• Title/Summary/Keyword: freight train

Search Result 107, Processing Time 0.025 seconds

Effect of the Brake Shoe on the Brake Force of the Freight Car (화차용 브레이크 슈의 제동에 미치는 영향)

  • 최경진;이동형
    • Proceedings of the KSR Conference
    • /
    • 2001.10a
    • /
    • pp.125-130
    • /
    • 2001
  • It is vary importance that stopping distance for the freight train and need to design parameter of the brake force and friction coefficient. Acoording to the brake force between shoe and wheel less than the adhesion between wheel and rail. Because of vary difference between empty and weight car of 0∼500kN, this solution was made to application for variable loaded brake system. When the V=110km/h. the emergency stopping distance of freight train is about 700m, so this study was considered on the two condition, one of the increse brake force and to be different of the increse friction coefficient on the brake shoe. It was useful increse friction coefficient. Result of study, analyze effect of the brake shoe on the brake force of the freight car and high friction coefficient were proposed. To do this, ${\mu}$=0.155${\pm}$10% when S=600m on the V=110km/h of the train, 2 groove of friction surface on the temperature distribution were considered.

  • PDF

Optimization of longitudinal viscous dampers for a freight railway cable-stayed bridge under braking forces

  • Yu, Chuanjin;Xiang, Huoyue;Li, Yongle;Pan, Maosheng
    • Smart Structures and Systems
    • /
    • v.21 no.5
    • /
    • pp.669-675
    • /
    • 2018
  • Under braking forces of a freight train, there are great longitudinal structural responses of a large freight railway cable-stayed bridge. To alleviate such adverse reactions, viscous dampers are required, whose parametric selection is one of important and arduous researches. Based on the longitudinal dynamics vehicle model, responses of a cable-stayed bridge are investigated under various cases. It shows that there is a notable effect of initial braking speeds and locations of a freight train on the structural responses. Under the most unfavorable braking condition, the parameter sensitivity analyses of viscous dampers are systematically performed. Meanwhile, a mixing method called BPNN-NSGA-II, combining the Back Propagation neural network (BPNN) and Non-Dominated Sorting Genetic Algorithm With Elitist Strategy (NSGA-II), is employed to optimize parameters of viscous dampers. The result shows that: 1. the relationships between the parameters of viscous dampers and the key longitudinal responses of the bridge are high nonlinear, which are completely different from each other; 2. the longitudinal displacement of the bridge main girder significantly decreases by the optimized viscous dampers.

A Study on the Performance Elevation Methods of Next Generation Railway Freight Vehicles (차세대 철도화물차량의 성능향상방안에 관한 연구)

  • Ham Y.S.;Hong J.S.;Oh T.Y.
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2005.06a
    • /
    • pp.351-354
    • /
    • 2005
  • Research purpose of this project is intending Maintenance Free of freight car and speed up of freight train. At goods transport as heightening traveling by ship speed of freight train shortening raise railway share of physical distribution and stand on tiptoe to Northeast Asia physical distribution main country to contribute expect. This paper is the performance elevation methods of next generation railway freight vehicles.

  • PDF

Experimental Study on the Pneumatic Characteristics of Brake System for Freight Car (화차 제동장치의 공기압 특성에 관한 실험적 연구)

  • 남성원;문경호;이동형;최경진;권석진
    • Proceedings of the KSR Conference
    • /
    • 1999.05a
    • /
    • pp.110-115
    • /
    • 1999
  • Experimental study is conducted to clarify the pneumatic characteristics of brake system for freight car. KNR(Korean National Railroad)'s freight cars have the laden-tare type control valve of brake system. But, laden-tare type control valve has some shortcomings to match the high speed freight car. Newly developed diaphragm type control valve is introduced to adopt freight car for speed-up. The test using the formated train set consisted of 21 cars is conducted to estimate the pneumatic braking efficiency of the mixed train set. From the results of experiment, the pressure characteristics of each brake cylinder show similar patterns qualitatively. But, in the case of release and brake application, quantitative pressure values of brake cylinder are different.

  • PDF

A Study on the application of new railroad transportation facilities (철도 신물류운송방식의 적용성 검토)

  • 방연근;문대섭;정병현
    • Proceedings of the KSR Conference
    • /
    • 2001.10a
    • /
    • pp.62-73
    • /
    • 2001
  • The scope of this study is focused on the survey of new logistics transportation systems in railroad and case studies of new systems such as piggyback system, bi-modal system swapbody, and double stack train(DST). Piggyback system, bi-modal system, swapbody, and double stack train are reviewed in term of technological validity and economic validity in Korea. Piggyback - trailer does pass loaded weight limits but does not pass train limits and can not utilize the existing freight cars. Piggyback - cargo trunk does pass all the criteria and could be developed by a domestic technology. But this study suggests to expand the length of train cars to 18.300mm for accommodation of two cargo trucks. Bi-modal system and swapbody do also pass. Double stack train could only pass the loaded weights and does not meet the train limit and the possibility of using existing freight cars. Domestic technology could not development DST, due to civil engineering construction limits and low standard height of electric line, which could not afford to operate DST.

