• 제목/요약/키워드: full-scale load test

검색결과 269건 처리시간 0.029초

실물인장실험시 변형률계를 이용한 전주에 작용하는 응력분석 (Stress Analysis Acting on Electric Pole using Strain Gauge from Full Scale Pull-Out Test)

  • 안태봉
    • 조명전기설비학회논문지
    • /
    • 제24권9호
    • /
    • pp.49-55
    • /
    • 2010
  • Many electric poles in the softground have been collapsed due to external load. In this study, 10 types of tests were performed with variation of location, numbers and depths of anchor blocks as well as depth of poles to find stresses acting on concrete electric poles. The stresses of concrete poles are relaxed at 600~700[kg] of tensile load, and stresses are concentrated at top of pole, and spread to lower part of pole. In the concrete pole collapse test, tensile load at failure was approximately 1,400[kg], which is twice of design load. As passive zone in the soil increases, the stresses acting on concrete pole are concentrated at lower part of pole based on moment arm earth pressure distribution.

부재 접합부가 아치형 연동온실의 구조 성능에 미치는 영향: 실대형 실험적 및 해석적 연구 (Effect of the Member Joint on Structural Performance of an Arch-type Multi-span Greenhouse: A Full-scale Experimental and Numerical Study)

  • 최만권;류희룡;조명환;유인호
    • 생물환경조절학회지
    • /
    • 제26권4호
    • /
    • pp.402-410
    • /
    • 2017
  • 본 연구에서는 실대형 실험과 구조해석을 통하여 현장에서 사용되는 기둥-서까래-도리, 기둥-도리-방풍벽 접합부를 적용한 강관 골조 플라스틱 연동온실의 정적 구조성능을 분석하였다. 실대형 재하실험 결과는 접합부를 강접합으로 가정한 구조해석 결과와 비교하여 구조물의 횡방향 강성과 각 부재의 하중분담률에서 많은 차이를 보였다. 동고 높이에서 측정한 수평변위는 실험과 구조해석의 차이가 40%이었고 수직변위는 89%의 차이를 보였다. S3 부재의 발생응력을 기준으로 한 각 부재별 하중분담률을 비교한 결과 실험과 구조해석에서 두 배 이상의 차이를 보이는 부재가 있었으며, 하부측벽이음(S2), 기둥 상부(S7) 등 주요 부재의 실험결과가 구조해석의 하중분담률을 재현하지 않았다. 현장에서 사용하는 접합부가 충분한 강성을 확보하지 않음으로써 구조물에 작용하는 외력을 각 부재에 적절하게 전달하지 못했으며 이로 인해 구조물의 강성이 저하되는 현상이 나타났다. 설계 단계에서 일반적으로 구조해석에 의해 결정되는 구조성능의 신뢰도는 접합부의 특성을 보다 면밀하게 고려했는지 여부에 따라 좌우 될 수 있다. 따라서 온실 구조 성능에 대한 신뢰성을 높이기 위해서는 온실에 사용되는 다양한 접합부를 고려할 수 있는 구조해석 기술의 개발이 필요하며 설계 기준에서 상세 설계 방법을 보다 명확히 규정해야 할 것으로 판단된다.

준능동 MR감쇠기가 설치된 실물크기 구조물의 분산제어 알고리즘 성능평가 (Performance Evaluation of Decentralized Control Algorithm of a Full-scale 5-story Structure Installed with Semi-active MR Damper Excited by Seismic Load)

  • 윤경조;박은천;이헌재;문석준;민경원;정형조;이상현
    • 한국소음진동공학회논문집
    • /
    • 제18권2호
    • /
    • pp.255-262
    • /
    • 2008
  • In this study, seismic response control performance of decentralized response-dependent MR damper which generates the control force using only the response of damper-installed floor, was experimentally investigated through the tests of a full-scale structure installed with large MR dampers. The performance of the decentralized control algorithm was compared to those of the centralized ones such as Lyapunov, modulated homogeneous friction, and clipped-optimal control. Hybrid mass damper were controlled to induce seismic response of the full-scale structure under El Centro earthquake. Experimental results indicated that the proposed decentralized MR damper provided superior or equivalent performance to centralized one in spite of using damper-installed floor response for calculating input voltage to MR damper.

콘크리트 모듈러 도로 축하중 거동 분석을 통한 설계 타당성 검증 (Design Validation through Analysis of Concrete Modular Road Behavior under Static Axial Loads)

  • 남정희;김우석;김기현;김연복
    • 한국도로학회논문집
    • /
    • 제17권6호
    • /
    • pp.37-45
    • /
    • 2015
  • PURPOSES : The purpose of this study is to validate the design criteria of the concrete modular road system, which is a new semi-bridge-type concept road, through a comparison of numerical analysis results and actual loading test results under static axial loads. METHODS : To design the semi-bridge-type modular road, both the bridge design code and the concrete structural design code were adopted. The standard truck load (KL-510) was applied as the major traffic vehicle for the design loading condition. The dimension of the modular slab was designed in consideration of self-weight, axial load, environmental load, and combined loads, with ultimate limit state coefficients. The ANSYS APDL (2010) program was used for case studies of center and edge loading, and the analysis results were compared with the actual mock-up test results. RESULTS : A full-scale mock-up test was successfully conducted. The maximum longitudinal steel strains were measured as about 35 and 83.5 micro-strain (within elastic range) at center and edge loading locations, respectively, under a 100 kN dual-wheel loading condition by accelerating pavement tester. CONCLUSIONS : Based on the results of the comparison between the numerical analysis and the full-scale test, the maximum converted stress range at the edge location is 32~51% of the required standard flexural strength under the two times over-weight loading condition. In the case of edge loading, the maximum converted stresses from the Westergaard equation, the ANSYS APDL analysis, and the mock-up test are 1.95, 1.7, and 2.3 times of that of the center loading case, respectively. The primary reason for this difference is related to the assumption of the boundary conditions of the vertical connection between the slab module and the crossbeam module. Even though more research is required to fully define the boundary conditions, the proposed design criteria for the concrete modular road finally seems to be reasonable.

