• Title/Summary/Keyword: feasibility studies

Search Result 1,111, Processing Time 0.03 seconds

A Study on the Property Planning Process for the Highest and Best Use Development (건축물의 최유효 개발계획 수립을 위한 기획업무 절차에 관한 연구)

  • Kim, So-Yon;Park, Young-Ki
    • KIEAE Journal
    • /
    • v.7 no.5
    • /
    • pp.115-120
    • /
    • 2007
  • The purpose of the study is to establish a concept of property development planning process and factors by analyzing the several case studies, which prior proposed the highest and best use development of property. The value of property is dependent on the circumstances and the timing. Real property development is essential to develop in the highest and the best. The prior concepts of the highest and best use focused on the real estate appraisal, but these studies aroused an interest that related the highest and best use concept as a determinant of property development. As a results, this study suggests the process and the check points of property development planning phase. The first step is having a thorough grasp of the status of property. The Second step is the circumstantial analysis including legal restriction, locational environment, real estate market and economic conditions. The next step is, in accordance with these analysis, setting up the development concept and alternatives. Through the feasibility studies, we can make a choice the highest and best use development plan. In these days, the importance of development strategies such as design exceptionality and plan management are increased. Therefore, the integrated plan for the property development is very important.

Financial Feasibility Study by Considering Risk Factors for High-Rise Development Project (초고층 개발사업의 리스크 요인을 고려한 재무적 타당성 분석)

  • Chun, Young-Jun;Cho, Joo-Hyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.4
    • /
    • pp.3-16
    • /
    • 2017
  • Forecasting cash flow is very important but is difficult and complicated to analysis in high-rise development projects. And An expected value which was forecasted on the early stage is likely to fluctuate due to uncertainties around such complicated huge project to consider the probable uncertainty. There are not objectified method which are able to cope with uncertainty of project, and feasibility study based on selected financial analysis does not include liquidity of cash flow. Through such a stochastic method, developer can cope with cash flow fluctuation and set up a financial plan. Also this study is meaningful for laying the foundation for high-rise development project and feasibility study as well as the suitability and accuracy of feasibility study. Analysis showed that NPV and IRR include residential apartments shows surplus revenue as return of apartments offset deficit of hotel and office. Factors influencing the project feasibility for high-rise development project are sales account of $1^{st}$ year and annual vacancy rate of office.

A Development of Quantitative Analysis Model for the Policy Analysis in Feasibility Study Using the Performance Assessment Method (성능평가기법을 활용한 타당성조사 정책적 분석단계의 정량적 의사결정모델 개발 - 복수대안의 타당성 평가를 중심으로 -)

  • Lim, Yong-Soo;Song, Hyun-Young;Jeong, Han-Kee;Jeong, Min-Chul;Kong, Jung-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.2
    • /
    • pp.89-100
    • /
    • 2011
  • As an impactive factor on industries and national economy, The Social Overhead Capital(SOC) is major factor to determine the national competitiveness and the investment of SOC is essential for its economic growth. Accordingly, introduction of the preliminary feasibility study and establishment of legal institutionalization and evaluation system has been carried out and reviewed since 1999. Nevertheless of these efforts, basic problems such as lack of scientific method for investment evaluation and loss of effectiveness on feasibility studies are continuously being brought up. Moreover, as the preliminary study to improve the mentioned problems is mainly focused on the economic and estimated demand analysis, the study of policy analysis, the most important phase during a feasibility study, is still insufficient. Therefore, in this paper, a quantitative decision-making model, to which the performance assessment method of Value Engineering(VE) is applied, is developed and proposed to improve the policy analysis of (preliminary) feasibility study that requires combining with relative studies, to induce quantitative analysis method, and to contribute the improvement of value on the political aspect for SOC investment goals and use as a strategic decision-making method by systematic analysis.

Economic and Technological Feasibility Study on Pre- and Post-Consumer Recycling of Disposable Diaper in Korea (국내 폐 기저귀 재활용의 경제적, 기술적 타당성 분석)

  • Ahn, JoongWoo;Kim, YoungSil
    • Resources Recycling
    • /
    • v.24 no.1
    • /
    • pp.43-50
    • /
    • 2015
  • An extensive literature survey and personal communication with relevant experts made it possible to understand economic and technical feasibility of disposable diaper recycling. Commercial level of soiled diaper recycling technology is currently available from a Dutch company, Knowaste Co., who owns a proprietary separation technology of the pulps, plastics and super absorbing polymer (SAP). In Korea, on the other hand, pre-consumer diaper recycling technology without material separation at its infancy converts manufacturing scraps into refuse plastic fuel (RPF), container/truck cargo boards or automobile boards/sheets. Although previous studies on feasibility of post-consumer recycling in Korea showed mutually contradictory implication, it was found out in this research that significantly positive economic feasibility can be obtained with pre-consumer diaper recycling. Subsequent recycling R&D including pre-consumer scrap and policy support may expedite 'Establishment of Sustainable Society.

A study on the status and improvement of preliminary feasibility study of culture and tourism projects (문화.관광부분사업의 예비타당성조사 실태분석 및 개선방안 연구 -운용관리비용 분석을 중심으로-)

  • Sun, Shu-Li;Kim, Ju-Hyung;Shin, Sung-Wooi;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.6
    • /
    • pp.129-138
    • /
    • 2007
  • According to the preceding research outcomes, feasibility studies on public construction projects were incorrect and subjective. To resolve the problems, Korean government initiated Preliminary Feasibility Study (PFS) system prior to undertaking the main feasibility study. The PSF can be categorized into four areas such as road, railroad, harbor, airport, and Culture & Tourism (C&T). Especially when it comes to complex due to the introduction of five-weekday working system and local $government^{\circ}{\phi}s$ self administrative system. As a result, the standardization and legislation of the PSF can not be operated effectively. Accordingly this paper seeks to 1) identify actual condition of conducted PSF in C&T; 2) set up analytical model considering cost factor of economical efficiency and seek obstacles of PSF system; 3) suggest improvement plan for construction PSF projects.

