• Title/Summary/Keyword: forest-road network

Search Result 44, Processing Time 0.027 seconds

Computer-Assisted Map Analysis for Planning Forest Road Network (컴퓨터 지도분석(地圖分析)을 이용(利用)한 임도계획(林道計劃))

  • Lee, Kyu-Sung
    • Journal of Korean Society of Forest Science
    • /
    • v.80 no.3
    • /
    • pp.317-325
    • /
    • 1991
  • Route projection of forest road involves several constraints ranging from construction cost to environmental impacts. This study is designed to assess the capability of computer-assisted map analysis techniques for deriving several alternatives of forest road planning. Three cartographic models are presented to address the limit of slope, soil erosion, and aesthetic value in designing forest roads over a relatively small size of mountainous forest. Primary spatial analysis techniques used are distance measurements and connectivity analysis. The fundamental approach used was to generate a set of friction maps in which each friction map represents a combined restriction for a forest road projection. Products of the spatial analysis are compared by both qualitative and quantitative methods. The results demonstrate that computer-assisted map analysis has a potential to solve rather complex problems of forest road planning by providing several alternatives effectively.

  • PDF

The Techniques Development for the Possibility Area Analysis of Yarding Operation and the Forest-road Network Arrangement using GIS (GIS를 이용한 집재작업 가능구역 분석 및 노망배치를 위한 기법 작성)

  • Kwon, Hyun-Jung;Park, Sang-Jun
    • Journal of Korean Society of Forest Science
    • /
    • v.102 no.1
    • /
    • pp.143-155
    • /
    • 2013
  • In order to establish efficient timber harvesting system and provide the necessary data for the system establishment, the techniques to identify areas possible of the yarding-operation and design forest-road networks were newly developed and the applicability of the techniques are tested in this study. The new techniques were developed based on ArcGIS, particularly with utilizing the Viewshed Analysis Tool. From the results of the identification of the possible yarding-operation areas, it is found that the percentage of possible yardingoperation area decreases with the increment of maximum yarding distance due to terrestrial effects. When forest road networks are extended in impossible yarding-operation sites, the area of possible yarding-operation sites increases. If a forest road network is newly designed, its overall extension is altered, resulting in changes in the possible yarding-operation areas. Through the comparative analysis among the different possible yardingoperation areas from different forest road networks, the maximization of the yarding-operation possible area can be achieved. The results from this study can be utilized for establishing more efficient timber-harvesting system and developing GIS-based programs to manage the system.

Research on the Accessibility of Urban Green Space Based on Road Network- A Case Study of the Park Green Space in City Proper of Nanjing

  • Fan, Yong;Zhao, Ming-yuan;Ma, Lin;Zhao, Lan-yong
    • Journal of Forest and Environmental Science
    • /
    • v.32 no.1
    • /
    • pp.1-9
    • /
    • 2016
  • Accessibility of urban green space, as an important index of evaluating the service level of urban green space, not only shows the resident's access to green space, but also reflects the environment quality of urban living. Since the quantity, area and space distribution of the patches in urban green space directly affect the function of urban green space and the quality of urban environment, the research on the accessibility of urban green space holds great significance to improve the service of urban green space and the living environment quality. Based on GIS software, this research uses the road network and the population distribution data of Nanjing's city proper to conduct quantitative analysis of the accessibility of park green space and the convenience for residents to travel under different forms of transportation. After the case analysis, the author tests the application of road network in studying the accessibility of urban park green space and proposes a GIS-based method to study the accessibility and the rational layout of urban green space.

Exploring the Priority Area of Policy-based Forest Road Construction using Spatial Information (공간정보를 활용한 산림정책 기반 임도시공 우선지역 선정 연구)

