• 제목/요약/키워드: frame building

검색결과 1,091건 처리시간 0.03초

논항 정보 기반 "요리 동사"의 어휘의미망 구축 방안 (The Construction of Semantic Networks for Korean "Cooking Verb" Based on the Argument Information.)

  • 이숙의
    • 한국어학
    • /
    • 제48권
    • /
    • pp.223-268
    • /
    • 2010
  • The purpose of this paper is to build a semantic networks of the 'cooking class' verb (based on 'CoreNet' of KAIST). This proceedings needs to adjust the concept classification. Then sub-categories of [Cooking] and [Foodstuff] hierarchy of CoreNet was adjusted for the construction of verb semantic networks. For the building a semantic networks, each meaning of 'Cooking verbs' of Korean has to be analyzed. This paper focused on the Korean 'heating' verbs and 'non-heating'verbs. Case frame structure and argument information were inserted for the describing verb information. This paper use a Propege 3.3 as a tool for building "cooking verb" semantic networks. Each verb and noun was inserted into it's class, and connected by property relation marker 'HasThemeAs', 'IsMaterialOf'.

골조공사 기능인력의 임금산정 실태분석 (An Analysis on the Wage Estimation of Skilled Workers in the Frame Work)

  • 김현수;이준용;조병욱;한경민;손창백
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2020년도 봄 학술논문 발표대회
    • /
    • pp.224-225
    • /
    • 2020
  • The construction industry is a workforce dependent industry. However, problems with wages have occurred frequently from the past to the present, and the number of skilled workers is decreasing due to the influx of new skilled workers and the departure of existing skilled workers. In response, this paper surveyed the actual status of wage calculation and analyzed the problems and presented a rough improvement plan by surveying the functional personnel of domestic frameworks.

  • PDF

라이브러리 기반의 Texture Mapping 기법 활용연구 (Application of Library-Based Texture Mapping Method)

  • 송정헌;박수영;임효숙;김용일
    • 한국측량학회:학술대회논문집
    • /
    • 한국측량학회 2006년도 춘계학술발표회 논문집
    • /
    • pp.369-373
    • /
    • 2006
  • 본 연구는 3차원 도시 모델링을 위해 라이브러리 기반의 texture mapping 기법을 사용하여 건물 모델을 제작하였다. 이 기법은 건물의 종류 및 특성에 따라 라이브러리 형태로 구축되어있는 texture map을 선택, 출력하여 3차원 건물 프레임에 mapping하는 과정으로 이루어진다. 이 기법의 효과적인 적용을 위해 LiDAR 데이터를 이용하여 건물을 자동적으로 분류하였고, LiDAR 데이터와 수치지도를 이용하여 단위 모델 구현을 위한 건물의 3차원 프레임을 제작하였다. 또한 사실감 있는 건물 texture를 구현하기 위해 실제 건물의 지상사진을 이용하여 texture map 라이브러리를 구축하였다.

  • PDF

프랭크 로이드 라이트와 미즈 반 데르 로우의 고층건물 디자인 비교연구 (A Comparative Study on the High-rise Building Designs by Frank Lloyd Wright and Mies van der Rohe)

  • 권종욱
    • 건축역사연구
    • /
    • 제14권3호
    • /
    • pp.89-102
    • /
    • 2005
  • Frank Lloyd Wright and Mies van der Rohe are two of the most influential architects in modern architecture. In spite of the different values in their architectural lives, the design of high-rise building had been a continuous matter of primary concern for them. The purpose of this study is to compare the architectural characteristics of the two master architects in terms of building form, structure, function, and envelop skin. glass. Both of them shared with the principle of organic architecture even in the design of high-rise buildings. However, the specific approaches to realize it in high-rise buildings are significantly different. Although they emphasized the integration of building form and structure, Wright regarded the reinforced concrete structure as an organic form-giver, while Mies introduced the steel skeleton structure only as an efficient and flexible building frame. As primary finishing materials for high-rise buildings, glass was used for functional purpose by Wright, but for visual purpose by Mies.

  • PDF

구조BIM기반 공사비 상세분석 프로세스 구축 (Development of Construction Cost Analysis Process Based on Structural Building Information Modeling)

  • 이승일
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 추계 학술논문 발표대회
    • /
    • pp.237-238
    • /
    • 2012
  • As a way to improve productivity and integrated project delivery in construction industry, BIM(building Information Modeling) using IT technique is being studied and applied recently. S-BIM application Process was established that enable efficient work through Structural BIM detailed Model in consideration of the collaboration among relevant fields. This study has the objective applying S-BIM technique to enable effective Cost Analysis in initial design phase and presenting the method for practical works using Construction Cost Analysis Process based on S-BIM.

