the ground. Understanding of the striking energy efficiency in the SPT equipment is getting important for that reason. The energy efficiencies of the doughnut hammer with the hydraulic lift system and the automatic trip hammer system were investigated through field tests using the instrumented rod and wave-signal acquisition systems including the pile driving analyzer(PDA) . The rod energy ratio, ΕR$\_$r/ was defined as the ratio of the energy delivered to the drilling rod to the potential free-fall energy of the hammer. It appears that the type of the hammer and lift/drop system had a strong influence on the energy transfer mechanism and ΕR$\_$r/ also varies according to the energy instrumentation system and the analysis methods.

  • PDF

Prediction of Consolidation Settlements at Vertical Drain Using Modular Artificial Neural Networks (모듈형 인공신경망을 이용한 연직배수공법에서의 압밀침하량 예측)

  • 민덕기;황광모;전형원
    • Journal of the Korean Geotechnical Society
    • /
    • v.16 no.2
    • /
    • pp.71-77
    • /
    • 2000
  • In this paper, consolidation settlements with time at vertical drain sites were predicted by artificial neural networks. Laboratory test results and field measurements of two vertical drain sites were used for training and testing neural networks. Predicted consolidation settlements by trained artificial neural networks were compared with measured settlements by field instrumentation. To improve the prediction accuracy, modular artificial neural networks were studied. From the results of applying artificial neural networks to the same situation, it was shown that modular artificial neural network model was more accurate for the prediction of the consolidation settlements than the general model.

  • PDF

The Hammer Energy Delivered to the Drilling Rod in the SPT 2 (표준관입시험시 롯드에 전달되는 해머의 낙하에너지 평가 2)

  • 조성민;정종흥;이우진;김동수
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2002.03a
    • /
    • pp.71-78
    • /
    • 2002
  • The N-value from the standard penetration test(SPT) is affected by the magnitude of the rod penetration energy transmitted from the falling hammer as well as the geotechnical characteristics of the ground. Understanding of the striking energy efficiency in the SPT equipment is getting important for that reason. The energy efficiencies of the various type of equipment were investigated through field tests using the instrumented rod and wave-signal acquisition systems including the pile driving analyzer(PDA). The rod energy ratio, ERr was defined as the ratio of the energy delivered to the drilling rod to the potential free-fall energy of the hammer. It appears that the type of the hammer and lift/drop system had a strong influence on the energy transfer mechanism and ERr also varies according to the energy instrumentation system and the analysis methods.

  • PDF

Problems of Field Instrumentation System in associaion with Seoul Subway Construction (서울지하철 건설공사 계측현황 및 개선방안)

  • 이인근
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.03c
    • /
    • pp.78-87
    • /
    • 2000
  • Enormous instruments have been installed to measure movement and stresses during and after the construction of Seoul Subway. However, a number of problems have been noticed and reported, such as planning, calibration, installation, contract procedure etc. Some of them are presented and discussed in this paper in order to call an attention to these problems and provide a baseline for the future improvement.

  • PDF

Development and Its Application of Dam Safety Management Technology (댐 안전관리 기술의 개발 및 활용 현황)

  • Shin, Dong-Hoon;Park, Han-Gyu
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.234-246
    • /
    • 2008
  • 최근 기상이변과 빈번한 지진발생 및 기타 내외적 요인에 의한 노화/열화 등으로 인하여 댐 안전관리 문제가 국가의 재난관리 차원에서 주요 이슈가 되고 있다. 이에 본 논문에서는 기존 댐에 대한 안전관리를 효율적으로 수행할 수 있도록 하기 위해 개발된 댐 안전관리 시스템(Dam Safety Management System)의 세부구성 및 기능 등에 대하여 소개하고, 향후 선진화된 댐 안전관리를 위해 보완되어야 할 부분에 대한 제언을 하였다.

