• Title/Summary/Keyword: flexible pin

Search Result 37, Processing Time 0.019 seconds

Optimum-selection in the Welding Process Variable for Torch-rotation Method of Automation Welding-machine System (토치 회전식 자동용접 시스템의 용접공정변수 최적선정)

  • 김재열
    • Journal of the Korean Society of Manufacturing Technology Engineers
    • /
    • v.6 no.2
    • /
    • pp.92-101
    • /
    • 1997
  • The purpose of this welding process of the exclusive welding-machine using welding torch-rotation type is to develop a mechanism which can solve the problem of twisting of welding wires and cables. The technique was developed by revising the torch position and smooth controlling of both the normal and reverse rotation. Some of the advantages of using the torch-rotation type apply to the work-rotation technique are the practical uses of increased work space and link work with the factory automation system. Do apply the welding process, I designed and made a special unit so called torch part in order to solve the problems of kinematical. And I made a control panel which can manipulate the progress of the entire process at the work shop. Even if it will be applied to another kind of axle casing's welding work, this process can be utilized if other sizes of the fixed pin and work part is produced and changed. The development of this exclusive welding-machine could reduce the manpower of skilled welding labor and increase productivity and better quality product in comparison to the handmade product.

  • PDF

FPGA based System for Pinhole Detection in Cold Rolled Steel (FPGA 기반의 냉연강판 핀홀 검출 시스템)

  • Ha, Sung-Kil;Lee, Jung Eun;Moon, Woo Sung;Baek, Kwang Ryul
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.21 no.8
    • /
    • pp.742-747
    • /
    • 2015
  • The quality of steel plate products is determined by the number of defects and the process problems are estimated by shapes of defects. Therefore pinholes defects of cold rolled steel have to be controlled. In order to improve productivity and quality of products, within each production process, the product is inspected by an adequate inspection system individually in the lines of steelworks. Among a number of inspection systems, we focus on the pinholes detection system. In this paper, we propose an embedded system using FPGA which can detect pinholes defects. The proposed system is smaller and more flexible than a traditional system based on expensive frame grabbers and PC. In order to detect consecutive defects, FPGAs acquire two dimensional image and process the image in real time by using correlation of lines. The proposed pinholes detection algorithm decreases arithmetic operations of image processing and also we designed the hardware to shorten the data path between logics due to decreasing propagation delay. The experimental results show that the proposed embedded system detects the reliable number of pinholes in real time.

Optimal Design of Network-on-Chip Communication Sturcture (Network-on-Chip에서의 최적 통신구조 설계)

  • Yoon, Joo-Hyeong;Hwang, Young-Si;Chung, Ki-Seok
    • Journal of the Institute of Electronics Engineers of Korea SD
    • /
    • v.44 no.8
    • /
    • pp.80-88
    • /
    • 2007
  • High adaptability and scalability are two critical issues in implementing a very complex system in a single chip. To obtain high adaptability and scalability, novel system design methodology known as communication-based system design has gained large attention from SoC designers. NoC (Network-on-Chip) is such an on-chip communication-based design approach for the next generation SoC design. To provide high adaptability and scalability, NoCs employ network interfaces and routers as their main communication structures and transmit and receive packetized data over such structures. However, data packetization, and routing overhead in terms of run time and area may cost too much compared with conventional SoC communication structure. Therefore, in this research, we propose a novel methodology which automatically generates a hybrid communication structure. In this work, we map traditional pin-to-pin wiring structure for frequent and timing critical communication, and map flexible and scalable structure for infrequent, or highly variable communication patterns. Even though, we simplify the communication structure significantly through our algorithm the connectivity or the scalability of the communication modules are almost maintained as the original NoC design. Using this method, we could improve the timing performance by 49.19%, and the area taken by the communication structure has been reduced by 24.03%.

Gastrointestinal Foreign Bodies in Children -Experiences of 60 Cases in Kangwon, Korea- (소아 위장관 이물 -강원지역 소아 60례-)

