• Title/Summary/Keyword: four major rivers project

Search Result 42, Processing Time 0.024 seconds

A Review of the Master Plan for Four Major Rivers Restoration Project

  • Park, Chang-Kun
    • Journal of Environmental Impact Assessment
    • /
    • v.18 no.6
    • /
    • pp.411-417
    • /
    • 2009
  • Lately the master plan for the Four Major Rivers Restoration Project has been released by the Ministry of Land and Maritime Affairs and relevant ministries. According to the master plan compared with the interim report made on 15 December 2008, the number of weirs for irrigation has increased from 5 to 16, the amount of dredging has increased from 220 million cubic metres to 570 million cubic metres, and the total cost estimated has increased from 14 trillion won to 22 trillion won. A critical review of the master plan by some research group will be summarized focused upon budget, objectives, securing water resource, dredging, and flood control etc. After various experts' forums and field surveys, it is concluded that the government should implement a joint-research program on assessing the impact of the project together with experts and citizens' groups as co-partners, in order to truly save or restore the four major rivers.

Future Agenda of the Four Major Rivers Restoration Project: Toward An Integrated Watershed Management System (4대강사업이 남긴 과제: 통합적 유역관리시스템의 구축)

  • Ahn, Hyung Ki
    • The Journal of the Korea Contents Association
    • /
    • v.17 no.3
    • /
    • pp.454-461
    • /
    • 2017
  • The Four Major Rivers Restoration Project was the multi-purpose green growth project on the four major rivers in South Korea. However, the Four Major Rivers Project has attracted significant criticism from various social groups and wider international groups, e.g. Friends of the Earth. This study reviews the four river restoration project from the standpoint of an evolutionary process of water paradigms. It reveals that the project has achieved its intended purpose yet, suggesting to apply some valuable lessons in the consideration of the integrated watershed management system. Finally, it urges to introduce tentatively named "Basic law on Water Management" preceded by enacting ordinances at local level, because it'll help us find out ways ahead for the Integrated Water law.

Analysis of Baseflow at Four Major Rivers using Web-based SWAT Bflow System (Web 기반 SWAT Bflow을 이용한 4대강 유역 기저유출 분석)

  • Kum, Dong-Hyuk;Moon, Jong-Pil;Ryu, Ji-Chul;Kang, Hyun-Woo;Jang, Won-Seok;Lim, Kyoung-Jae
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2011.05a
    • /
    • pp.373-373
    • /
    • 2011
  • Korean Government has been promoting Four River Restoration Project (i.e., Han, Geum, Nakdong, and Yeongsan rivers) since the second half of 2008. This project is expected to protect against floods and droughts by water resources management. Many researchers have study water resources management, but most studies were focused on direct runoff. However, in order to efficiently protect against floods and droughts, baseflow should be studied as well as direct runoff. Because baseflow has a great effect on streamflow, it needs to be correctly analyzed. For more accurate analysis of baseflow, direct runoff and baseflow from streamflow should be separated first. In this study, 12 flow gauging stations of four major rivers were selected, and flow data from them were obtained (2004-2010) through WAMIS and Web-based SWAT Bflow system (http://www.envsys.co.kr/~swatbflow) which was used to separate direct runoff and baseflow. Baseflow values of Pass 2 in SWAT Bflow system were used. As a result of this study, baseflow contribution was ranged from 23.4% to 68.6% and accounted for about 50% of streamflow. Through this study, it shows that in the case of the flow fluctuation, baseflow is more affected than direct runoff by changes in streamflow in a flood or dry season. Thus, baseflow estimation should not be overlooked for efficient water resources management. However, it has a limitation in this study that because this study used to select randomly 12 flow gauging stations, it did not show a common tendency on each watershed. It is important that flow gauging stations reflected on topographic characteristics of each watershed should be selected in a rigorous manner for further reliable and accurate baseflow estimation on four major rivers.