  • PDF

A Study on the Additional Train Scheduling Method (열차 증편방법에 관한 연구)

  • Kim, Young-Hoon;Rim, Suk-Chul
    • Journal of the Korean Society for Railway
    • /
    • v.17 no.4
    • /
    • pp.313-319
    • /
    • 2014
  • Additional train scheduling is often required to increase the capacity of transporting passengers or freight. In most previous studies on scheduling additional trains, operation time of the added train is designated first; and then the train operation feasibility is examined. However, it is often difficult to apply this approach to domestic trains because the density of the railroad network in Korea is high and various types of trains are in use. Moreover, for freight trains, it is even more challenging because the delay is accumulated due to lower priority whenever a freight train and a passenger train contend for a common segment of rail. In this paper, we address the additional train scheduling problem which entails finding a feasible schedule for an additional train having a fixed departure time or departure time windows. The problem is modeled as a mixed integer programming and a column generation technique is used to solve it.

A Column Generation Approach to Line Planning in Rail Freight Transportation (화물열차 노선계획 작성을 위한 열 생성 기반 최적화 모형 연구)

  • Park, Bum-Hwan
    • Journal of the Korean Society for Railway
    • /
    • v.15 no.2
    • /
    • pp.185-192
    • /
    • 2012
  • Line planning is to determine the frequency of trains on each line to satisfy origin-destination demand while minimizing total operation cost. However, different from the line planning in passenger transportation, it is more important at which intermediate stations each train should be stopped and shunted because the freight car handling works like drop-off or(and) pick-up can incur much time and high cost so that the delay deteriorates the quality of rail freight transportation service. We present an optimization model for constructing line plan in rail freight transportation to simultaneously minimize the train operation cost and total transportation time of freights. And we suggest a column generation approach for our problem, which can solve the real network instances in reasonable computation times.

Comparisons of Empirical Braking Models for Freight Trains Using P4a Distribution Valve (P4a 분배밸브를 사용하는 화물열차의 경험적 제동모델들의 비교)

  • Choi, Don Bum;Kim, Min-Soo;Lee, Kangmi;Kim, Young-Guk
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.1
    • /
    • pp.61-69
    • /
    • 2020
  • This study examined the braking characteristics of a heavy haul freight train with P4a distribution valves applied to domestic high-speed freight trains. A freight train was composed of 50 cars, which is twice the normal operation. A braking test was performed to confirm the characteristics of the braking of a heavy haul. The brake cylinder pressures were measured for emergency and service braking on the 1st, 10th, 20th, 30th, and 50th cars. Because the brake signal is transmitted to the pressure through the braking tube connected to the end of the train, the rear vehicle is braking later than the vehicle ahead. Therefore, it is necessary to predict the brake pressures in all cars in a train to supplement the results of the limited tests and calculate the braking distance. The pressure in each car was determined using empirical models of linear interpolation, stepwise, and exponential models, which provided reliable information. The predictive results of the empirical models were compared with the measured results, and the exponential model was predicted relatively accurately. These results are expected to contribute to the safe operation of heavy haul freight trains and can be used to predict the braking distance and calculate the level of impact between vehicles during braking.

Speed-up of the Railway Freight Services (철도화물의 고속화 방안)

  • Kim Hyun-Woong;Lee Dae-Seop;Lee Kyung-Chul;Kim Jin-Sun;Kim Kyung-Tae
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.1691-1694
    • /
    • 2004
  • This paper is aiming to study of the speed-up of the railway freight services. Recently investment in freight continues to support the growth both traditional and intermodal markets, and will begin to influence newer markets. Railways offer the highest speeds in ground-based transport systems and therefore offer competitive transport times on routes between large cities. In freight transport, top speeds of 100$\∼%$150km/h are competitive with the road transport. The speed of freight railway can be increased in particular by the creation of a network of freight corridors, the speed-up of freight train, and efficient transhipment installations.

  • PDF

Study of Kaesung Industrial Complex rail traffic increment (개성공단 철도운송 활성화 방안연구)

  • Cho, Chi-Hyun;Yoon, Dong-Hee
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.732-741
    • /
    • 2008
  • After freight train line opening between Munsan of South Korea and Bongdong of North Korea last December 2007, people's expectation and interest about trans North-South and continental railways have been increasing. However, the commercial traffic of freight by train has not been increased as much as we expected in the mean time road traffic is more increased. This study examined the Kaesong industrial complex which has a high rail accessibility. Especially, we interviewed the owners of enterprises in Kaesong to integrate their opinions for deriving the problems and improving the business conditions. Also, this study embodied the methods for improving rail freight traffic between North and South Korea. Based on this study, we expect more research will carry out on this field to reform the operation system of trans Korea railways by Kaesong industrial complex development project and the commercial reconversion from road to rail.

  • PDF