  • Sang-Wook, LEE;Chul-Hee, LIM
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.25 no.4
    • /
    • pp.94-106
    • /
    • 2022
  • In order to increase timber self-sufficiency, Korea's 6th Basic Forest Plan aims to increase the density of forest roads to 12.8 m ha-1 by 2037. However, due to rapid re-forestation, current management infrastructure is insufficient, with just 4.8 m ha-1 of forest roads in 2017. This is partly due to time and cost limitations on the process of forest road feasibility evaluation, which considers factors such as topography and forest conditions. To solve this problem, we propose an eco-friendly and efficient forest road network planning method using a geographic information system (GIS), which can evaluate a potential road site remotely based on spatial information. To facilitate such planning, this study identifies forest road construction priorities that can be evaluated using spatial information, such as topography, forest type and forest disasters. A method of predicting the optimal route to connect a forest road with existing roads is also derived. Overlapping analysis was performed using GIS-MCE (which combines GIS with multi-criteria evaluation), targeting the areas of Cheongsong-gun and Buk-gu, Pohang-si, which have a low forest-road density. Each factor affecting the suitability of a proposed new forest road site was assigned a cost, creating a cost surface that facilitates prioritization for each forest type. The forest path's optimal route was then derived using least-cost path analysis. The results of this process were 30 forestry site recommendations in Cheongsong-gun and one in Buk-gu, Pohang-si; this would increase forest road density for the managed forest sites in Cheongsong-gun from 1.58 m ha-1 to 2.55 m ha-1. This evaluation method can contribute to the policy of increasing timber self-sufficiency by providing clear guidelines for selecting forest road construction sites and predicting optimal connections to the existing road network.

Comparison of Methodology and Accuracy of Digital Mapping of Forest Roads (수치임도망도 제작방법 및 정확도 비교)

  • Kim Tae-Geun;Yoon Jong-Suk;Woo Choong-Shik;Lee Kyu-Sung;Hong Chang-Hee
    • Spatial Information Research
    • /
    • v.13 no.3 s.34
    • /
    • pp.195-209
    • /
    • 2005
  • Forest road has been an essential infrastructure for various forestry practices as well as for recreational use, disaster management, and local economics promotion. Since 1980s, extensive network of forest roads has been constructed as an national project in Korea. However, due to the minimal-budget of the project, accurate maps of forest road are not usually available. Although forest road map is a main thematic layer for the forest Geographic Information System (FGIS), its locational accuracy has not been sufficient for the practical applications and, therefore, the update of digital forest road maps is urgent. The objectives of this study is to compare ae methodology of generating and updating digital forest road maps from the aspects of the map accuracy and the efficiency of methods. Four mapping methods (GPS surveying, satellite imagery, ortho aerial photograph, and digital photogrammetry) were applied to generate the forest road maps over the study area of Mt. Oseo in Chungchungnam-do, which has a 35km forest roads distributed in national, public and private forests. The forest road Imp produced by digital photogrammetric method is the most accurate and comparable to GPS surveying although it required the greatest amount of labor time.

  • PDF

Evaluation of Onshore Wind Resource Potential According to the Road Proximity (도로인접성에 따른 육상 풍력자원 잠재량 평가)

  • Kim, Hyun-Goo;Hwang, Hyo-Jung;Kang, Yong-Heack;Yun, Chang-Yeol
    • New & Renewable Energy
    • /
    • v.9 no.4
    • /
    • pp.13-18
    • /
    • 2013
  • Wind turbines should generally be installed at a certain distance from a road to ensure passengers' safety. In Korea, there is no clear guidance as the Ministry of Environment first proposed a road setback distance of 400 m in the Onshore Wind Farm Siting Guidelines draft proposed in July 2012, and then modified it to 1.5 times the height of the wind turbine in October of the same year. This study analyzed the dynamic range of onshore wind resource potential according to how the road setback distance is set using the Korea Wind Atlas with 100m spatial resolution made by the Korea Institute of Energy Research, the transportation network of the Ministry of Construction and Transportation, and the forest road network of the Korea Forestry Service. Owing to the geographical characteristics of Korea, where mountainous terrain accounts for 70% of the total territory, the wind resource potential within 1 km from forest roads are estimated to be 14.3 GW, 14% of Korea's total wind resource potential. In addition, the construction distance of new road for transporting wind turbines from the existing road to a wind farm site is estimated as less than 2 km. Given the limited wind resource potential and geographical constraints, an assessment system that can maximize wind resource utilization and ensure road safety at the same time, and which takes into account the regional characteristics instead of applying the fixed road setback distance across-the-road, is required.

Development of a Screening Method for Deforestation Area Prediction using Probability Model (확률모델을 이용한 산림전용지역의 스크리닝방법 개발)

  • Lee, Jung-Soo
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.11 no.2
    • /
    • pp.108-120
    • /
    • 2008
  • This paper discusses the prediction of deforestation areas using probability models from forest census database, Geographic information system (GIS) database and the land cover database. The land cover data was analyzed using remotely-sensed (RS) data of the Landsat TM data from 1989 to 2001. Over the analysis period of 12 years, the deforestation area was about 40ha. Most of the deforestation areas were attributable to road construction and residential development activities. About 80% of the deforestation areas for residential development were found within 100m of the road network. More than 20% of the deforestation areas for forest road construction were within 100m of the road network. Geographic factors and vegetation change detection (VCD) factors were used in probability models to construct deforestation occurrence map. We examined the size effect of area partition as training area and validation area for the probability models. The Bayes model provided a better deforestation prediction rate than that of the regression model.