  • PDF

Research in information & communication technology for water in the four major rivers restoration project (4대강 사업에서 수자원 정보통신기술 발전방향연구)

  • Seo, Gang-Do;Jang, Sang-Bok;Lee, Dong-Hoon;Hwang, Jae-moon;Park, Byung-Don
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2013.10a
    • /
    • pp.184-187
    • /
    • 2013
  • The Four Major Rivers Restoration Project of is the multi-purpose green growth project in South Korea. Some of the project was progressed by K-water and was declared complete on October 21, 2011. The Four Rivers Restoration Project of Korea was designed to be a packaged project that aims to resolve water-related problems such as floods and droughts and revitalize Korean public spaces near the water. K-water have applied the latest ICT(Information and Communication Technology) for the operating management of 4 Rivers Project facilities. We also have applied ICT for integrating drinking water production facilities. Applying these ICT, we have many experience for integrated water resources management, so we proposed. The first is that the big data collected should be analyzed for making decisions and taking actions while considering multiple viewpoints of how water should be managed. The second is that the new MMI(Man Machine Interface) program should be developed to use domestic needs and promote ease of maintenance for the integrated operation. The third is that the standardization of communication protocol is needed for seamless communication between equipments.

  • PDF

A Study on the Estimation of Remaining Fisheries Damages Considering the Recovery Periods of Fisheries Resource after the Completion of Undertaking Yeongsan River Project (영산강 살리기 사업 이후의 자원회복기간을 고려한 잔존어업피해추정에 관한 연구)

  • Choo, Hyun-Gi;Jo, Mun-Kwan;Kim, Ki-Soo
    • The Journal of Fisheries Business Administration
    • /
    • v.51 no.4
    • /
    • pp.1-18
    • /
    • 2020
  • The paper aims to explore existence and degree of remaining fisheries damages after the completion of undertaking the Four Major Rivers Project focusing on the case of Yeongsan river. The paper seeks to show the necessity of consideration of periods of fishery resources recovery in the estimation of ex-post fisheries damages of the project by inferring the analysis of the annual variation of environmental indicators in the river. Therefore, the paper suggests three years of remaining periods of fisheries damages of the project utilizing the variation trend of ex-ante and ex-post annual output data of inland fisheries in Jeonnam province and individual catch of fisheries. In the measurement of the annual degree of fisheries damages during periods of fishery resources recovery, the paper attempts to suggest the method of comparision of day catch data per vessel between ex-ante and ex-post periods of the project, which were investigated by the same institute. Here the paper tries to make correction of ex-post catch data for holding the same catching condition as ex-ante situation by adopting the concept of competitive intensity of catching which was derived from the decreasing rate of number of fishing households in the area of Yeongsan river.

Reassessment on the Four Major Rivers Restoration Project and the Weirs Management (4대강 살리기사업의 재평가와 보의 운용방안)

  • Lee, Jong Ho
    • Journal of Environmental Impact Assessment
    • /
    • v.30 no.4
    • /
    • pp.225-236
    • /
    • 2021
  • The master plan for the Four Rivers Restoration Project (June 2009) was devised, the procedure of pre-environmental review (June 2009) and environmental impact assessment (Nov. 2009), and post-environmental impact survey were implemented, and 4 times audits also inspected. and finally the Ministry of Environment's Four Rivers Investigation and Evaluation Planning Committee proposed the dismantling or partial dismantling of the five weirs of the Geum River and Yeongsan River. But controversies and conflicts are still ongoing. Therefore, this study intend to reestablish the management plan for the four major rivers by reviewing and analyzing the process so far. The results are as follows. First, a cost-benefit analysis should be performed by comparing the water quality impact of weir operation and weir opening. Therefore, it is inevitably difficult to conduct cost-benefit analysis. Second, according to the results of cost-benefit analysis on the dismantling of the Geum River and the Yeongsan River, the dismantling of the weir and the regular sluice gate opening was decided. However, there is a problem in the validity of the decision to dismantle the weir because the cost-benefit analysis for maintaining the weir is not carried out. Third, looking at the change in water quality of 16 weirs before and after the Four Major Rivers Restoration Project, COD and Chl-a were generally deteriorated, and BOD, SS, T-N, and T-P improved. However, in the cost-benefit analysis related to water quality at the time of weir dismantling, only COD items were targeted. Therefore, the cost of BOD, SS, T-N, and T-P items improved after the project were not reflected in the cost-benefit analysis of dismantling weirs, so the water quality benefits were exaggerated. Fourth, in the case of Gongju weir and Juksan weir, most of them are movable weirs, so opening the weir alone can have the same effect as dismantling when the water quality deteriorates. Since the same effect can be expected, there is little need to dismantle the weirs. Fifth, in order to respond to frequent droughts and floods, it is desirable to secure the agricultural water supply capacity to the drought areas upstream of the four majorrivers by constructing a waterway connected to the weir. At present it is necessary to keep weirs rather than dismantling them.