  • Lee, Young-Sub;Kang, Kae-Wool;Choi, Won-Kyu
    • Pediatric Gastroenterology, Hepatology & Nutrition
    • /
    • v.4 no.2
    • /
    • pp.148-154
    • /
    • 2001
  • Purpose: Ingested foreign bodies present a common clinical problem. It is well known that most of them pass uninterrupted through the gastrointestinal tract. We evaluated the role of endoscopy and Foley catheter for removal of foreign bodies in the gastrointestinal tract. Methods: We investigated retrospectively 60 cases with foreign bodies in the gastrointestinal tract. They had been treated at Wonju Christian Hospital, Yonsei University of Korea, from January, 1996 through December, 1999. Results: The age of the patients ranged from 7 months to 13 years. Patients under 5 years were 57 cases (97%) and there was no significant difference in sex (M : F=1.07 : 1). 45 cases of the patients had no symptom. The most common foreign bodies were coins (43 cases). The most common location was esophagus (31 cases). The number of foreign body removal using flexible endoscopy and Foley catheter was 22 (36.7%) and 18 (30.0%) cases, respectively. In 18 cases (30.0%), foreign bodies passed spontaneously. Only 1 case (1.7%), curtain pin impaction at ileocecal region, required surgery. Conclusion: Early foreign body removal from esophagus and stomach is recommended to lessen the morbidity and complication. Fluoroscopic foley catheter technique and flexible endoscopy for removal of esophageal foreign bodies in children is safe and effective.

  • PDF

Characteristic of Vibration in Windturbine System (풍력발전시스템의 진동특성)

  • Kim, Jung-Su;Lee, Hyoung-Woo;Park, No-Gill;Kim, Young-Duk;Kim, Soo-Yum;Lee, Dong-Hwan
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.35 no.6
    • /
    • pp.786-795
    • /
    • 2011
  • This paper described the characteristic of vibration in wind turbine system including gearbox housing, gear drive, blade, generator. Especially, in planetary gear set, planet gears are supported by flexible pin. So, in planet gear, to consider not only torsional movement but also lateral movement. And include housing movement, because wind turbine system is supported by mount. To find out the characteristic of vibration, take the excitation source and study campbell diagram in operating range. Results of campbell diagram, resonances are occurred at 81.2HZ, 104.7Hz by 2nd tooth passing frequency. And resonance are also occurred at 264.5HZ, 377Hz, 424.6Hz by 3th tooth passing frequency. From the result, take vibration reduced measures.

Analysis of the Segmental Reinforced Retaining Wall Behavior by Field Monitoring (현장계측을 통한 블럭식 보강토 옹벽의 거동분석)

  • Shin, Eun Chul;Lee, Chang-Seup
    • Journal of the Korean Geosynthetics Society
    • /
    • v.3 no.1
    • /
    • pp.3-15
    • /
    • 2004
  • Geogrid reinforced soil structures with segmental block facing have been increased since 1990's, because of the convenience of installation and the flexible appearance. In this paper, the behavior of the segmental reinforced retaining wall was analysed with the results of field monitoring. The height and length of reinforced wall are 12m and 25m, respectively. The field measurement equipments are horizontal and vertical earth pressure cells, settlement plate, strain gauge, inclinometer, and displacement pin. Based on the field monitoring, the horizontal earth pressure was approximately 0.3times higher than that of the theoretical method and the maximum tensile strength of reinforcement was 26.2kN/m. The displacement of facing wall was 23mm at the point of 7.1m height of the wall and toward the wall facing. The results of the study indicate that the segmental reinforced retaining wall is in a stable condition because of good compaction & reinforcement effects, and long period of construction time. Finally, the computer program of SRWall is very useful tool to design the segmental reinforced retaining wall.

  • PDF

Long-term performance of drainage system for leakage treatment of tunnel operating in cold region (한랭지역에서 운영 중인 터널의 누수처리를 위한 유도배수시스템의 장기 성능 평가)

  • Kim, Dong-Gyou
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.6
    • /
    • pp.1177-1192
    • /
    • 2018
  • The objective of this study is to develop the existing drainage system for catching the partial leakage of tunnel structures operating in cold region. The drainage system consists of drainage board, Hotty-gel as a waterproofing material, cover for preventing protrusion of Hotty-gel, air nailer, fixed nail, pipe for collecting ground leak, pipe for conveying ground leak, wire-mesh, and sprayed cement mortar. The drainage systems were installed in conventional concrete lining tunnels to evaluate the site applicability and constructability. The performances of waterproof and the drainage in the drainage system were evaluated by injecting 1,000 ml of red water in the back of the drainage system at 7 days, 14 days, 21 days, 28 days, 2 months, 3 months, 4 months, 5 months, 6 months, 7 months and 8 months. During 8 months of field test, the average daily temperature of the tunnel site was measured from $-16.0^{\circ}C$ to $25.6^{\circ}C$. The daily minimum temperature was $-21.3^{\circ}C$ and the daily maximum temperature was $30.8^{\circ}C$. There was no problem in waterproof and drainage performance of the drainage board in the drainage system. However, the pipe for conveying ground leak had the leakage problem from 14 days. It is considered that the leakage of the pipe for conveying ground leak was caused by the deformation of the pipe of the flexible plastic material having a thickness of 0.2 cm by using the high pressure air nailer and the fixing pin and the insufficient thickness and width of the hotty-gel for preventing the leakage.