공력해석 및 구조시험을 통한 소형 복합재 블레이드의 구조 안전성 평가 (Structural Integrity through Aerodynamic Analysis and Structural Test for Small Wind Turbine Composite Blade)

  • 장윤정;정진환;이장호;강기원
    • 한국유체기계학회 논문집
    • /
    • 제15권2호
    • /
    • pp.63-68
    • /
    • 2012
  • This paper deals with the aerodynamic analysis and structural test under estimated loading condition for small composite blade, which is utilized in dual rotor wind turbine system. Firstly, the front and rear blades of dual rotor wind turbine system were modeled using reverse engineering method. And using finite volume method, the aerodynamic forces were analyzed at the rated and cutout wind speed to identify the pressure distribution on blades. And then, the full scale structural tests were conducted according to load and strength based methodology in IEC 61400-2 to identify the structural integrity of composite blade.

순환골재와 쇄석을 이용한 연직배수재의 실내모형실험 (Full-Scale Model Test of Vertical Drain Materials using Recycled Aggregates and Crushed Stone)

  • 이달원;이정준
    • 한국농공학회논문집
    • /
    • 제54권5호
    • /
    • pp.103-111
    • /
    • 2012
  • In this study, the full-scale laboratory model test on utilization of recycled aggregates and crushed stone as vertical drains to use an alternative material of sand in soft ground is performed. The settlement and pore water pressure were measured to evaluate the discharge capacity and filed application, and the results were compared and analyzed through the finite element method. The measured and estimated settlement in all vertical drain materials decreases gradually with the load increase. The measured settlement 6.55~8.63 mm, and the estimated by the Hyperbolic model was 7.45~7.92 mm. So the model used for the analysis can be applied to the settlement estimation of the actual field. The variations of pore water pressure with time showed constantly regardless of the load in all vertical drainage materials. The pore water pressure was similarity to that of sand after rapid drawdown. Therefore, it was applicable to the field because discharge capacity was enough to be an alternative material to the sand which had been being used as the vertical drains.

프리스트레스트 콘크리트 실린더의 균열거동 연구 (Cracking Behavior of Prestressed Concrete Cylinder Pipe)

  • 정철헌;김종석;송나영
    • 한국안전학회지
    • /
    • 제23권6호
    • /
    • pp.122-130
    • /
    • 2008
  • The cracking behavior of prestressed concrete members is important for the rational evaluation of PCC pipes. However, the test data on the cracking behavior of PCC pipes are very limited. The purpose of the present study is to investigate the cracking behavior of PCC pipes under different settlement conditions. In this paper, experimental test on the full scale model of PCC pipe was conducted and observed in order to study cracking load in PCC pipes. Based test and FEM analysis results, this paper also presents the cracking load prediction in PCC pipe. Based on the numerical analysis results performed in this research, the cracking behaviors of PCC pipe with the variation of the settlement conditions were evaluated.

Seismic performance of precast assembled bridge piers with hybrid connection

  • Shuang, Zou;Heisha, Wenliuhan;Yanhui, Liu;Zhipeng, Zhai;Chongbin, Zhang
    • Structural Engineering and Mechanics
    • /
    • 제85권3호
    • /
    • pp.407-417
    • /
    • 2023
  • Precast assembled bridge piers with hybrid connection (PASP) use both tendons and socket connections. To study the seismic performance of PASP, a full-scale in-situ test was performed based on an actual bridge project. The elastic-plastic fiber model of PASP was established using finite element software, and numerical analyses were performed to study the influence of prestress degree and socket depth on the PASP seismic performance. The results show that the typical failure mode of PASP under horizontal load is bending failure dominated by concrete cracking at the joint between the column and cushion cap. The cracking of the pier concrete and opening of joints depend on the prestress degree and socket depth. The prestressing tendons and socket connection can provide enough ductility, strength, restoration capability, and bending strength under small horizontal displacements. Although the bearing capacity and post yield stiffness of the pier can be improved to some extent by increasing the prestressing force, ductility is reduced, and residual deformation is increased. Overall, there are reasonable minimum socket depths to ensure the reliability of the socket connection.

풍화암에 근입된 영구 앵커의 극한인발력 (Ultimate Uplift Capacity of Permanent Anchor Embedded in Weathered Rock)

  • 유남재;박병수;정길수;김진황
    • 산업기술연구
    • /
    • 제21권B호
    • /
    • pp.195-203
    • /
    • 2001
  • The purpose of this study is to estimate ultimate uplift capacity of permanent anchor which was cast into weathered rock. The ultimate uplift capacity was estimated from the load-displacement curve of four different anchors which have different bond length. The creep test was performed for 15minutes under the maximum load of each step in order to understand the load-transfer property of permanent anchor and to decide which anchor to choose. The destruction range of soil due to the changes in load was estimated by installing dial gauge on the ground which was cast into the weathered rock. Ultimately, the study on the behavior of the anchor case into the weathered rock was performed by comparing and analyzing the estimated result of the UUC obtained by the full scale pull out test in the field with the exsting theoretical and practical results of soil and rock anchor.

  • PDF