  • PDF

Studies on the Design of Forest Road Network for Mechanized Yarding Operations (II) - Optimal road spacing and density - (기계화(機械化) 집재작업(集材作業)을 위한 노망정비(路網整備)에 관(關)한 연구(硏究)(II) - 적정임도간격(適正林道間隔) 및 임도밀도(林道密度) -)

  • Cha, Du Song;Cho, Koo Hyun
    • Journal of Korean Society of Forest Science
    • /
    • v.83 no.3
    • /
    • pp.299-310
    • /
    • 1994
  • This study was carried out to examine the optimal road spacing and road density to minimize the total harvesting cost(road construction cost plus yarding cost) for mechanized yarding system to roadside by one - and two-stage two-way in Forestry build-up region. Chunchon-kun, Kangwon-do. The estimated road construction costs were ranged from ten million won to sixty million won per km. The results have indicated that cable crane was appropriate for yarding machine by one-stage, two-way, and estimated optimal road spacing was 1,698m~4,192m, averaged 3,087m, and road density was 3.44m/ha~8.44m/ha, and averaged 5. 12m/ha. In hilly terrain, combination of medium yarder and Logging bogie was suited to yarding machine by two-stage, two-way, and calculated optimal road spacing was 1,483m~3,481m, averaged 2,589m, and road density was 4.05m/ha~9.46m/ha, averaged 5.90m/ha. In steep terrain, combination of medium yarder and jinsung winch was suited, and estimated optimal road spacing was 1,693m~3,982m, averaged 2,960m, and road density was 3.68m/ha~8.64m/ha, averaged 5.38m/ha.

  • PDF

Analysis of Spatial Patterns and Estimation of Carbon Emissions in Deforestation using GIS and Administrative Data (GIS와 행정정보를 이용한 교토의정서 제3조 3항 산림전용지의 공간패턴 및 탄소배출량 분석)

  • Lee, Jung-Soo;Park, Dong-Hwan
    • Journal of Forest and Environmental Science
    • /
    • v.27 no.1
    • /
    • pp.39-46
    • /
    • 2011
  • This study purposed to analyze the spatial pattern and the amount of carbon emission at the deforestation area in Gangwondo. Forest geographic information system(FGIS) and administrative data were used in the analysis. The area size and spatial patterns of deforestation area were analyzed according to the article 3.3 of Kyoto protocol. Forest administration data for 9 years from 2000 to 2008 were entered into a database. Fifty-nine percent of deforestation area was found within 200m of the road network, and seventy-five percent of the area was found within 500m. Theoretical carbon emission based on deforestation area was estimated at 6,968tc. Carbon emission of national forest was 5.7times higher than that of private forest.

Optimal Landing Location and Skid Trail Network Selection in Timber Harvesting Area (목재수확작업지의 적정 집재장 선정 및 작업로 배치)

  • Ji, Byoung-Yun;Oh, Jae-Heun;Park, Sang-Jun;Hwang, Jin-Sung;Cha, Du-Song
    • Journal of Forest and Environmental Science
    • /
    • v.27 no.3
    • /
    • pp.195-203
    • /
    • 2011
  • Forest in the our country is in the age that needs positive operation in order to foster economical forest. Multiple operations for making valuable forest should be conducted steadily and timely from afforestation to harvesting. In order to execute these kinds of forest operations, the construction of skid trail network that can be effectively used as a pathway for forestry machine and working space is necessary. To investigate facility effect of skid trail network, we executed the location of skid trail network through centroid method by GIS for 50ha of harvesting workplace in mechanized model forest located in Hongcheon, Gangwon Province. As a result of this research, skid trail density in this area changed from 79m/ha with current method to 42m/ha with improved method. It appeared that skid trail density with improved method is nearly half of current method even though the cutting area is the same as the current cutting area. Also, skidding distance changed from 117m with current method to 57m with improved method. It appears that skidding distance with improved method is nearly half of current method even though cutting area was enlarged in adjacent tending cutting area.