The Effects of the Four Major Rivers Restoration Project on Regional Economy (4대강 살리기 사업의 지역경제 파급효과)

  • Yoo, Seung-Hoon;Park, Dooho
    • Journal of Wetlands Research
    • /
    • v.15 no.2
    • /
    • pp.159-164
    • /
    • 2013
  • The 4 major rivers restoration project (4RRP) requires the government to invest a lot of money. Regional economic effect is one of the main purposes of implementing the 4RRP. This paper attempts to measure the regional economic effects, focusing on regional employment-inducing effect and regional income-inducing effect. Regional employment-inducing effect is computed by excluding indirect effect and directly investigating the amount of employment. To this end, marginal propensity to consume, household consumption, household income should be derived. We used working day data and government expenditure multiplier to measure local employment creation and income generation. As a result, the project creates 46,628 employments from 2009 to 25 August 2011 and generates 25 trillion won regional income for three years.

Analysis of Water-Quality Constituents Variations before and after Weir Construction in South Han River using Probability Distribution (확률분포를 이용한 남한강 보 건설 전·후 수질변화 분석)

  • Kim, Kyung Sub
    • Journal of Korean Society on Water Environment
    • /
    • v.35 no.1
    • /
    • pp.55-63
    • /
    • 2019
  • The Four Major Rivers Restoration Project started in 2009 and completed in early 2013 is a large-scale inter-ministry SOC project investing ₩22.2 $10^{12}$ and one of the Project's objectives was to enhance the water-quality grade through recovering the river eco-system and environment. The average concentration and probability distribution of water-quality constituents at given and selected sampling sites are very significant elements for analyzing and controlling the water-quality of rivers or reservoirs effectively. Average concentration can be estimated by point estimator, distribution function of water-quality constituents or Bootstrap method, in which the distribution function estimated with more data in case of insufficient dataset, is applied. Ipo and Gangcheon water-quality monitoring stations in South Han River were selected to compare and analyze the variation of concentration before and after Ipo and Gangcheon Weirs construction, using the whole 4-year's data, from 2005 to 2008 and from 2014 to 2017. Water-quality constituents such as BOD and COD relating to oxygen demanding wastes and TP and Chlorophyll-a relating to the process of nutrient enrichment called eutrophication were also selected. The guidelines for water-quality control and management after weir construction including evaluation of water-quality constituents' variations can be presented by this paper.

The Effect of The Special Law on the Waterfront-Space Use on Space and Landscape Change of Four Major Rivers - Focused on the EcoDeltaCity Project of Nakdong River - (4대강 친수구역 활용에 관한 제도가 하천 유역의 공간 변화에 미치는 영향 분석 - 낙동강 유역 에코델타시티 지역을 대상으로 -)

  • Kim, Jong Gu;Kim, Yu Jun;Kang, Youn Won;Hong, Ji Su
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.2
    • /
    • pp.699-710
    • /
    • 2014
  • Government enacted "The special Law on the waterfront-space" to conduct four-river refurbishment project and to construct systematically regions around national rivers from 2009. This law allows public apartments and recreational facilities etc. to be located around four-river, then the law may give rise to serious space change and landscape damage. So we draw some problems of the established development project about the riverside area, and expected a space and landscape change of waterfront-space with a 3D simulation. The result, it is important to adjust the development density of site and apply various contents with take the regional characteristics into consideration for sustainable development.