Evaluation of Ground Improvement on Sands at Yongjong Island Geotechnical Experimental Site (영종도 지반공학 야외시험장에서의 사질토지반 개량효과 평가)

  • 김동수;박형춘;김영웅;김수일
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1999.03a
    • /
    • pp.439-446
    • /
    • 1999
  • In situ experimental studies were Performed at Yongjong Island Geotechnical Experimental Site to evaluate the ground densification on sand deposited. Standard penetration test, cone penetration test, and SASW test were performed and soil profiles and quality of ground improvements were evaluated. The feasibility of applying SASW method were verified by comparing test results. The evaluation technique of in-situ density using SASW and resonant column tests was proposed, and the reliability of proposed method was verified by performing case studies.

  • PDF

Development of Feasibility Analysis Model for Developer-requested Housing Projects (공동주택 개발사업 수주를 위한 사업타당성 분석모델 개발)

  • Kim, Ki-Shin;Lee, Joong-Seok;Huh, Young-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.241-246
    • /
    • 2008
  • With construction industry recession, many construction companies are increasingly conducting the development projects by themselves. However, housing projects requested by developers still stand large portion. Although many studies on feasibility analysis were released, they mainly focused on economic feasibility and lacked research on factors and criterions of overall project. Also, because previous studies overly break downed factors related to project, they rarely used in practice. Therefore, this study developed the feasibility analysis model of housing development projects to help main contractors to easily and effectively decide if it is feasible enough to promote the projects requested by developers, and verified the reliability of the model. In this study, thirty one driving factors were identified under seven different categories and the criterion of each factor was also developed. The survey on important index of each factor found "salability", "economic feasibility", "site location" and "method of raising fund" significant. 3 projects were tested by the model and its results showed resonable reliability.

  • PDF

Verification of the Validity of WRF Model for Wind Resource Assessment in Wind Farm Pre-feasibility Studies (풍력단지개발 예비타당성 평가를 위한 모델의 WRF 풍황자원 예측 정확도 검증)

  • Her, Sooyoung;Kim, Bum Suk;Huh, Jong Chul
    • Transactions of the Korean Society of Mechanical Engineers B
    • /
    • v.39 no.9
    • /
    • pp.735-742
    • /
    • 2015
  • In this paper, we compare and verify the prediction accuracy and feasibility for wind resources on a wind farm using the Weather Research and Forecasting (WRF) model, which is a numerical weather-prediction model. This model is not only able to simulate local weather phenomena, but also does not require automatic weather station (AWS), satellite, or meteorological mast data. To verify the feasibility of WRF to predict the wind resources required from a wind farm pre-feasibility study, we compare and verify measured wind data and the results predicted by WAsP. To do this, we use the Pyeongdae and Udo sites, which are located on the northeastern part of Jeju island. Together with the measured data, we use the results of annual and monthly mean wind speed, the Weibull distribution, the annual energy production (AEP), and a wind rose. The WRF results are shown to have a higher accuracy than the WAsP results. We therefore confirmed that WRF wind resources can be used in wind farm pre-feasibility studies.

Development of Activity Pattern Analysis and its Application to the Health Check-up Service Organization (활동패턴분석방법론의 개발과 적용 : 종합건강검진서비스 적용사례를 중심으로)

  • Moon, Jae Ung;Ahn, Joong Ho
    • The Journal of Society for e-Business Studies
    • /
    • v.18 no.3
    • /
    • pp.69-92
    • /
    • 2013
  • Activity Pattern Analysis(APA) is the methodology to Design the functions of information systems, to Estimate the monetary value of IS based on Activity Based Costing, to Acquire feasibility of IT Project. This study shows APA case in Health Check-up Service Organization (G-Center) and the Utility of APA. G-Center had acquired Five Outcomes through APA: (1) IT Strategy, (2) IT Project Goals, (3) Transformed Business Process, (4) Functional Blueprint of Information Systems, (5) IT Project budget and its feasibility. APA consists of three analysis processes; Activity Separation, Activity Rearrangement, Activity Costing. APA is flexible in determinating the range and the time of analysis, and is able to expand the Actors(as analysis objects) based on the purpose of analysis by researcher. Eventually APA can be used to do internal IT Management effectively.

Performance Criteria to Assess the Remodeling Feasibility of Office Buildings (업무용 건축물 리모델링 사업성 평가 성능기준)

  • Yang, Keek-Young;Yoon, Yer-Wan;Jeong, Dong-Whan
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.2
    • /
    • pp.142-151
    • /
    • 2012
  • Despite the changes to demands and perceptions according to building deterioration, most of the previous studies on remodeling have focused on apartment buildings, which are residential buildings. Few studies have been conducted on buildings for general commercial use, or office buildings. Accordingly, this study set out to prepare a set of performance criteria to assess the remodeling feasibility of office buildings. For that purpose, 23 assessment items were devised, their importance was tested, 13 were extracted, and a set of scoring criteria for each item was prepared. Case analysis was conducted to check the reliability of the assessment items and scoring criteria. Through this analysis, it was found that the criteria were reliable.