Browse > Article
http://dx.doi.org/10.6106/KJCEM.2017.18.4.003

Financial Feasibility Study by Considering Risk Factors for High-Rise Development Project  

Chun, Young-Jun (Department of Real Estate Studies, Konkuk University)
Cho, Joo-Hyun (Department of Real Estate Studies, Konkuk University)
Publication Information
Korean Journal of Construction Engineering and Management / v.18, no.4, 2017 , pp. 3-16 More about this Journal
Abstract
Forecasting cash flow is very important but is difficult and complicated to analysis in high-rise development projects. And An expected value which was forecasted on the early stage is likely to fluctuate due to uncertainties around such complicated huge project to consider the probable uncertainty. There are not objectified method which are able to cope with uncertainty of project, and feasibility study based on selected financial analysis does not include liquidity of cash flow. Through such a stochastic method, developer can cope with cash flow fluctuation and set up a financial plan. Also this study is meaningful for laying the foundation for high-rise development project and feasibility study as well as the suitability and accuracy of feasibility study. Analysis showed that NPV and IRR include residential apartments shows surplus revenue as return of apartments offset deficit of hotel and office. Factors influencing the project feasibility for high-rise development project are sales account of $1^{st}$ year and annual vacancy rate of office.
Keywords
High-rise Building; Skyscraper; Supertall; Development Project; Risk Factors; Financial Feasibility Study; Stochastic Analysis; Deterministic Analysis; Monte Carlo Simulation;
Citations & Related Records
Times Cited By KSCI : 2  (Citation Analysis)
연도 인용수 순위
1 Gabel, J., Ursini, A., and Gerometta, M. (2017). CTBUH Year in Review: Tall Trends of 2016, The Council on Tall Buildings and Urban Habitat, CTBUH, pp. 1-2.
2 Chun, Y., and Cho, J. (2016). "Analysis on the Characteristics of Each Phase's Risk Factors for High-Rise Development Project" Korean Journal of Construction Engineering and Management, KICEM, 17(4), pp. 103-115.   DOI
3 Kim, M., and Lee, J. (2011). "A Study on the Vertical Usage Composition Characteristics of Super Highrise Buildings" Journal of the Architectural Institute of Korea, Planning and Design Section, 27(7), pp. 57-64.
4 Ministry of Land, Infrastructure and Transport, Korea agency for Infrastructure Technology Advancement (2010). Construction & Transportation R&D Report, pp. 79-81.
5 Park, J., Cho, Y., Kwon, K., and Paek, J. (2008). "Feasibility Analysis Model Study of Real-estate Development - Focused on Construction project Development of Apartment and Store" Journal of the Architectural Institute of Korea, Structural Section, 24(3), pp. 179-186.
6 Lee, W., amd Kim, Y. (2008). "A Study on the Characteristics through Actual Condition of Mixed Use Development" Journal of the Architectural Institute of Korea, Planning and Design Section, 24(10), pp. 175-180.
7 Lee, S., Choi, H., and Kang, K. (2007). "A financial feasibility analysis of architectural development projects that use probabilistic simulation analysis method" Korean Journal of Construction Engineering and Management, KICEM, 8(3), pp. 76-86.
8 Korea Tourism Organization (2016). Korea International Visitor Survey
9 Jonathan Mun (2005). "Applied Risk Analysis - Moving Beyond Uncertainty in Business" Eretec, p. 146.
10 N Seoul Tower Homepage, http://www.nseoultower.com