  • PDF

On the seismic behavior of a reinforced concrete building with masonry infills collapsed during the 2009 L'Aquila earthquake

  • Palermo, Michele;Hernandez, Ricardo Rafael;Mazzoni, Silvia;Trombetti, Tomaso
    • Earthquakes and Structures
    • /
    • 제6권1호
    • /
    • pp.45-69
    • /
    • 2014
  • The 2009 L'Aquila, Italy earthquake shook a high density area causing a wide spectrum of damage to reinforced concrete with infill buildings, one of the most common building types used in Italy. The earthquake has proven to be a "full-scale" laboratory to further understand building performance. This paper presents the first results of a joint research effort between the University of Bologna and Degenkolb Engineers, aimed at investigating the seismic behavior of an infilled frame building that collapsed during the earthquake. State-of-the-practice techniques were implemented as a way to determine the reliability of these modeling techniques in anticipating the observed building performance. The main results indicate that: (i) the state-of-the-practice techniques are able to predict the observed behavior of the buildings; (ii) the masonry infills have a great influence on the behavior of the building in terms of stiffness, strength and global ductility.

초고층빌딩 거푸집 공사의 장단점 비교에 관한 연구 (Comparative Study of Strength and Weakness of System Form in High-rise Building Project)

  • 박병주;유승규;김주형;김재준
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 춘계 학술논문 발표대회
    • /
    • pp.9-10
    • /
    • 2012
  • According to the recent trends in the construction business have been actively booming both overseas plant orders and high-rise buildings orders. In addition high-rise building projects have being promoted or is actually under construction in Korea. Frame structure review which is the most consuming period on high-rise building is essential on that project. In this study looks for the currently form system and compares to those large system used in high-rise buildings.

  • PDF

보-기둥구조 PC공동주택 골조공사 작업관계 분석 (Relationship Analysis of Field Work in Beam-Column System Frame Work of the Precast Concrete Public Apartment Building)

  • 김기호;김진원;김민준;이동건;손정락;이범식
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2022년도 가을 학술논문 발표대회
    • /
    • pp.41-42
    • /
    • 2022
  • This study analyzed the process related to the linkage between on-site work targeting the middle size Precast Concrete(PC) public apartment building with beam-column system and prepared on-site works flow relationship diagram in which the wet process consists of core Critical Path(CP) to prepare a network diagram of the Precedence Diagram Method(PDM). Through this study, it is expected that it will be possible to maximize the project management capability by suggesting a method to minimize risk factors and the optimized process management of the beam-column system PC public apartment building.

  • PDF

Performance assessment of RC frame designed using force, displacement & energy based approach

  • Kumbhara, Onkar G.;Kumar, Ratnesh
    • Structural Engineering and Mechanics
    • /
    • 제73권6호
    • /
    • pp.699-714
    • /
    • 2020
  • Force based design (FBD) approach is prevalent in most of the national seismic design codes world over. Direct displacement based design (DDBD) and energy based design (EBD) approaches are relatively new methods of seismic design which claims to be more rational and predictive than the FBD. These three design approaches are conceptually distinct and imparts different strength, stiffness and ductility property to structural members for same plan configuration. In present study behavioural assessment of frame of six storey RC building designed using FBD, DDBD and EBD approaches has been performed. Lateral storey forces distribution, reinforcement design and results of nonlinear performance using static and dynamic methods have been compared. For the three approaches, considerable difference in lateral storey forces distribution and reinforcement design has been observed. Nonlinear pushover analysis and time history analysis results show that in FBD frame plastic deformation is concentrated in the lower storey, in EBD frame large plastic deformation is concentrated in the middle storeys though the inelastic hinges are well distributed over the height and, in DDBD frame plastic deformation is approximately uniform over the height. Overall the six storey frame designed using DDBD approach seems to be more rational than the other two methods.

슬레이트지붕 개량사업 구조안전성 검토 (A Study on the Structural Safety of the Roof Improvement Project)

  • 강경수
    • 한국농촌건축학회논문집
    • /
    • 제20권1호
    • /
    • pp.19-26
    • /
    • 2018
  • The roof improvement project is being carried out under the government's leadership for the sake of national welfare. The project is to replace the asbestos slate roof with a metallic one. In this study, the structural safety of the improved roof was examined and the project guidelines were reviewed. The causes of the roof damage were investigated and the structural analysis was performed for the roof frame subject to wind and snow loads. Metallic roof assemblies have higher strength and load resistance capability than usual slate ones, so the structural safety is governed by the frame. The stresses of the roof frame elements caused by the wind and snow loads were analyzed according to roof frame with various spacings between the rafters and the purlins. Wind load analysis was performed by 24, 28, and 38 m/sec of the basic wind speed. Snow load analysis was carried out by 0.5, 1.0 and $2.0kN/m^2$ of the ground snow load. As the analysis result, the current spacing and the size of the lumber did not satisfy the Korean building code specification. To secure the safety of the roof improvement project, the spacing of the roof frame elements and the size of the lumber should be determined based on the analysis results by structural engineers.