Browse > Article
http://dx.doi.org/10.14249/eia.2021.30.4.225

Reassessment on the Four Major Rivers Restoration Project and the Weirs Management  

Lee, Jong Ho (Department of Urban Planning and Real Estate, Cheongju University)
Publication Information
Journal of Environmental Impact Assessment / v.30, no.4, 2021 , pp. 225-236 More about this Journal
Abstract
The master plan for the Four Rivers Restoration Project (June 2009) was devised, the procedure of pre-environmental review (June 2009) and environmental impact assessment (Nov. 2009), and post-environmental impact survey were implemented, and 4 times audits also inspected. and finally the Ministry of Environment's Four Rivers Investigation and Evaluation Planning Committee proposed the dismantling or partial dismantling of the five weirs of the Geum River and Yeongsan River. But controversies and conflicts are still ongoing. Therefore, this study intend to reestablish the management plan for the four major rivers by reviewing and analyzing the process so far. The results are as follows. First, a cost-benefit analysis should be performed by comparing the water quality impact of weir operation and weir opening. Therefore, it is inevitably difficult to conduct cost-benefit analysis. Second, according to the results of cost-benefit analysis on the dismantling of the Geum River and the Yeongsan River, the dismantling of the weir and the regular sluice gate opening was decided. However, there is a problem in the validity of the decision to dismantle the weir because the cost-benefit analysis for maintaining the weir is not carried out. Third, looking at the change in water quality of 16 weirs before and after the Four Major Rivers Restoration Project, COD and Chl-a were generally deteriorated, and BOD, SS, T-N, and T-P improved. However, in the cost-benefit analysis related to water quality at the time of weir dismantling, only COD items were targeted. Therefore, the cost of BOD, SS, T-N, and T-P items improved after the project were not reflected in the cost-benefit analysis of dismantling weirs, so the water quality benefits were exaggerated. Fourth, in the case of Gongju weir and Juksan weir, most of them are movable weirs, so opening the weir alone can have the same effect as dismantling when the water quality deteriorates. Since the same effect can be expected, there is little need to dismantle the weirs. Fifth, in order to respond to frequent droughts and floods, it is desirable to secure the agricultural water supply capacity to the drought areas upstream of the four majorrivers by constructing a waterway connected to the weir. At present it is necessary to keep weirs rather than dismantling them.
Keywords
The Four Major Rivers Restoration Project; Environmental Impact Assessment; Weir Dismantling; Cost-Benefit Analysis;
Citations & Related Records
연도 인용수 순위
  • Reference
1 Korean Society of Environmental Engineers. 2018. Water quality evaluation and analysis of causes of water quality change in weir sections related to the Four Rivers Restoration Project, Volume 1 (Part 1-2, Investigation and Evaluation of Water Quality before and after the Four Major Rivers Project); pp. 558-559, 570, 573. [Korean Literature]
2 Board of Audit and Inspection. 2018. Audit Report - Inspection and performance analysis of the Four Major Rivers Restoration Project; pp. 4-5, 29-30, 213-214, 312, 340, 374, 390-391. [Korean Literature]
3 Economic Analysis Forum of the Four Major Rivers Investigation and Evaluation Team, Ministry of Environment. 2019. A socioeconomic analysis study on the management plan of the Geumgang and Yeongsan rivers. [Korean Literature]
4 Joint Ministries. 2021. 1st National Water Management Master Plan (2021-2030); p. 78. [Korean Literature]
5 Kwater. 2018. A Study on Standard of Reservoir Water Allocation (2nd Year); pp. 197-199. [Korean Literature]
6 Lee JH. 2010. National Projects and Impact Assessment by Presidential Promise, Journal of Environmental Studies, 49, Graduate School of Environmental Studies, Seoul National University. [Korean Literature]
7 Ministry of Land, Transport and Maritime Affairs, Four Rivers Restoration Promotion Headquarters. 2009. Master Plan for Restoring Four Rivers; pp. 7-8. [Korean Literature]
8 Ministry of Land, Infrastructure and Transport, Ministry of Environment, Ministry of Agriculture, Food and Rural Affairs, Korea Water Resources Corporation, National Institute of Environmental Research, and Korea Rural Community Corporation. 2017. Optimal linkage operation plan of dam-weir-reservoir; pp. 64-70. [Korean Literature]
9 https://www.kwater.or.kr/water/sub01/sub05/20060557/works.do?brdId=KO27&s_officecode=50039 531&s_flag=1&s_mid=1354
10 Korea Policy Briefing (https://www.korea.kr/news/pressReleaseView.do?newsId=155704737)
11 https://www.icold-cigb.org/GB/dams/definition_of_a_large_dam.asp
12 The Korean Association of Public Finance. 2019. A study on socioeconomic analysis on the management plan for river facilities in the Geum River and Yeongsan Rivers 59: 26-120. [Korean Literature]
13 Case information of the National Law Information Center (https://www.law.go.kr/LSW//precInfoP.do?precSeq=179811)