  • PDF

Site Monitoring and Analysis of the Reinforced Slope with geogrid (지오그리드를 이용한 보강사면의 현장 계측 연구)

  • Kim, Jin-Man;Cho, Sam-Deok;Choi, Bong-Hyuck
    • Journal of the Korean Geosynthetics Society
    • /
    • v.2 no.3
    • /
    • pp.3-9
    • /
    • 2003
  • Geosynthetics as a reinforcing material for earth structures have ever increased due to their excellent economy, fine external appearance, and easy construction. Geogrids are high-strength, orientated-polymer grid structures used to reinforce soil. This paper deals with the construction and sire monitoring for a 5.1m high-reinforcd slope with $75^{\circ}$ steep. The purpose of site monitoring is to evaluate the applicability of reforced slope with geogrid. Full scale field performance during and after construction was monitored by incorporating instrumentation including strain gauges on the geogrid, and horizontal and vertical movements.

  • PDF

Analysis on the tunnel behavior characteristic in the excessive fractured zone distribution of rock area (파쇄대가 과대분포한 암반지역에서 터널의 거동특성에 관한 연구)

  • Park, Jae-Weon;Lee, Seung-Ho
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.18 no.4
    • /
    • pp.341-354
    • /
    • 2016
  • This article is to apply the tunnel support system selected after comparatively analyzing of RMR and tunnel instrumentation between the tunnel behavior characteristic predicted through geotechnical investigations and the numerical analysis at the design stage and the properties deformation occurred at the construction stage. This attempt results from the behavior characteristic of the tunnel excavation ground shown differently in accordance with the ground quality and reinforcement method. This, therefore, provide the data and results analysed the actual decision RMR-crown settlement & convergence and reduction of material property of ground as parameters. Also, it's shown that the tunnel designer is able to predict tunnel behavior characteristic when designing in bedrock areas excessively distributed faults and fractured zones.

The Use of Piles to Cut Slopes Design in Cohesive Soils (억지말뚝을 이용한 점성토지반 절토사면의 설계)

  • 홍원표;한중근;송영석
    • Journal of the Korean Geotechnical Society
    • /
    • v.15 no.5
    • /
    • pp.157-170
    • /
    • 1999
  • A new design technique is presented to stabilize cut slopes in cohesive soils by use of piles. The design method can consider systematically factors such as the gradient and height of slope, the number and position of pile's rows, the interval and stiffness of piles, etc. The design method is established on the basis of the stability analysis of slope with rows of piles. The basic concept applied in the stability analysis is that the soil across the open space between piles can be retained by the arching action of the soil, when a row of piles is installed in soil undergoing lateral movement such as landslides. To obtain the whole stability of slope containing piles, two kinds of analyses for the pile-stability and the slope- stability must be performed simultaneously. An instrumentation system has been installed at a cut slope in cohesive soil, which has been designed according to the presented design process. The behavior of both the piles and the soil across the open space between piles is observed precisely. The result of instrumentation shows that the cut slope has been stabilized by the contribution of stabilizing effect of piles on the slope stability in cohesive soil.

  • PDF

The Behavior of a Cut Slope Stabilized by Use of Piles (억지말뚝으로 보강된 절개사면의 거동)

  • Hong, Won-Pyo;Han, Jung-Geun;Lee, Mun-Gu
    • Geotechnical Engineering
    • /
    • v.11 no.4
    • /
    • pp.111-124
    • /
    • 1995
  • On development of mountaneous or hilly area, stability of cut slope should be provided to prevent undesirable landslides. When piles are used as a countermeasure to stabilize existing landslide, stabilities for both piles and slope should be simultaneously satisfied to obtain the whole stability of the slope reinforced by piles. In order to confirm the effect of stabilizing piles on slope stabilization, it is necessary to investigate the behavior of the slope, in which the piles are installed. In this paper, first, the countermeasures used commonly to control unstable slope in Korea were summerized systematically. Nezt, the behavior of piles and slope soil was investigated by instrumentation installed into a cut slope for an apartment stabilized by a row of piles. Instrumentation could present sufficient effect of piles on slope stabilization Construction works in front of the row of piles affected the displacement of piles and slope. The construction works were divided into four stages, i.e. initial cutting stage of slope, excavation stages for retaining wall and parking space, and construction of retaining wall. As the result of research, the applicability of the proposed design method could be confirmed sufficiently.

  • PDF